Wikiwand AI

El Insurgente

Commuter rail line in Mexico From Wikipedia, the free encyclopedia

El Insurgente (lit. 'The Insurgent') is a 57.7-kilometre (35.9 mi) commuter rail line connecting Mexico City and Toluca in the State of Mexico. As part of the Tren Interurbano system, it is formally known as the Tren Interurbano Mexico City–Toluca. The project was announced by President Enrique Peña Nieto on 1 December 2012,[1] and construction began in 2014.

Termini
Stations7
Quick facts Overview, Locale ...
El Insurgente
El Insurgente train leaving Zinacantepec station
Overview
LocaleGreater Mexico City
Termini
Stations7
Service
TypeCommuter rail
SystemTren Interurbano
Rolling stockCAF Civity-based EMUs
History
Opened15 September 2023 (2023-09-15)
Last extension2 February 2026 (2026-02-02)
Technical
Line length57.7 km (35.9 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
ElectrificationOverhead line, 25 kV 60 Hz AC
Operating speed160 km/h (99 mph)
Route map
Observatorio
Mexico City Metro Line 1
Vasco de Quiroga
Santa Fe
Lerma
Metepec
Toluca International Airport (at distance)
Toluca Centro
Zinacantepec
Workshops
Close

History

Background

As a part of then-President Enrique Peña Nieto's plan to offer public transport from Toluca to Mexico City, a cost–benefit analysis report was drafted and published in November 2013.[2]: 1  The report proposed several routes. The three routes were concentrated to the metro terminals of Cuatro Caminos, Tacubaya, and Observatorio.[2]: 45  Ultimately, the third route along Avenida Las Torres to Observatorio was chosen in order to avert future sprawl, avoid deforestation in the Sierra de las Cruces, and prevent pollution of aquifers that supply water to residents.[2]: 11 and 12  A section of the chosen route was altered by 4.3 km (2.7 mi) in October 2015 to no longer run above Avenida Vasco de Quiroga in Cuajimalpa.[3]

The railway line is electrified and elevated with a tunnel portion between the State of Mexico and Mexico City.[2]: 18 [4] There are seven stations. Four stations located in the State of Mexico and the remaining three are located in Mexico City.[5] The line is designed to complement the Mexico City Metro by terminating at Observatorio station of Line 1 and provide heavy railway service to the Santa Fe business district.[2]: 13 [5][6] A shuttle provides connection to Toluca International Airport at the Metepec station (formerly named Tecnológico). The commuter line runs parallel to Avenida Las Torres and Mexican Federal Highway 15/Mexican Federal Highway 15D.[5] The total cost of the project was estimated at $38.6 billion MXN in 2014.[4]

Construction

El Insurgente train in operation

The Secretariat of Communications and Transportation (SCT) divided the project into three sections for contractors to bid on:

Section 1 covers the western terminal in Zinacantepec to the eastern tunnel entrance at Sierra de las Cruces. This encompasses 36.1 km (22.4 mi) of the project. The contracts were awarded to La Peninsular Compañía Constructora and Constructora de Proyectos Viales de México.[7]
Section 2 is the 4.6 km (2.9 mi) tunnel portion underneath Sierra de las Cruces. Ingenieros Civiles y Asociados [es] was awarded the contract.[8]
Section 3 involves the 17 km (11 mi) Mexico City portion from the western tunnel entrance at Sierra de las Cruces to the Metro Observatorio Station. The contract was awarded to a consortium.[9]

For its rolling stock, Spanish manufacturing company CAF was awarded a contract in 2014 to construct 30 EMUs for $11.6 billion MXN (€690 million).[10] Each EMU will have five cars, have a capacity of 700 passengers, and operate at a maximum speed of 160 km/h (99 mph).[11] Deliveries for the trainsets began in January 2017.[12]

The train depot is located west of Zinacantepec station and was built at a cost of MXN942 million. The contract was awarded to a consortium in March 2016.[13]

In July 2014, a formal ceremony was carried out by the head of SCT, Gerardo Ruiz Esparza, to mark the start of construction.[14]

There have been several construction accidents during the project. On 4 May 2016, the temporary support structures gave way, causing the concrete decking to collapse near the intersection of Avenida Las Torres and Avenida Colón in Toluca.[15] On 2 June 2016, bad weather caused concrete-reinforced rebar to fold onto traffic near the intersection of Avenida Las Torres and Avenida Díaz Mirón in Toluca.[16] On 7 July 2016, a work site caved in killing one worker and injuring two.[17] On 16 July 2016, a construction worker was killed when a truck lost control and struck the worker on a construction site in Metepec.[18]

In July 2019, the SCT determined the project's completion would be delayed to the end of 2022.[19] Javier Jiménez Espriú, head of the SCT, announced the project was 87% complete, however, there have been cost overruns from $42.72 billion MXN in 2015 to $73.72 billion MXN in 2019.[20] President Manuel Lopez Obrador inaugurated the opening of Section 1 of the rail line in September 2023, but since the train runs only through stations in Toluca and does not run through to Mexico City, ridership was exceptionally low as of December 2023.[21]

On 1 September 2023, the line branded as El Insurgente, after Miguel Hidalgo.[22] On 15 September 2023, the first section from Zinacantepec to Lerma opened, with four trains initially running on the section.[23] On 31 August 2024, the second section from Lerma to Santa Fe inaugurated.[24][25] On 2 February 2026, the third section from Santa Fe to Observatorio was inaugurated, completing the line.[26][27]

Stations

Key[a]
Handicapped/disabled accessFully accessible stationCablebús Line {{{3}}}Cablebús connectionRed de Transporte de PasajerosRTP connection
Handicapped/disabled accessPartially accessible stationMexibúsMexibús connectionTren InterurbanoTren Interurbano connection
Transfer hubCETRAM transfer stationMexicableMexicable connectionTren SuburbanoTren Suburbano connection
Transfer hubETRAM transfer stationMexico City MetroMexico City Metro connectionTrolleybusTrolleybus connection
EcobiciEcobici bikeshareMexico City minubusPesero connectionXochimilco Light RailXochimilco Light Rail connection
More information No., Icon ...
No. Icon Station[b] Level Connection Location Date opened
01
Zinacantepec Elevated
Toluca State of Mexico 15 September 2023
02
Toluca Centro Bus interchange Various intercity routes
03
Metepec
Metepec
04
Lerma Bus interchange Various intercity routes Lerma
05
Santa Fe
  • Red de Transporte de Pasajeros 34A, 34B, 76A
  • Mexico City minubus 5
Cuajimalpa de Morelos Mexico City 31 August 2024[35][36]
06
Vasco de Quiroga Cablebús Line {{{3}}} Cablebús (at distance) Álvaro Obregón 2 February 2026[26][27]
07
Observatorio Transfer hub
Close

Notes

  1. The following list was adapted from different websites and official maps.
    • Metro (Mexico City Metro) connections obtained from the official Mexico City Metro system map.[28]
    • Accessibility obtained from the Mexico City Metro system map. In some cases, the map omits the accessibility icon as the station(s) are actually partially accessible. However, the respective websites of each station on the official site indicate the respective accessibility methods. Stations with the symbol Handicapped/disabled access are fully accessible; stations with the symbol Handicapped/disabled access are partially accessible.[28]
    • Cablebús (Cablebús Line {{{3}}}) obtained from their official website.[29]
    • Centro de transferencia modal (CETRAM; Transfer hub) obtained from the official website of the Órgano Regulador de Transporte.[30]
    • Ecobici (Ecobici) obtained from their official website.[31]
    • Metrobús (Mexico City Metrobús) obtained from the Mexico City Metrobús system map.[32]
    • Mexibús (Mexibús) obtained from the official Mexico City Metro system map.[28]
    • Mexicable (Mexicable) obtained from the official Mexico City Metro system map.[28]
    • Public buses network (peseros) (Mexico City minubus) obtained from the official website of the Órgano Regulador de Transporte.[33]
    • Red de Transporte de Pasajeros (Red de Transporte de Pasajeros) obtained from their official website.[34]
    • Trolleybuses (Trolleybus) obtained from their official website.[29]
  2. Proposed names. All the stations will be fully accessible to people with disabilities.

References

Related Articles

Timelines

Top Qs

Fact Checks