Design period1900 - 1914 (early 20th century)
Built1906 - 1907
Ideraway Creek Railway Bridge
Ideraway Creek Railway Bridge
LocationMungar - Monto Line, Ideraway, North Burnett Region, Queensland, Australia
Coordinates25°34′58″S 151°36′58″E / 25.5828°S 151.616°E / -25.5828; 151.616
Design period1900 - 1914 (early 20th century)
Built1906 - 1907
ArchitectWilliam Pagan
Official nameIderaway Creek Railway Bridge (Ideraway)
Typestate heritage (built)
Designated21 October 1992
Reference no.600519
Significant period1899, 1900s (fabric)
Significant componentspier/s (bridge)
Buildersday labour
Ideraway Creek Railway Bridge is located in Queensland
Ideraway Creek Railway Bridge
Location of Ideraway Creek Railway Bridge in Queensland
Ideraway Creek Railway Bridge is located in Australia
Ideraway Creek Railway Bridge
Ideraway Creek Railway Bridge (Australia)

Ideraway Creek Railway Bridge is a heritage-listed railway bridge at Mungar - Monto Line, Ideraway, North Burnett Region, Queensland, Australia. It was designed by William Pagan and built from 1906 to 1907 using day labour. It was added to the Queensland Heritage Register on 21 October 1992.[1]

Construction of the section of railway from Wetheron to Gayndah began in March 1906 using day labour. Completion of the line was delayed building two bridges of special designs over gorges between Ideraway and Gayndah. The Ideraway Creek Railway Bridge was designed and drawings signed by Chief Engineer, William Pagan, on 10 December 1906.[2] The extension was opened for traffic on 16 December 1907.[1] The other bridge is the Steep Rocky Creek Railway Bridge.

Description

The Ideraway Creek bridge is one of the most unusual bridges in Australia. It demonstrates the economic re-use of part of the erection truss used to build the Burdekin River Rail Bridge at Macrossan between Townsville and Charters Towers opened in 1899. The complete truss was 250 feet (76 m) long whereas the Ideraway Creek bridge uses only 150 feet (46 m) of the span. The pinned construction and multiple members of the truss were originally designed for rapid assembly and disassembly.[1]

The bridge work consists of:[1]

  • Wetheron embankment
  • 1-by-3-by-18-foot (0.30 m × 0.91 m × 5.49 m) timber longitudinals, timber trestle, common timber trestle
  • 1-by-3-by-20-foot (0.30 m × 0.91 m × 6.10 m) timber longitudinals, common timber trestle, common concrete pier
  • 1-by-4-by-150-foot (0.30 m × 1.22 m × 45.72 m) deck-type pin-jointed fishbelly truss (ex Burdekin River bridge, Macrossan) with transom tops, six sets of two steel longitudinals, common concrete piers
  • 1-by-3-by-20-foot (0.30 m × 0.91 m × 6.10 m) timber longitudinals, common concrete pier, common timber trestle
  • 1-by-3-by-18-foot (0.30 m × 0.91 m × 5.49 m) timber longitudinals, common timber trestle, timber trestle
  • Gayndah embankment

Heritage listing