Giral Lignite Power Plant (GLPL) or Giral Lignite Thermal Power Station (GLTPP) is a wholly owned subsidiary of Rajasthan Rajya Vidyut Utpadan Nigam (RRVUNL).[1] RRVUNL is a state government (Level 2 government in India) owned corporation working in the field of power generation.is located in Thoombali Village.[2][3]

CountryIndia
Coordinates26.0425088°N 71.2506536°E / 26.0425088; 71.2506536
StatusOperational
Quick facts Country, Location ...
Giral Lignite Power Plant
Giral Lignite Thermal Power Plant
Giral Lignite Power Limited
CountryIndia
LocationThoombali, Barmer, Rajasthan
Coordinates26.0425088°N 71.2506536°E / 26.0425088; 71.2506536
StatusOperational
Commission date2003
OperatorRRVUNL
Thermal power station
Primary fuelLignite coal
Tertiary fuelHeavy furnace oil (HFO), light diesel oil (LDO)
Power generation
Units operational0
Nameplate capacity250.00 MW

Source: http://rvunl.com/
Close

Power plant

The thermal power station has an installed capacity of 250 MW. Two identical units of 125 MW each were built and commissioned by Senbo Engineering Limited (SEL) on EPC basis with an estimated cost of Rs. 1690 crores. This is a pit head plant.

The fuel is lignite coal, which is procured from the mines just behind the plant. The fuel is supplied by Rajasthan State Mines & Minerals Limited (RSMML). An additive to the fuel is limestone, which is added in pulverised form to the lignite, for the purpose of neutralising the sulphur oxides (SOx). Sulphur oxides are formed as a byproduct of combustion of lignite containing sulphur as its constituent. The limestone is also supplied by RSMML. The lignite cost is nearly Rs. 400 per MT. This is the first plant in the country which uses lime with lignite to control the SOX level.

The plant was developed in two stages.[4]

Installed capacity

More information Stage, Unit number ...
StageUnit numberInstalled capacity (MW)Date of commissioningStatusCOD
Stage I1125February 2007Running18 December 2011
Stage II2125December 2008Running12 March 2011
Close