Blue Line (Kanpur Metro)

From Wikipedia, the free encyclopedia

StatusUnder Construction
Termini
  • Agriculture University
  • Barra-8
Stations8
Blue Line
Overview
StatusUnder Construction
LocaleKanpur, Uttar Pradesh, India
Termini
  • Agriculture University
  • Barra-8
Stations8
Service
TypeRapid transit
SystemKanpur Metro
Operator(s)Uttar Pradesh Metro Rail Corporation
Rolling stockAlstom - Bombardier Movia
Technical
Line length
  • 8.6 km (5.3 mi)
CharacterElevated & Underground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Operating speed
  • 80 km/h (50 mph) (Top)
  • 34 km/h (21 mph) (average)
Route map

Agriculture University
Rawatpur Rawatpur railway station
Kakadeo
Double Pulia
Vijay Nagar Chauraha
Shastri Chowk
Barra-7
Barra-8

The Blue Line (Line 2) (Hindi: ब्लू लाइन) of the Kanpur Metro is an approved metro route of the mass rapid transit system in Kanpur. It consists of 8 stations from Agriculture University to Barra-8 with a total distance of 8.6 km. Construction of the line began in late 2023 and the corridor is currently under construction.[1]

See also

References

Related Articles

Wikiwand AI