Wikiwand AI

Anzhen Qiao station

Beijing Subway Line 12 station From Wikipedia, the free encyclopedia

Anzhen Qiao station (simplified Chinese: 安贞桥站; traditional Chinese: 安貞橋站; pinyin: Ānzhēn Qiáo zhàn) is a station on Line 12 of the Beijing Subway. It opened on December 15, 2024.[1]

SimplifiedChinese安贞桥站
TraditionalChinese安貞橋站
Hanyu PinyinĀnzhēn Qiáo zhàn
Hanyu PinyinĀnzhēn Qiáo zhàn
Quick facts Chinese name, Simplified Chinese ...
Anzhen Qiao

安贞桥
Beijing Subway
Eastbound platform (towards Dongbabei)
Chinese name
Simplified Chinese安贞桥站
Traditional Chinese安貞橋站
Transcriptions
Standard Mandarin
Hanyu PinyinĀnzhēn Qiáo zhàn
General information
LocationAnzhen Bridge, at the intersection of North 3rd Ring Road East, Andingmen Outer Street (安定门外大街) and Anding Road (安定路)
On the border between Anzhen Subdistrict in Dongcheng District and Hepingli Subdistrict in Chaoyang District, Beijing
China
Coordinates39°58′02″N 116°24′04″E
OperatorBeijing Mass Transit Railway Operation Corporation Limited
Line     Line 12
Platforms2 (1 split island platform)
Tracks2
Construction
Structure type
Underground
AccessibleYes
History
OpenedDecember 15, 2024; 20 months ago (2024-12-15)
Services
Preceding station Beijing Subway Following station
Anhua Qiao Line 12 Heping Xiqiao
towards Dongbabei
Location
Anzhen Qiao is located in Beijing
Anzhen Qiao
Anzhen Qiao
Location within Beijing
Close

Location

The station is located under the North 3rd Ring Road East at the intersection of Andingmen Outer Street and Anding Road under Anzhen Bridge. It is on the border between Anzhen Subdistrict in Dongcheng District and Hepingli Subdistrict in Chaoyang District.[2]

Station features

The station has an underground split island platform.[3]

Exits

There are 4 exits, lettered A, B, C and D. Exits A and C have accessible elevators. Exit C also has a direct passageway to the Sheraton Jinyu Hotel and the Global Trade Center, but it has not yet been completed.[4]

References

Related Articles

Timelines

Top Qs

Fact Checks