Awel y Môr is a proposed offshore wind farm located off the coast of north Wales, to the west of Gwynt y Môr. It will be located about 10 km (6.2 mi; 5.4 nmi) north of Rhyl, Denbighshire. It is expected to have between 34 and 50 turbines, with a maximum height of 331 m (1,086 ft), although the design is yet to be finalised.[1][2]

Official nameAwel y Môr Fferm Wynt Alltraeth
CountryWales, United Kingdom
Coordinates53.491°N 3.611°W / 53.491; -3.611
StatusProposed
Quick facts Official name, Country ...
Awel y Môr Offshore Wind Farm
Official nameAwel y Môr Fferm Wynt Alltraeth
CountryWales, United Kingdom
Coordinates53.491°N 3.611°W / 53.491; -3.611
StatusProposed
Commission dateExpected 2030/2031
OwnerRWE
Wind farm
TypeOffshore
Site area78 km2 (30 sq mi)
Power generation
Nameplate capacity775 MW (proposed)
External links
Websitehttps://awelymor.cymru/
Close

The project is being developed by RWE, in conjunction with SWM and Siemens Financial Services.[3] It is claimed by the developer that the project could create up to 2000 jobs during the construction phase.[1]

In January 2026, the project was awarded Contracts for Difference for 775 MW at £91.20/MWh (2024 prices), as part of the seventh Allocation Round.[3] This will be the first offshore wind farm built in Wales for 10 years.[1]

Development, planning and consenting

In August 2020, RWE Renewables submitted a scoping report for the project, proposing to build around another 100 turbines next to the Gwynt y Môr wind farm. Combined the two projects were slated to be "one of the biggest offshore wind farms in the world".[4]

In 2021, following public consultation, the project was scaled back to between 35 and 50 turbines, due to concerns about the visual impact.[5] Council officers gave four reasons to object to the scheme:

  1. Significant detriment to the seascape character and coastal views, from both the scale of individual turbines, and the extent of the project as a whole.
  2. Impact on tourism and recreation, give Llandudno's reputation as a 'traditional' resort.
  3. Detriment to heritage assets in Conwy, including the Llandudno Conservation Area and Llandudno Pier.
  4. Lack mitigation against adverse impact from construction.[6]

On 20 June 2022, an application to Natural Resources Wales for a marine licence for the wind farm. This was granted on 15 November 2023.[7]

In September 2023, consent for the project was granted by Claire Coutinho, the Secretary of State for Energy Security and Net Zero.[2]

In May 2025, Awel y Môr was one of seven projects where the Crown Estate increased the lease capacity, to maximise the potential from existing sites.[8]