Alstom Movia R151

Passenger rail cars in Singapore From Wikipedia, the free encyclopedia

The Alstom Movia R151 is the seventh generation electric multiple unit (EMU) rolling stock in operation on the existing North–South (NSL) and East–West (EWL) lines of Singapore's Mass Rapid Transit (MRT) system. It is manufactured by Changchun Alstom Railway Vehicles[a], a joint venture of Alstom[b] and CRRC Changchun under Contract R151 as part of their Movia family of trains.

Stock typeElectric multiple unit
In service4 June 2023; 3 years ago (2023-06-04) – Present[1]
ManufacturersChangchun Alstom Railway Vehicles[a] (Alstom[b] and CRRC Changchun)
Built atChangchun, China[2]
Quick facts Stock type, In service ...
Alstom Movia R151
Alstom Movia R151 at Tuas Depot
Interior of the Alstom Movia R151
Stock typeElectric multiple unit
In service4 June 2023; 3 years ago (2023-06-04) – Present[1]
ManufacturersChangchun Alstom Railway Vehicles[a] (Alstom[b] and CRRC Changchun)
Built atChangchun, China[2]
Family nameMovia[3]
Replaced
Constructed2020 – 2026
Entered service4 June 2023; 3 years ago (2023-06-04)[1]
Number built636 vehicles (106 sets)
Number in service444 vehicles (74 sets)[c]
Formation6 per trainset
DT–M1–M2+M2–M1–DT
Fleet numbers
  • 151/152 – 165/166
    801/802 – 897/898
    901/902 – 997/998
Capacity1920 passengers (224 seats)
OperatorSMRT Trains Ltd (SMRT Corporation)
Depots
Lines served
Specifications
Car body constructionAluminium-alloy construction
Train length138.86 m (455 ft 6+78 in)
Car length
  • 23.83 m (78 ft 2 in) (DT)
  • 22.8 m (74 ft 10 in) (M)
Width3.2 m (10 ft 6 in)
Height3.7 m (12 ft 1+58 in)
Doors1,450 mm (57+18 in), 8 per car, 4 per side
Maximum speed
  • 90 km/h (56 mph) (design)
  • 80 km/h (50 mph) (service)
Traction systemAlstom MITrac TC1500 SiCVVVF
Acceleration1.15 m/s2 (3.8 ft/s2)
Deceleration
  • 1.2 m/s2 (3.9 ft/s2) (service)
  • 1.3 m/s2 (4.3 ft/s2) (emergency)
Electric systems750 V DC third rail
Current collectionCollector shoe
UIC classification2′2′+Bo′Bo′+Bo′Bo′+Bo′Bo′+Bo′Bo′+2′2′
Safety systemsThales SelTrac® moving block CBTC ATC under ATO GoA 3 (DTO), with subsystems of ATP, NetTrac ATS and CBI[5][6]
Coupling systemDellner
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Close

The new rolling stock progressively replaced all of the C151s, C651s and C751Bs, all of which had been in service for at least 25 years when the R151s entered service in 2023. These new trains are part of the North–South and East–West lines' core systems upgrade and renewal programme. 106 six-car high-capacity trainsets comprising 636 cars were delivered from 21 February 2022 onwards, with the first train entering service on the East–West Line on 4 June 2023.[1]

Overview

Builder's plate of a R151 train

In October 2016, the Land Transport Authority (LTA) announced plans to replace the first-generation rolling stock on the North–South and East–West lines[7][8] as part of an asset renewal programme for the two lines. The LTA awarded the contract for the replacement of the first-generation trains to Bombardier Transportation in July 2018, which comprised the provision of 66 new trains, and their maintenance and technical support, to replace all the first-generation C151 trains, which had been in service for more than 30 years.[2]

On 1 April 2019, Bombardier Transportation and the LTA launched a mockup of the interior of the R151 at the SG Mobility Gallery at LTA's office at Hampshire Road.[9]

In September 2020, the LTA ordered an additional 40 R151 trains at a cost of S$337.8 million, to replace all 19 second-generation C651 trains, and all 21 third-generation C751B trains, which had been in service for more than 20 years. These trains, and the ones ordered in 2018, were to be assembled by Bombardier in Changchun.[10]

The first two trains arrived in Singapore on 21 February 2022,[11][12] and the remaining trains will progressively be delivered. The trains underwent testing and commissioning works before entering passenger service from 4 June 2023.[1]

Tender

The tender for trains under Contract R151 closed on 4 September 2017 with five bids. The LTA subsequently shortlisted all of them, and the tender results were published.[13]

More information S/N, Name of Tenderer ...
S/N Name of Tenderer Amount (S$) Option 9 (Long Term Service Support)[14]
1 Alstom Transport S.A. / Alstom Transport (S) Pte Ltd Consortium 682,696,431.00 S$626,697,233.00
2 Bombardier (Singapore) Pte Ltd 827,075,921.00 SGD 269,652,420.94 + EUR 75,135,673.16 + GBP 2,670,699.27
3 Construcciones y Auxiliar de Ferrocarriles, S.A. 867,275,662.00 S$307,320,742
4 Hyundai Rotem Company 696,960,000.00 S$517,973,000.00
5 Kawasaki Heavy Industries, Ltd. / Kawasaki Heavy Industries(Singapore) Pte Ltd & CRRC Qingdao Sifang Consortium / Singapore CRRC Sifang Railway Vehicles Service Pte. Ltd. Consortium 941,906,324.00 S$1,111,653,342
Close

Design and features

Driver's cab of the Alstom Movia R151
Car Door Display of the Alstom Movia R151
Ceiling Level Display of the Alstom Movia R151

The exterior of the R151 trains feature a new livery of green and red stripes against a black and white background running around the cars, similar to the C151C. The interior of the trains sport certain design features similar to the C951, such as the matte finishing of the walls, positioning of the overhead lighting as well as the builder plates.

The trains include several unique engineering features, such as an onboard self-test system that checks whether the train is fit for operation prior to revenue service. In addition, four trains will be equipped with an automatic track inspection system consisting of cameras, lasers and sensors to detect rail defects.[2] Condition monitoring sensors and analytic systems will be subsequently equipped on all trains to detect developing faults and to facilitate prompt rectification as part of predictive maintenance.[15]

The trains have wider areas near the doors to facilitate efficient movement of passengers in and out of the train. Preliminary designs of the R151 featured tip-up seats to increase passenger capacity, while catering to parents with prams, wheelchair users and people with personal mobility devices or foldable bicycles without reducing seat count.[16][2] However, these tip-up seats has since been replaced with perch seats in the final product of the R151.[17]

Train formation

The coupling configuration of an R151 in revenue service is DT–M1–M2+M2–M1–DT. D stands for "driver's desk", M for "motor" and T for "trailer".

More information Car Type, Driver Cab ...
Cars of R151
Car Type Driver Cab Motor Collector Shoe Car Length Wheelchair Bay
m ft in
DT Yes No Yes 23.8378 ft 2.2 in No
M1 No Yes Yes 22.874 ft 9.6 in No
M2 No Yes Yes 22.874 ft 9.6 in Yes
Close

Notes

  1. Formerly Changchun Bombardier Railway Vehicles.
  2. Formerly Bombardier Transportation prior to its acquisition by Alstom.
  3. As of 29 October 2025.[4]