Wikiwand AI

Cinere–Jagorawi Toll Road

Toll road in Indonesia From Wikipedia, the free encyclopedia

Cinere–Jagorawi Toll Road or Cijago Toll Road is a 14.64-kilometre (9.10 mi) toll road which extends from Cimanggis to Cinere in West Java, Indonesia.[1][2] This toll road is the part of the Jakarta Outer Ring Road 2. The toll road is connected to Jagorawi Toll Road, Depok-Antasari Toll Road and Cinere-Serpong Toll Road. Section 1 from Cisalak to Jagorawi was inaugurated on Friday, 27 January 2012,[3] which is 3.7 kilometres (2.3 mi) in length. Section 2 from Cisalak to Beji (5.5 kilometers (3.42 mi)) was opened for public on Saturday, 28 September 2019.[4] With the completion of the remaining 3.31 kilometers (2.05 mi) and 2.19 kilometers (1.36 mi) of section that spans from Beji to Cinere, the toll road was completely opened for public on Friday, 22 December 2023.[5]

Length14.64 km (9.10 mi)
Existed2012–present
HistoryOpened since 2012, the toll road was opened in 3 phases, from 2012 to 2019 and was completely operational in 2023
WestendLimo Interchange
Quick facts Cinere-Jagorawi Toll Road Cijago, Route information ...
Cinere-Jagorawi Toll Road
Cijago
Route information
Maintained by PT Trans lingkar Kita Jaya (TLKJ)
Length14.64 km (9.10 mi)
Existed2012–present
HistoryOpened since 2012, the toll road was opened in 3 phases, from 2012 to 2019 and was completely operational in 2023
Major junctions
West endLimo Interchange
Major intersections
East endCimanggis Interchange
Location
CountryIndonesia
Highway system
Close

Metro, long or medium distances from and to Depok can use this toll road, without passing Lenteng Agung and Pasar Minggu.[6]

Sections

The toll road is divided into three sections. All section are fully operational.

  • Section 1: extends from Jagorawi to Raya Bogor (operational)
  • Section 2: from Raya Bogor to Kukusan (operational),[7]
  • Section 3: from Kukusan to Cinere (operational).

Toll gate

More information Province, Location ...
ProvinceLocationkmmiExitNameDestinationsNotes
West JavaLimo, Depok Serpong–Cinere Toll Road
Limo Interchange
Beji, Depok15.29.415Kukusan Toll Gate
17.210.717Margonda Toll Gate
Sukmajaya, Depok19.912.420Cisalak Toll Gate
Cimanggis, Depok23.614.723Cimanggis Interchange
Tapos, Depok24.715.3 Cimanggis–Cibitung Toll Road
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  •       Route transition
Close

See also

References

Related Articles

Timelines

Top Qs

Fact Checks