Chengdu Metro Line 9 (simplified Chinese: 成都地铁9号线; traditional Chinese: 成都地鐵9號線) is located in Chengdu, Sichuan and forms an extension to the existing Chengdu Metro system. The line officially opened on 18 December 2020.[3]

StatusOperational
Termini
Quick facts Overview, Status ...
Line 9
Line 9 platform at Huaxing station
Overview
StatusOperational
OwnerCity of Chengdu
LocaleChengdu, Sichuan
Termini
Stations13
Service
TypeRapid transit
SystemChengdu Metro
OperatorChengdu Metro Corporation
Depot(s)Yuanhua Depot (元华停车场)
Wuqing Depot (武青车辆段)
Rolling stock8-car Type A (Driverless)
History
Opened18 December 2020; 5 years ago (2020-12-18)
Technical
Line length22.18 km (13.8 mi)[1]
Number of tracks2
CharacterUnderground and elevated
Electrificationoverhead lines, 1,500 V DC
Operating speed140km/h [2]
Close

Line 9 Phase I runs from Financial City East to Huangtianba and is envisioned to be the second loop line in Chengdu (after Line 7) in the future. Line 9's color is bright orange.[4]

It is the first ever fully automated ATO GoA 4 metro line in Chengdu.[5]

Line 9 uses high capacity Type A 8-car trains.[6] The 13 stations were designed by London-based Sepanta in collaboration with Chinese architect Jiang & Associates Design.[7]

Progress

  • On July 11, 2016, the NDRC approved the third phase of expansion for the Chengdu Metro consisting of Line 6 phase 2 and 3, Line 8, Line 9, Line 10 Phase 2, Line 17 Phase 1 and Line 18.[8]
  • 2016-12-29, Sichuan and the Sichuan Development and Reform Commission approved and officially agreed to construct Line 1 Phase 1.[9] The first 4 stations started construction on the same day.[10]
  • 2017-11-10, Line 9's first tunnel machine started work at Yuanhua Depot connection.[11]
  • 2018-3-17, Line 9's first section (Yuanhua Depot connection) finished tunnel work
  • 2018-11-29, Line 9 started track-laying.
  • 2019-01-22, first train is finished at CRRC Changchun Railway Vehicles.[12]
  • On July 18, 2019, the Wuqing Power Centre project is completed.[13]
  • 2019-07-30, Line 9 finished all tunnel work.
  • 2020-01-14, as the last section of track is installed between Sanyuan and Jincheng Avenue Stations, completing track installation of Line 9 Phase I.[14]
  • 2020-06-10, Chengdu Metro started 3-month trial operation for Line 9 and Line 17.[15]

Stations

More information Station №, Station name ...
Station

Station name Transfer Distance
km
Location
English Chinese
0901 Financial City East 金融城东  6  -- 0.000 Jinjiang
0902 Xindao 心岛 1.257 1.257 Wuhou
0903 Incubation Park 孵化园  1   18  0.645 1.902
0904 Jincheng Avenue 锦城大道  5  1.557 3.459
0905 Sanyuan 三元  8  2.532 5.991
0906 Taiping Temple 太平寺 1.794 7.785
0907 Huaxing 华兴  10  1.442 9.227
0908 Cuqiao 簇桥 1.616 10.843
0909 Wuqing South Road 武青南路  3  1.702 12.545
0910 Jitouqiao 机投桥  17  2.766 15.311
0911 Peifeng 培风  13  1.671 16.982
0912 Chengdu West Railway Station 成都西站  4 Chengdu West railway station CMW

Chengdu Tram  T2 

2.640 19.622 Qingyang
0913 Huangtianba 黄田坝 1.826 21.448