Daojiao railway station

From Wikipedia, the free encyclopedia

Chinese道滘站
Hanyu PinyinDàojiào Zhàn
Hanyu PinyinDàojiào Zhàn
Yale RomanizationDouhgaau Jaahm
Daojiao

道滘
PRDIR
Exterior
Chinese name
Chinese道滘站
Transcriptions
Standard Mandarin
Hanyu PinyinDàojiào Zhàn
Yue: Cantonese
Yale RomanizationDouhgaau Jaahm
JyutpingDou6gaau3 Zaam6
General information
LocationIntersection of Shuixiang Boulevard (水乡大道) and Hongnan Road (虹南路), Daojiao, Dongguan, Guangdong
China
Coordinates22°59′36.96″N 113°39′13.99″E / 22.9936000°N 113.6538861°E / 22.9936000; 113.6538861
Owned byPearl River Delta Metropolitan Region intercity railway
Operated byGuangdong Intercity Railway Operation Co., Ltd.
Line     Guangzhou–Huizhou intercity railway
Platforms2 (2 side platforms)
Tracks2
Construction
Structure typeElevated
AccessibleYes
Other information
Station codeRRQ (Pinyin: DJI)
History
Opened28 December 2017 (8 years ago) (2017-12-28)
Services
Preceding station Pearl River Delta Metropolitan Region Intercity Railway Pearl River Delta Metropolitan Region Intercity Railway Following station
Dongguan West
towards Panyu
Guangzhou–Huizhou intercity railway Xiping West
Location

Daojiao railway station (Chinese: 道滘站; pinyin: Dàojiào Zhàn; Cantonese Yale: Douhgaau Jaahm) is a railway station in Daojiao, Dongguan, Guangdong, China. It opened on 28 December 2017, and was the western terminus of the Guangzhou–Huizhou intercity railway before Dongguan West opened on 15 December 2019.[1]

The station has 4 points of entry/exit, currently only Exits A and D are open. Both exits are accessible via elevators.

History

In the early stage of Dongguan-Huizhou intercity planning, the station was planned to be located about 300m southeast of the current site. In 2010, after the Ministry of Railways intervened in the construction of the Pearl River Delta Metropolitan Region intercity railway, the line scheme was redesigned. In the end, due to the change of the interchange plan between the line and the Guangzhou–Shenzhen intercity railway and the need for the Dongguan urban section to go underground, the station position of this station was fine-tuned to the current location.[2]:87–89

The station was operated by China Railway Guangzhou Group when it was opened, and was transferred to Guangdong Intercity on 23 January 2024.[3]

References

Related Articles

Wikiwand AI