The Bhanupli–Leh line, including 63.1 km (39.2 mi) long Bhanupli-Barmana (Bilaspur) link[2] and the 489 km (304 mi) long Bilaspur-Manali-Leh link,[3][4] is an under-construction 552.1 km (343.1 mi) long 1,676 mm (5 ft 6 in) wide broad-gauge all-weather electrified railway track connecting Bhanupli in Punjab,[5] to Leh in Ladakh.[2][6][7] Passing through seismic zone IV and V at an elevation of 600 m (2,000 ft) to 5,360 m (17,590 ft) above sea level, this geostrategically important track will reduce travel time from New Delhi to Leh to 10 hours,[3][4] which takes 25–40 hours by road.[8]

Status
  • Final Location Survey & DPR completed
  • Land acquisition in progress
  • Bhanupli-Bilaspur section under construction
Termini
Quick facts Overview, Status ...
Bhanupli–Leh line
Overview
Status
  • Final Location Survey & DPR completed
  • Land acquisition in progress
  • Bhanupli-Bilaspur section under construction
LocalePunjab, Himachal Pradesh and Ladakh, India
Termini
Websitehttp://www.indianrailways.gov.in
Service
ServicesBhanupli–BilaspurSundernagarKulluManaliKeylongLeh
Technical
Line length489 km (304 mi)
Track length489 km (304 mi)
Track gauge1,676 mm (5 ft 6 in)
ElectrificationIn Progress
Highest elevation5,359 m (17,582 ft) at Taglang La
Route map

Ganderbal
Kargil
Leh
Choglamshahr
Sindhughat
Shey
Thicksey
Rabirpora
Chang-Karu
Upshi-Junction
Rumtse
Taglang La
Debring
Pang
Lachalungla
Sarchu
Baralachala
Dharcha
Jispa
Keylong
Tandi
Sissu
Rohtang Hault
Manali
Naggar
Kullu
Bhuntar
Aut
Pandoh
Joginder Nagar (planned)
Mandi
Bilaspur
Jagatkhana
Dharot
Thural
Bhanupli
Close

Significance

The Bhanupali–Leh line (also referred to as the Bilaspur–Manali–Leh line) is a high-altitude, strategic railway project currently under construction in India. Upon completion, it will connect the plains of Punjab and Himachal Pradesh to the union territory of Ladakh. The line is widely regarded as one of the most challenging engineering feats in the history of global rail transport due to its extreme topography and high-altitude logistics.[9] After the Jammu–Baramulla line, the Bhanupli–Leh line will be the most challenging railway project in Indian Railways due to high mountains, a large number of tunnels, high bridges, and severe cold weather.[3]

Geostrategic

Indian Howitzer K9 self-propelled artillery at Ladakh during 2020–2021 China–India skirmishes.

Socioeconomic

9 Stupas at Thikse Monastery.

Beyond its military utility, the line is expected to transform the economy of the Lahaul and Spiti district and Ladakh:

  • Tourism expansion: By providing a safer and more reliable alternative to the treacherous mountain roads, the railway is expected to significantly increase tourist arrivals to Manali, Keylong, and Leh.
  • Agricultural access: Local farmers in the Lahaul and Indus valleys will gain direct access to mainland Indian markets for the export of high-value crops like apples, apricots, and buckwheat.[12]
  • Price stability: All-weather connectivity will help stabilize the prices of essential commodities in Ladakh, which currently skyrocket during the winter months due to the "landlocked" nature of the region.

Engineering

Taglang La, and many other high-altitude mountain passes enroute this line offer several engineering challenges.

The project is set to break several global engineering records:

  • World's highest railway: The station at Tengla (near Taglang La) is projected to be the highest in the world at an altitude of approximately 5,359 metres (17,582 ft), surpassing the current record held by the Tanggula railway station in Tibet.[13]
  • Subterranean infrastructure: Approximately 50% of the 489 km route will be underground. This includes Keylong railway station, which is designed to be India's first station built entirely inside a tunnel.[14]
  • Tunnels and viaducts: The line includes 27 km of continuous tunneling and numerous high-altitude viaducts to bridge deep Himalayan gorges.
  • Environmental and geological challenges: The project faces scrutiny regarding its environmental footprint in the fragile Himalayas. The route passes through high-seismic zones and areas prone to flash floods and landslides. Construction requires advanced seismic bracing and specialized drainage systems to mitigate the risk of tunnel collapses.[15]

Details

Route

Gobind Sagar Reservoir in Bilaspur formed by the Bhakra Dam on the Sutlej river.
Sundar Nagar Lake at Sundar Nagar as part of the Beas-Sutlej River Link project.
Khirganga National Park with the thrillingly bautiful hairpin turn road in the Parvati River Valley near Kullu in Himachal Pradesh.
View of the Bhaga Valley and hairpin turn road from the Shashur Monastery in Keylong.
Lungalacha La with dramatic yellowish-golden hued and needle-like jagged pillar rock formations.
Upshi road junction along the Indus river.
Thikse Monastery, also called the "Mini Potala" due to its resemblance with Lhasa's Potala Palace.

The project has 42 new stations, including 5 between Bhaupali to Barmana (Bilaspur) and 37 stations from Bilaspur to Leh and Sarthang.[16][17]

Features

Bilaspur-Manali-Leh rail line, with a total length of 489 km (304 mi), including the 13 km (8.1 mi) Leh-Sasherthang rail link, will cost ₹99,000 crore (~US$12.4 billion). This includes ₹62,000 crore (~US$7.75 billion) for 62 tunnels totaling 270 km (170 mi) in length, 114 major bridges, and 90 minor bridges.[3] [17] Bilaspur-Leh section will have 124 major bridges, 396 minor bridges, and 52% track passing through 74 tunnels (with 27 km long Keylong tunnel being longer). Since this track passes through sub-zero cold weather, the coaches will be pressurised to maintain oxygen level and will be heated, but there will be no sleeper class seats. Construction includes structure to mitigate landslides, cloudbursts, and avalanches in the 48% section running outside the tunnels.[17]

Construction

Buddha statue at Sindhu Ghat where the annual Sindhu Darshan Festival is held in June.

Funding

According to the 2022 Detailed Project Report (DPR), project cost will exceed ₹1 lakh crore. Total 2200 hectares land, including 572 hectares (26%), will be acquired at the cost of ₹11,500 crore. Bridges and tunnels will cost ₹62,000 crore including the large escape tunnels for ensuring passenger safety during emergencies.[19] The project requires the acquisition of 1,100 ha (11 km2) of land, of which 26% is forest land, at a cost of ₹11,500 crore (~US$8.5 billion). 150 km (93 mi) of approach roads will be constructed.[2]

Sections

In March 2012, Ministry of Railways sent the project to the Planning Commission for appraisal.[20][21] In December 2016, the 498 km (309 mi) the budget of ₹345 crore was approved for carrying out the Final Location Survey (FLS) for Bhanupli–Leh rail,[22] which finally begun in June 2017,[23] and was completed by October 2020.[24] In March 2025, the FSL and subsequent DPR for Bilaspur-Manali-Leh line were complete.[25]

  • Section-0: Bhanupli to Barmana (Bilaspur), 63.1 km (39.2 mi) long link begins at the existing Bhanupli station,
  • Section-1: Barmana to Mandi
  • Section-2: Mandi to Manali
  • Section-3: Manali to Upshi
  • Section-4: Upshi to Leh
  • Section-5: Leh to Sasherthang 13 km (8.1 mi) link, included in the project at the request of the Indian military,[2] and Ministry of Defence had granted final approval in December 2024.[19]

Section-0: Bhanupli to Barmana (Bilaspur), 63.1 km

The construction on this initial section is focused on connecting the existing Bhanupli railway station in the Rupnagar district of Punjab to Barmana in the Bilaspur district of Himachal Pradesh. It has a total track length of 63.1 km (39.2 mi), 20 tunnels totaling 25 km (16 mi), 24 bridges totaling 6 km (3.7 mi), and 2 viaducts totaling 2 km (1.2 mi).[2][16][26]

Section-1: Barmana (Bilaspur) to Mandi

In May 2022, this section commenced with land acquisition between Barmana and Mandi.[27]

Originally, a couple of further extensions from Leh also were planned to be constructed at a later time. However, in 2023 these were officially declared to be "shelved due to low traffic projection".[3] They comprised the following.

  • 1. Srinagar-Kargil-Leh line, 480 km (300 mi), a Rs 55,896 crore project.,[3][28][29] survey done, DPR on hold as of 2025.
    • 1.1. Leh-Kargil rail line, 210 km (130 mi).[28]
    • 1.2. Kargil-Srinagar rail line, 225 km (140 mi).[28]
  • 2. Pathankot-Leh line, 664 km (413 mi), Rs 70,308 crore project,[3] survey done, DPR being prepared in 2025.