Wikiwand AI

Aspatria railway station

Railway station in Cumbria, England From Wikipedia, the free encyclopedia

Aspatria railway station is a railway station serving the town of Aspatria in Cumbria, England. It is on the Cumbrian Coast Line, which runs between Carlisle and Barrow-in-Furness. It is owned by Network Rail and managed by Northern Trains.

LocationAspatria, Cumberland
England
Coordinates54°45′33″N 3°19′53″W
Quick facts General information, Location ...
Aspatria
National Rail
General information
LocationAspatria, Cumberland
England
Coordinates54°45′33″N 3°19′53″W
Grid referenceNY143412
OwnerNetwork Rail
ManagerNorthern Trains
Platforms2
Tracks2
Other information
Station codeASP
ClassificationDfT category F2
History
Original company
Maryport and Carlisle Railway
Pre-groupingMaryport and Carlisle Railway
Post-groupingLondon, Midland and Scottish Railway
British Rail (London Midland Region)
Key dates
12 April 1841Opened
Passengers
2020/21Decrease 9,968
2021/22Increase 25,962
2022/23Increase 27,878
2023/24Increase 28,040
2024/25Increase 31,666
Location
Aspatria is located in the former Allerdale Borough
Aspatria
Aspatria
Location within the former Allerdale Borough
Aspatria is located in Cumbria
Aspatria
Aspatria
Location within Cumbria
Notes
Passenger statistics from the Office of Rail and Road
Close

History

The station was opened by the Maryport and Carlisle Railway on 12 April 1841, although the line heading north-east to Wigton was not completed until 1845.

The station was once the junction for the branch line to Mealsgate. Passenger trains on this line began on 2 April 1866, but ceased on 22 September 1930. Complete closure of the line followed on 1 December 1952.[1]

The station became part of the London, Midland and Scottish Railway during the Grouping of 1923, and then passed on to the London Midland Region of British Railways on nationalisation in 1948. When sectorisation was introduced in the 1980s, the station was served by Regional Railways until the privatisation of British Railways.

The station signal box was the last surviving example built by the Maryport and Carlisle company, prior to its closure and demolition in 1998.[2]

Facilities

The station is unstaffed and has no ticket machine (though one is to be installed during 2019), so tickets must be purchased prior to travel or on the train (the main buildings are now in private residential use). Shelters are located on both platforms. Timetable posters, digital information screens and a telephone are provided to give train running information, whilst there is also public wifi access on offer. The platforms are linked by footbridge and there is step-free access to each one.[3]

Services

More information Northern TrainsRoute 6, Cumbrian Coast, Furness & Windermere lines ...
Northern Trains
Route 6
Cumbrian Coast, Furness
& Windermere lines
Carlisle
Dalston
Wigton
Aspatria
Maryport
Flimby
Workington
Harrington
Parton
Whitehaven
Corkickle
St Bees
Nethertown
Braystones
Sellafield
Seascale
Drigg
Ravenglass
Heritage railway
Bootle
Silecroft
Millom
Green Road
Foxfield
Kirkby-in-Furness
Askam
Barrow-in-Furness
Roose
Dalton
Ulverston
Cark & Cartmel
Kents Bank
Grange-over-Sands
Arnside
Silverdale
Carnforth
Windermere
Staveley
Burneside
Kendal
Oxenholme Lake District
Lancaster
Preston
Chorley
Bolton
Deansgate
Manchester Metrolink
Manchester Oxford Road
Manchester Piccadilly
Manchester Metrolink
Manchester Airport
Manchester Metrolink Airport interchange
Close

Following the May 2021 timetable change, the station is served by an hourly service between Carlisle and Barrow-in-Furness, with some trains continuing to Lancaster. During the evening, the station is served by an hourly service between Carlisle and Whitehaven. All services are operated by Northern Trains.[4]

Rolling stock used: Class 156 Super Sprinter and Class 158 Express Sprinter[citation needed]

In May 2018, Northern introduced a Sunday service between Whitehaven and Barrow-in-Furness, the first Sunday service to operate south of Whitehaven for over 40 years.[5][6]

On 5 February 2024 Northern was criticised for continuing to mispronounce the station name, six months after its announcements had been re-recorded. The name was still being announced "As-spat-ria" rather than "As-spay-tria". The company said it was aiming to complete the roll-out of its updates by the "summer".[7]

See also

References

Sources

Further reading

Related Articles

Timelines

Top Qs

Fact Checks