Wikiwand AI

Alto Lindoso Dam

Dam in Viana do Castelo District, Portugal From Wikipedia, the free encyclopedia

Alto Lindoso Dam (Portuguese: Barragem do Alto Lindoso) is a concrete double curvature arch dam on the Lima River in Ponte da Barca, Viana do Castelo District, Portugal. The dam lies in Peneda-Gerês National Park close to the border with Spain. The reservoir created by the dam is known as Alto Lindoso reservoir or Lindoso reservoir.

OfficialnameBarragem do Alto Lindoso
Coordinates41°52′19.2″N 8°12′9″W
PurposePower
Quick facts Official name, Location ...
Alto Lindoso Dam
Alto Lindoso Dam is located in Portugal
Alto Lindoso Dam
Alto Lindoso Dam
Location within Portugal
Official nameBarragem do Alto Lindoso
Locationmunicipality Ponte da Barca, Viana do Castelo District, Portugal
Coordinates41°52′19.2″N 8°12′9″W
PurposePower
StatusOperational
Construction began1983
Opening date1992
OwnerCompanhia Portuguesa de Produção de Electricidade
Dam and spillways
Type of damConcrete double curvature arch dam
ImpoundsLima
Height (foundation)110 m (360 ft)
Length297 m (974 ft)
Elevation at crest339 m (1,112 ft)
Width (crest)4 m (13 ft)
Width (base)21 m (69 ft)
Dam volume308,500 m3 (10,890,000 cu ft)
Spillway type2 shaft spillways
Spillway capacity2,760 m3 (97,000 cu ft)
Reservoir
Total capacity379,010,000 m3 (307,270 acre⋅ft)
Active capacity347,910,000 m3 (282,060 acre⋅ft)
Surface area10.72 km2 (4.14 mi2)
Normal elevation338 m (1,109 ft)
Power Station
OperatorEnergias de Portugal
Commission date1992
TypePumped-storage
Hydraulic head288 m (945 ft) (max)
Turbines2 x 317 MW Francis-type
Installed capacity630 MW
Annual generation933.8 GWh
Close

History

Construction of the dam began in 1983.[1] On 15 August 1991 the land behind the dam lying in Spain was compulsorily acquired by Portuguese company EDP (Electricidade de Portugal), based on an old deal between dictators General Franco of Spain and António de Oliveira Salazar of Portugal. Residents of the five villages which were going to be drowned by the dam, Aceredo, Buscalque, O Bao, A Reloeira and Lantemil, supported by left-leaning political parties, immediately began protests against the building of the dam,[2] including a ten-day hunger strike. In the end, with no option but to move, the residents of Aceredo (a town with 70 houses and 120 citizens) relocated bodies from their cemetery, and a historic church was moved to a different town. Some moved to nearby villages, others far away.[3]

The dam was completed in 1992 and drowned the five villages.[2] It is owned by Companhia Portuguesa de Produção de Electricidade (CPPE). The dam is used for power production.[1]

Dam

Alto Lindoso Dam is 110 m (360 ft) tall (height above foundation) and 297 m (974 ft) long double curvature arch dam with a crest altitude of 339 m (1,112 ft).[1] The width at the base is 21 m (69 ft) (crest 4 m (13 ft)).[4] The volume of the dam is 308,500 m3 (10,890,000 cu ft). The dam contains two shaft spillways with three gates each (combined maximum discharge 2,760 m3 (97,000 cu ft)/s) and two bottom outlets (combined maximum discharge 400 m3 (14,000 cu ft)/s.[1]

Reservoir

A Sentinel-2 image of the reservoir.

At full reservoir level of 338 m (1,109 ft) (maximum flood level of 339 m (1,112 ft)) the reservoir of the dam has a surface area of 10.72 km2 (4.14 sq mi)[4][5] and its total capacity is 379.01 million m3 (13.385 billion cu ft). Its active capacity is 270 hm3 (9.5×109 cu ft).[6] Minimum operating level is 280 m (920 ft).[1] With the 347.9 million m3 (12.29 billion cu ft) of water, 224.6 GWh of electricity can be produced.[7]

The formerly drowned village of Aceredo in 2022 emerged again after prolonged drought.[8][9]

Power plant

The pumped-storage[5] hydroelectric power plant went operational in 1992. It is owned by CPPE, but operated by EDP. The plant has a nameplate capacity of 630[1][5][7] (634)[6] MW. Its average annual generation is somewhat more than 900 GWh.[7][10][6][1][5]

The power station contains 2 Francis turbine-generators of 317 MW (350 MVA) each in an underground powerhouse 340 m (1,120 ft) below the surface.[4] The turbine rotates at 214.3 rpm. The minimum hydraulic head is 227 m (745 ft), the maximum 288 m (945 ft). Maximum flow per turbine is 125 m3 (4,400 cu ft)/s.[7]

As lower reservoir for Alto Lindoso the reservoir of Touvedo dam is used,[5] which is connected via a tailrace tunnel with a length of 4,883 m (16,020 ft).[4][10]

See also

References

Related Articles

Timelines

Top Qs

Fact Checks