In January 2026 the nameplate capacity of offshore wind farms in operation was approximately 16 GW, with a further 10.4 GW under construction and 1.4 GW in pre-construction. Contracts for difference for a further 9.8 GW have been awarded by the UK Government. A further 40.6 GW are in early planning stages.
If all proposed wind farms are developed, by the 2030s, the United Kingdom's nameplate capacity is expected to reach approximately 76 GW.
A total of 3.9 GW of proposed OWFs has been cancelled.
Map of the UK offshore wind farms
In July 2025, there were offshore wind farms consisting of 2,809 turbines with a combined capacity of 16,035 megawatts. Strike price is based on £/MWh at 2012 prices.
| Abbreviation | Explanation |
|---|---|
| Cap. | The rated nameplate capacity of the wind farm. |
| No. | The number of wind turbines. |
| Model | The model of wind turbine. |
| Cost | The total capital cost of the project up to commissioning. |
| Cap. fac. | The average capacity factor, i.e. the average power generated by the wind farm, as a percentage of its nameplate capacity. |
| Km to shore | The average distance of the wind farm to shore, or (where available) the distance from the in-farm transformer/substation to the shore. |
| Depth range (m) | The range of minimum to maximum depths of water in which the wind farm is sited. |
| Refs | The source references for the information. The [w ...] footnotes link to each wind farm's own home page. |
Wind farms under construction
These are offshore wind farms currently under construction (offshore), with a combined capacity in February 2026 of 10,392 MW. Strike price is based on £/MWh at 2012 prices.
| Name | Country | Location | Cap. (MW) |
No. | Model | Project commissioning | Strike price | Depth range (m) |
Km to shore |
Owner | Refs. |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Sofia Offshore Wind Farm | England | 55°00′N 1°56′E / 55.0°N 1.93°E | 1400 | 100 | Siemens Gamesa SG 14-222 DD | 2026 | 39.65 | 195 | RWE | [59][60][61][62][63] | |
| Dogger Bank A | England | 54°46′12″N 1°55′01″E / 54.77°N 1.917°E | 1235 | 95 | GE-Haliade X 13 MW | 2026 | 39.65 | 131 | SSE Renewables, Equinor | [59][64][65][66][67][68] | |
| Dogger Bank B | England | 54°59′05″N 1°39′12″E / 54.98462°N 1.65343°E | 1235 | 95 | GE-Haliade X 13 MW | 2027 | 41.61 | SSE Renewables, Equinor | [59][65][66][67][69] | ||
| Dogger Bank C | England | 55°01′20″N 2°42′38″E / 55.02233°N 2.71059°E | 1218 | 87 | GE-Haliade X 14 MW | 2027 | 41.61 | SSE Renewables, Equinor | [59][70][66][67][69] | ||
| East Anglia Three | England | TM097462 | 1372 | 95 | Siemens Gamesa SG 14-236 DD | 2026 | 37.35 (159 MW for AR6 @ 54.23) | Iberdrola | [71][72][73][74][75][76] | ||
| Inch Cape | Scotland | NT394753 | 1080 | 72 | Vestas V236-15 | 2027 | 37.35 (251 MW for AR6 @ 54.23) | Inch Cape Offshore | [77][75] | ||
| Hornsea Three | England | TG210034 | 2852 | 197 | Siemens Gamesa SG 14-236 DD | 2027 | 37.35 (1080 MW for AR6 @ 54.23) | 160 | Ørsted | [78][79][80][81][75] |
Pre-construction wind farms
These are wind farms that have started onshore construction and have been awarded contracts under the UK Government's Contracts for Difference Round 4 (2022) and Round 7 (2026) for Vanguard. Total capacity of 4,470 MW. Strike price is based on £/MWh at 2012 prices for Norfolk Boreas and £/MWh at 2024 prices for Vanguard.
| Name | Country | Location | Cap. (MW) |
No. | Model | Project commissioning |
Strike price | Depth range (m) |
Km to shore |
Owner | Refs. |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Norfolk Boreas | England | 53°00′00″N 2°56′00″E / 53.00000°N 2.93333°E | 1380 | Vestas | 2027 | 37.35 | 72 | RWE | [82][83][84][85][86] | ||
| Norfolk Vanguard West | England | 52°55′53″N 2°28′32″E / 52.931258°N 2.475668°E | 1545 | 92 | Vestas V236-15[87] | 2028/29 | 91.20 | 30-46 | RWE | [85][86][88] | |
| Norfolk Vanguard East | England | 52°53′19″N 2°56′07″E / 52.888493°N 2.935289°E | 1545 | 92 | Vestas V236-15[87] | 2028/29 | 91.20 | 30-41 | RWE | [89][85][86][88] |
Proposed wind farms - Contracts for Difference Round 6
These are wind farms proposed under the Round 6 (2024) CFD auction,[90] with a combined capacity of 1,363 MW. Strike price is based on £/MWh at 2012 prices.
| Name | Country | Location | Cap. (MW) |
No. | Model | Project commissioning |
Strike price | Depth range (m) |
Km to shore |
Owner | Notes | Refs. |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| East Anglia Two | England | TM415611 | 963 | 2029 | 58.87 | Iberdrola | [75] | |||||
| Green Volt OWF | Scotland | NJ830445 | 400 | 2029 | 139.93 | Green Volt | [75] |
Note: this table does not include OWFs that were awarded contracts in AR4, and have now received a new contract as a result of permitted reduction in AR6.
Proposed wind farms - Contracts for Difference Round 7
These are wind farms proposed under the Round 7 (2025/6) CFD auction,[91] with a combined capacity of 5,347.5 MW. Strike price is based on £/MWh at 2024 prices.
| Name | Country | Location | Cap. (MW) |
No. | Model | Project commissioning |
Strike price | Depth range (m) |
Km to shore |
Owner | Notes | Refs. |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Awel y Môr | Wales | SJ015735 | 775 | 2030/31 | 91.20 | Awel y Môr OWF Ltd | [92] | |||||
| Berwick Bank Phase B | Scotland | NT307745 | 1380 | 2030/31 | 89.49 | Berwick Bank B Ltd | Only Phase B | |||||
| Dogger Bank SE | England | TA044349 | 1500 | 2030/31 | 91.20 | RWE Renewables UK | [93][94][95] | |||||
| Dogger Bank SW | England | TA044349 | 1500 | 2030/31 | 91.20 | RWE Renewables UK | [93][94][95] | |||||
| Erebus | Wales | SM935014 | 100 | 2029/30 | 216.49 | Blue Gem Wind Ltd | ||||||
| Pentland Floating OWF | Scotland | NC981666 | 92.5 | 2029/30 | 216.49 | Highland Wind Ltd | [96][97][98] |
Proposed wind farms - early planning
These are wind farms that are in an exploratory phase and have not yet secured a Contract for Difference at auction.
Total capacities: England: 10,060 MW - Scotland: 26,226 MW
| Name | Country | Location | Cap. (MW) |
No. | Model/
capacity |
Technology | Project commissioning |
Option price | Depth range (m) |
Km to shore |
Owner | Notes | Refs. |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| East Anglia One North | England | 800 | Fixed | 2026 | 69 | Iberdrola | [71] | ||||||
| Rampion 2 Extension | England | 50°40′00″N 0°16′00″W / 50.66667°N 0.26667°W | 1200 | 90 | Fixed | 2030 | E.ON | April 2025: granted development consent by Government. | [99][100] | ||||
| Five Estuaries | England | Adjacent to Galloper Wind Farm | 1080 | up to 79 | Fixed | RWE | [101] | ||||||
| North Falls | England | Adjacent to Greater Gabbard wind farm | 504 | up to 72 | Fixed | SSE Renewables, RWE | [102] | ||||||
| Dogger Bank D | England | 1320 | Fixed | SSE Renewables, Equinor | Signed lease with Crown Estate - Jan 2023 | [103][94] | |||||||
| Berwick Bank | Scotland | Outer Firth of Forth | 2720 | Fixed | 2030 | SSE Renewables | Does not include Phase B which as was awarded a CfD in AR 7 | [104][105] | |||||
| Seagreen Phase 1A | Scotland | 500 | Fixed | SSE Renewables, TotalEnergies | [106] | ||||||||
| Outer Dowsing | England | Off the Lincolnshire Coast, East of the Humber Estuary | 1500 | Fixed[107][108] | 2030 | £125m | 54 | Corio Generation, TotalEnergies | Aug 2022 - scoping report sent to the Planning Inspectorate.
Signed lease with Crown Estate - Jan 2023 |
[109][110][111][94][95] | |||
| Morecambe | England | Off the Lancashire Coast, West of Blackpool and South West of Morecambe Bay | 480 | 20 - 40 | Fixed | 2030 | £45m | 30 | Copenhagen Infrastructure Partners | Signed lease with Crown Estate - Jan 2023, DCO granted 1 December 2025 | [109][112][113][94][95] | ||
| Mona | England | Off the Northern Welsh Coast, North East of Anglesey | 1500 | Fixed | £231m | 35 | 30 | JERA Nex bp | Signed lease with Crown Estate - Jan 2023. EnBW sold stake - Jan 2026 | [109][114][94][95][115] | |||
| Morven | Scotland | "Map Reference 1" | 2907 | Fixed | £85.9m | 65-75 | 60 | BP Alternative Energy Investments | Nov 2022 - two floating LiDARs to be deployed | [116][114][117] | |||
| Ossian | Scotland | "Map Reference 2" | 2610 | Up to 270 | Floating | £85.9m | SSE Renewables | Potential to grow to 3.6 GW. Nov 2022 - completed a geophysical and benthic survey | [116][118][119] | ||||
| Bellrock | Scotland | "Map Reference 3" | 1200 | Floating | £28m | Falck Renewables | Feb 2023 - FLS200 floating LiDAR buoy to be deployed. | [116][120][121] | |||||
| CampionWind | Scotland | "Map Reference 4" Off the East coast of Scotland | 2000 | Floating | £86m | Averaging 77 | 100 | ScottishPower, Shell | [116][122] | ||||
| Muir Mhòr | Scotland | "Map Reference 5" | 798 | Floating | £20m | 67 | Vattenfall | Jun '23 Geophysical and environmental surveys started | [116][123][124] | ||||
| Bowdun | Scotland | "Map Reference 6" - E3 leasing zone off Bowdun Head | 1008 | 50 to 60 | 18-25 MW each | Fixed | Construction to commence 2029 and commissioned in 2033 | £18.7m | 44 | Thistle Wind Partners | Mar '23 renamed, formerly Cluaran Deas Ear | [116][125][126] | |
| Ayre | Scotland | "Map Reference 7" NE2 leasing zone, off East Mainland of Orkney | 1008 | Floating | Construction to commence 2029 and commissioned in 2033 | £20m | 33 | Thistle Wind Partners | Mar '23 renamed, formerly Cluaran Ear-Thuath | [116][117][126] | |||
| Broadshore | Scotland | "Map Reference 8" | 900 | Floating | £25.6m | Falck Renewables | Feb 2023 - FLS200 floating LiDAR buoy to be deployed. | [116][127][121] | |||||
| Caledonia | Scotland | "Map Reference 9" - adjacent to Moray East and Moray West OWFs. | 2000 | Fixed | 2030 | £42.9m | Ocean Winds (joint venture between ENGIE & EDP Renewables) | May 2023 - LiDAR devices to be deployed. Geophysical surveys partially complete. | [116][128] | ||||
| Stromar | Scotland | "Map Reference 10" | 1000 | Floating | £13.4m | Falck Renewables | [116][129] | ||||||
| MarramWind | Scotland | "Map Reference 11" - North East coast of Scotland | 3000 | Floating | £68.4m | Averaging 100 | 75 | ScottishPower, Shell | [116][130] | ||||
| Buchan | Scotland | "Map Reference 12" | 960 | Floating | £33m | BayWa | A floating LiDAR Buoy has been deployed - Nov 2022 | [116][131][132][133] | |||||
| West of Orkney | Scotland | "Map Reference 13" | 2000 | Fixed | £65.7m | Offshore Wind Power | Oct 2022 - completed offshore and nearshore surveys | [116][134] | |||||
| Havbredey | Scotland | Northwest of Lewis | 1500 | Floating | 2036 | £3.9m | 35 | Northland Power | [116][135][136] | ||||
| "N3 Project" | Scotland | "Map Reference 15" | 495 | 15 | Mixed | 2030 | £10.3m | 106-125 | Magnora | [116][137] | |||
| Spiorad na Mara | Scotland | "Map Reference 16" - West coast of Lewis | 840 | Fixed | 2031 | £16.1m | 5 | Northland Power | This project will be prioritized over the Havbredey project. | [116][135][136] | |||
| MachairWind | Scotland | "Map Reference 17" | 2000 | Fixed | £75.4m | Scottish Power | [116][138] | ||||||
| Sheringham Shoal and Dudgeon Extensions | England | Adjacent to existing Sheringham, Shoal and Dudgeon Wind Farms | 719 | up to 56 | Fixed | Equinor | April 2024 - Project has Secured Development Consent | [139][140] | |||||
| Llŷr 1 | Wales | Off the coast of Pembrokeshire | 100 | Floating | 2027 | 60-70 | 40 | Floventis Energy | Benthic and geophysical surveys completed | [141] | |||
| Llŷr 2 | Wales | Off the coast of Pembrokeshire | 100 | Floating | 2027 | 60-70 | 40 | Floventis Energy | Benthic and geophysical surveys completed | [141] | |||
| Whitecross | England | Off the Devon/Cornwall coast | 100 | up to 8 | Floating | 2027 | 50 | Offshore Wind Ltd | [142][143] |
Decommissioned offshore wind farms
In October 2022, there was one offshore wind farm that had been decommissioned, consisting of two turbines with a combined capacity of 4 MW.
| Name | Country | Location | Cap. (MW) |
No. | Model | Project decommissioning |
Strike price | Build cost |
Cap. fac. |
Depth range (m) |
Km to shore |
Owner | Refs. |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Blyth Offshore | England | 55°08′09″N 01°29′25″W / 55.13583°N 1.49028°W | 4 | 2 | Vestas V66-2 MW | 2019 March | £4m | 6–11 | 1.6 | E.ON | [144] |
Cancelled Wind Farms
Several wind farms which have been significantly developed have subsequently been cancelled. These may be redeveloped in future. If there is an entry in the Strike Price column, this indicates that the project was previously awarded a Contract for Difference (CfD) and the project has been subsequently cancelled. Total capacity cancelled - 3.94 GW.
| Name | Country | Location | Cap. (MW) |
No. | Model | Project commis-sioning |
Strike price | Depth range (m) |
Km to shore |
Owner | Notes | Refs. |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Forthwind | Scotland | 12 | Originally 2023/24 | 1.5 | Forthwind Limited | Awarded CfD in AR3, but cancelled in April 2024. | [59][145] | |||||
| Hornsea Four | England | TA042348 | 2400 | Cancelled 2025 | 58.87 | Ørsted | [75][146] | |||||
| Morgan | England | Off the coast of Barrow-In-Furness, West of Morecambe Bay | 1500 | Cancelled 2026 | 35 | 30 | EnBW, BP | Signed lease with Crown Estate - Jan 2023 | [109][114][94][95][147] | |||
| TwinHub Floating Offshore Wind Project | England | Wave Hub, Cornwall | 32 | Cancelled March 2026 | 87.30 | Hexicon | Awarded CfD in AR4, but terminated in March 2026 after developer wrote off costs in January | [90] [148][149] |