Wikiwand AI

Whitehaven railway station

Railway station in Cumbria, England From Wikipedia, the free encyclopedia

Whitehaven railway station serves the coastal town of Whitehaven, in Cumbria, England. It is a stop on the Cumbrian Coast Line, which runs between Carlisle and Barrow-in-Furness. It is owned by Network Rail and managed by Northern Trains.

LocationWhitehaven, Cumberland
England
Coordinates54°33′12″N 3°35′14″W
Quick facts General information, Location ...
Whitehaven
National Rail
General information
LocationWhitehaven, Cumberland
England
Coordinates54°33′12″N 3°35′14″W
Grid referenceNX974188
OwnerNetwork Rail
ManagerNorthern Trains
Platforms2
Tracks2 (1 bay platform)
Other information
Station codeWTH
ClassificationDfT category E
History
Original company
Whitehaven Junction Railway
Pre-groupingFurness Railway
London and North Western Railway
Post-groupingLondon, Midland and Scottish Railway
British Rail (London Midland Region)
Key dates
19 March 1847Opened as Whitehaven
20 December 1874Resited and renamed Whitehaven Bransty
6 May 1968Renamed Whitehaven
Passengers
2020/21Decrease 67,378
2021/22Increase 0.221 million
2022/23Increase 0.241 million
2023/24Increase 0.255 million
2024/25Increase 0.285 million
Location
Whitehaven is located in the former Borough of Copeland
Whitehaven
Whitehaven
Location within the former Borough of Copeland
Whitehaven is located in Cumbria
Whitehaven
Whitehaven
Location within Cumbria
Notes
Passenger statistics from the Office of Rail and Road
Close

History

A 1904 Railway Clearing House junction diagram showing railways in the vicinity of Whitehaven (FR in blue; LNWR in red)

The first station at Whitehaven was opened on 19 March 1847 by the Whitehaven Junction Railway (WJR),[1] as the terminus of their line from Maryport.[2] This station lay to the south of the present station, with the main entrance on Bransty Row.[nb 1]

On the southern side of the town, the first section of the Whitehaven and Furness Junction Railway (W&FJR) opened on 1 June 1849 from a terminus at Whitehaven (Preston Street) to Ravenglass, but there was no connection between this line and the WJR suitable for passenger trains. In between the two stations stood the town centre and, to the east of that, Hospital Hill; a tunnel 1,333 yards (1,219 m) long was built beneath the latter, being completed in July 1852. In 1854, the W&FJR passenger trains began using the WJR station at Whitehaven, with Preston Street becoming a goods-only station.[3] In 1865, the W&FJR was absorbed by the Furness Railway (FR) and, in 1866, the WJR was absorbed by the London and North Western Railway (LNWR).[2]

The LNWR station (formerly WJR) was replaced on 20 December 1874 by a new one named Whitehaven Bransty; it was jointly owned by the LNWR and the FR. This station had its name simplified to Whitehaven on 6 May 1968.[1] The original buildings were demolished and replaced by a modern single-story ticket hall in the mid-1980s. The former goods yard site beyond and behind platform one is now occupied by a supermarket.

The station formerly had four operational platforms, but only two remain in use today (the former platforms three and four having lost their tracks when the layout was simplified and the buildings replaced). The double line from Parton becomes single opposite the station signal box, which still bears the original station name Whitehaven Bransty; it then splits into two: one runs into platform one (a bay used by most terminating services from Carlisle) and the other runs into platform two, which is the through line to Sellafield, Millom and Barrow. Trains heading south must collect a token for the single line section to St Bees from a machine on the platform (with the co-operation of the signaller) before they can proceed. Conversely, trains from Barrow must surrender the token upon arrival; the driver returns it to the machine before departing for Workington; only then can the signaller allow another train to enter the single line section.

A Sunday service over the whole length of the Coastal route operated on a one-off basis on Sunday 27 September 2009; the first time a revenue earning passenger Sunday service operated south of Whitehaven since May 1976. This celebrated the ACoRP Community Rail Festival. An improved Sunday service has been introduced as part of the current Northern franchise.[4]

Facilities

The ticket office is open six days per week and is closed evenings and Sundays; there is also a ticket machine available. Digital display screens, a passenger announcement system and information posters provide train running information. Step-free access is available through the main building to both platforms.[5]

Services

More information Northern TrainsRoute 6, Cumbrian Coast, Furness & Windermere lines ...
Northern Trains
Route 6
Cumbrian Coast, Furness
& Windermere lines
Carlisle
Dalston
Wigton
Aspatria
Maryport
Flimby
Workington
Harrington
Parton
Whitehaven
Corkickle
St Bees
Nethertown
Braystones
Sellafield
Seascale
Drigg
Ravenglass
Heritage railway
Bootle
Silecroft
Millom
Green Road
Foxfield
Kirkby-in-Furness
Askam
Barrow-in-Furness
Roose
Dalton
Ulverston
Cark & Cartmel
Kents Bank
Grange-over-Sands
Arnside
Silverdale
Carnforth
Windermere
Staveley
Burneside
Kendal
Oxenholme Lake District
Lancaster
Preston
Chorley
Bolton
Deansgate
Manchester Metrolink
Manchester Oxford Road
Manchester Piccadilly
Manchester Metrolink
Manchester Airport
Manchester Metrolink Airport interchange
Close

Northern Trains operates a generally hourly service northbound to Carlisle and southbound to Barrow-in-Furness; no late evening service operates south of here. A few through trains operate to/from Lancaster via the Furness line.[6]

Northern Rail introduced a regular Sunday through service to Barrow via the coast at the May 2018 timetable change - the first such service south of Whitehaven for more than 40 years. Services run approximately hourly from mid-morning until early evening, with later trains starting and terminating here. This represented a major upgrade on the previous infrequent service of four per day each way to/from Whitehaven only.[7][8] Repairs to the tunnel southwards to Corkickle and Millom/Barrow saw services beyond here suspended in July 2025, with a replacement bus service provided through the town to Corkickle for onward connections. This will remain until the old mine workings beneath the tunnel floor have been sealed and filled with grout - repairs are likely to continue until the spring of 2026.[9] Services remain running to Workington and Carlisle.

More information Preceding station, National Rail ...
Preceding station National Rail National Rail Following station
Parton   Northern Trains
Cumbrian Coast Line
  Corkickle
  Historical railways  
Parton   London and North Western Railway
Whitehaven Junction Railway
  Terminus
Terminus   Whitehaven and Furness Junction Railway   Corkickle
Close

Notes

  1. The grid reference of the former site at Bransty Row is:grid reference NX974186

References

Related Articles

Timelines

Top Qs

Fact Checks