Line 8 (Chengdu Metro)

Metro line in Chengdu, China From Wikipedia, the free encyclopedia

Line 8 of the Chengdu Metro (Chinese: 成都地铁8号线; pinyin: Chéngdū Dìtiě Bā Hào Xiàn) is a line on the metro network in Chengdu, Sichuan, China. The first phase opened on 18 December 2020.[2]

StatusOperational
OwnerChengdu
LocaleChengdu, China
Termini
Quick facts Overview, Status ...
Line 8
Line 8 platform at Dongjiao Memory station
Overview
StatusOperational
OwnerChengdu
LocaleChengdu, China
Termini
Stations32
Service
TypeRapid transit
SystemChengdu Metro
Services1
Operator(s)Chengdu Metro Limited
History
Opened18 December 2020; 5 years ago (2020-12-18)
Technical
Line length36.71 km (22.81 mi)[1]
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed80 km/h (50 mph)
Close

The line runs from northeast to southwest and avoids the city center of Chengdu. It also connects the Wangjiang and Jiang'an campuses of Sichuan University.

History

  • On 11 July 2016, NDRC approved the 3rd phase expansion for the Chengdu Metro, consisting of Line 6 phase 2 and 3, Line 8 Phase 1, Line 9, Line 10 Phase 2, Line 17 Phase 1, and Line 18.[3] The third phase was to be simultaneously built with the already under construction second phase.
  • On 11 April 2020, Chengdu Metro reported that track-laying for Line 8 was completed.[4]
  • On 8 August 2020, Line 8 's whole line power network passed quality assessment.[5]
  • On 18 Dec 2020, Line 8 Phase 1 opened along with: Line 6 Phase 1/2/3, Line 9 Phase 1, Line 17 Phase 1, Line 18 Phase 2, marking the completion of all Phase 2 and 3 projects.[6]
  • On 18 May 2020, Line 8 Phase 2, Line 27 Phase 1, Line 30 Phase 1 started construction. This marks the date all 4th Phase projects started construction.[7]
  • On 27 March 2023, Line 8 Phase 2 finished Longgang~Lianhua section tunnel work. Line 8 Phase 2 entered railroad construction, electrics, and refurbishment stage.[8]
  • On 19 December 2024, Line 8 Phase 2 opened for service.[9]

Opening timeline

More information Segment, Commencement ...
SegmentCommencementLengthStation(s)Name
Shilidian — Lianhua 18 December 2020 29.1 km (18.08 mi)[10] 25 Phase 1
Guilong Road — Shilidian 19 December 2024[9] 6 Phase 2
Lianhua — Longgang 1
Close

Stations

More information Station No., Station name ...
Station

No.

Station name Transfer Distance
km
Location
English Chinese
0801 Guilong Road 桂龙路 Chenghua
0802 Guilin 桂林
0803 Tongle 同乐
0804 Longtan Temple 龙潭寺
0805 Longtan Flyover 龙潭立交
0806 Shengdeng Park 圣灯公园
0807 Shilidian 十里店 -- 0.000
0808 Chengdu University of Technology 理工大学  7  0.832 0.832
0809 Dongjiao Memory 东郊记忆 1.041 1.873
0810 Shabanqiao 杉板桥 1.053 2.926
0811 Wannian Road 万年路 Chengdu BRT Chengdu BRT 1.221 4.147
0812 Shuangqiao Road 双桥路  4  Chengdu BRT Chengdu BRT 1.004 5.151
0813 Dongdalu Road 东大路  2  1.564 6.715 Jinjiang
0814 Jingjusi 净居寺  13  1.493 8.208
0815 Dongguang 东光  6  0.762 8.970
0816 Donghu Park 东湖公园 0.954 9.924
0817 Sichuan University Wangjiang Campus 川大望江校区 1.416 11.340 Wuhou
0818 Nijiaqiao 倪家桥  1   18  0.964 12.304
0819 Fangcao Street 芳草街 1.248 13.552
0820 Yongfeng 永丰 0.625 14.177
0821 Jiuxing Avenue 九兴大道  5  1.224 15.401
0822 Gaopeng Avenue 高朋大道  7  Chengdu BRT Chengdu BRT 0.606 16.007
0823 Yinjialin 殷家林 1.288 17.295
0824 Qing'an 庆安 0.841 18.136
0825 Shiyang 石羊 1.513 19.649
0826 Sanyuan 三元  9  0.645 20.294
0827 Shunfeng 顺风 1.605 21.899 Shuangliu
0828 Zhujiang Road 珠江路  30  1.438 23.337
0829 Sichuan University Jiang'an Campus 川大江安校区 1.569 24.906
0830 Wenxing 文星 1.697 26.603
0831 Lianhua 莲花 1.320 27.923
0832 Longgang 龙港  19 
Close

References

Related Articles

Wikiwand AI