Aqua Line (Noida Metro)

Line of the Noida Metro system From Wikipedia, the free encyclopedia

The Aqua Line is a line of Noida Metro, a rapid transit system in Noida and Greater Noida in Uttar Pradesh, India. It consists of 21 metro stations from Sector 51 in Noida to Depot in Greater Noida.[3]

StatusOperational
Termini
Quick facts Noida Metro Aqua Line, Overview ...
Noida Metro Aqua Line
Overview
StatusOperational
OwnerNoida Metro Rail Corporation
LocaleNoida, Greater Noida
Termini
Stations21
Service
TypeRapid transit
SystemNoida Metro
Operator(s)Delhi Metro Rail Corporation
Rolling stockCRRC Nanjing Puzhen
Daily ridershipNA
History
Opened25 January 2019; 7 years ago (2019-01-25)[1]
Technical
Line length29.7 kilometers (18.5 mi)[2]
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC overhead catenary
Route map

Noida Sector 51
Rainbow
Noida Sector 76
Noida Sector 101
Noida Sector 81
NSEZ
Noida Sector 83
Noida Sector 137
Noida Sector 142
Noida Sector 143
Noida Sector 144
Noida Sector 145
Noida Sector 146
Noida Sector 147
Noida Sector 148
Knowledge Park II
Pari Chowk
ALPHA 1
DELTA 1
GNIDA Office
Depot Station
Close

The line has been operational since 25 January 2019. It was inaugurated by the Chief Minister of Uttar Pradesh, Yogi Adityanath.[4]

Stations

All 21 stations on the 29.7 kilometres (18.5 mi) Aqua Line route are on elevated track.[5][6][7] This line has an interchange station with the Delhi Metro at Noida Sector 52 metro station.[8] All stations are equipped with platform screen doors.

More information #, Station name ...
Aqua Line
# Station name Phase Opening Interchange Connection Station Layout Platform Level Type Depot Connection Depot Layout
EnglishHindi
1Noida Sector 51नोएडा सेक्टर 51125 January 2019Logo of the Delhi Metro Blue LineElevatedSideNone None
2Noida Sector 50नोएडा सेक्टर 50 1 25 January 2019None Elevated Side None None
3Noida Sector 76नोएडा सेक्टर 76 1 25 January 2019 None Elevated Side None None
4Noida Sector 101नोएडा सेक्टर 101 1 25 January 2019 None Elevated Side None None
5Noida Sector 81नोएडा सेक्टर 81 1 25 January 2019 None Elevated Side None None
6NSEZएन॰एस॰ई॰ज़ेड॰ 1 25 January 2019 None Elevated Side None None
7Noida Sector 83नोएडा सेक्टर 83 1 25 January 2019 None Elevated Side None None
8Noida Sector 137नोएडा सेक्टर 137 1 25 January 2019 None Elevated Side None None
9Noida Sector 142नोएडा सेक्टर 142 1 25 January 2019 None Elevated Side None None
10Noida Sector 143नोएडा सेक्टर 143 1 25 January 2019 None Elevated Side None None
11Noida Sector 144नोएडा सेक्टर 144 1 25 January 2019 None Elevated Side None None
12Noida Sector 145नोएडा सेक्टर 145 1 25 January 2019 None Elevated Side None None
13Noida Sector 146नोएडा सेक्टर 146 1 25 January 2019 None Elevated Side None None
14Noida Sector 147नोएडा सेक्टर 147 1 25 January 2019 None Elevated Side None None
15Noida Sector 148नोएडा सेक्टर 148 1 25 January 2019 None Elevated Side None None
16Knowledge Park IIनॉलेज पार्क II 1 25 January 2019 None Elevated Side None None
17Pari Chowkपरी चौक 1 25 January 2019 None Elevated Side None None
18ALPHA 1अल्फा 1 1 25 January 2019 None Elevated Side None None
19DELTA 1डेल्टा 1 1 25 January 2019 None Elevated Side None None
20GNIDA Officeग्रेनो ऑफिस 1 25 January 2019 None Elevated Side None None
21Depot Stationडिपो स्टेशन 1 25 January 2019 None Elevated SideDepot StationAt Grade
Close

Construction

The NMRC has divided the Civil Construction work of Aqua Line (21 stations and 1 Depots) into multiple packages. The list of all construction contract is as follows:

More information Package, Stations ...
Package Stations Contractor
NC-01 Noida Sector-51 to Noida Sector-137
(8 stations)
CEC and Sam India Buitwell (JV)
NC-02 Noida Sector-142 to Noida Sector-148
(7 stations)
CEC and Sam India Buitwell (JV)
NC-03 Knowledge Park II to Depot
(6 stations)
CEC and Sam India Buitwell (JV)
NC-04 Greater Noida Depot
(1 Depot)
Anupam Constructions
NGNC-01 Noida Sector-122 to Gr. Noida Sector-2
(5 stations)
GR Infraprojects
Close

Note: The construction work of Package NGNC-01 will start by 2023 end.

Future extensions

See also

References

Related Articles

Wikiwand AI