Transit line in Chennai, India From Wikipedia, the free encyclopedia

The Yellow Line or Line 4 is one of the under construction lines of Chennai Metro, stretching for 26.1 km (16.2 mi) between Lighthouse and Poonamallee Bypass. The line will consist of 27 stations, out of which nine will be underground and 18 will be at grade or elevated. The colour code of the corridor was changed from Orange to Yellow in 2025.

Native nameMañjaḷ vazhiththadam
StatusUnder Construction
LocaleChennai, Tamil Nadu, India
Termini
Quick facts Overview, Native name ...
Yellow Line (Line 4)
A train on Yellow Line at Porur Bypass station
Overview
Native nameMañjaḷ vazhiththadam
StatusUnder Construction
LocaleChennai, Tamil Nadu, India
Termini
Connecting linesOperational (3):
Blue Line Green Line  Chennai MRTS 
Upcoming (2):
Purple Line Red Line
Stations27
Websitechennaimetrorail.org
Service
TypeRapid transit
SystemChennai Metro
OperatorDelhi Metro Rail Corporation[1]
DepotPoonamallee
Rolling stockAlstom
History
Planned openingNovember 2026; 36 days' time (November 2026)
Technical
Line length26.1 km (16.2 mi)
Number of tracks2
Character10.1 km (6.3 mi) Underground
16 km (9.9 mi) Elevated
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification25 kV 50 Hz AC overhead catenary
SignallingCBTC Signalling System
Route map

           Planned
High Court
State Secretariat
Island Grounds
Ezhilagam
Lighthouse
Kutchery Road
Thirumayilai Purple Line
Alwarpet
Bharathidasan Road
Boat Club
Nandanam on Blue Line
Nandanam
Panagal Park
Kodambakkam
Kodambakkam Powerhouse
Vadapalani on Green Line
Vadapalani
Saligramam
Virugambakkam South
Alwarthirunagar Red Line
Valasaravakkam Red Line
Karambakkam Red Line
Alapakkam Red Line
Porur Junction
Porur Bypass
Thelliyaragaram
Iyyapanthangal
Kattupakkam
Kumananchavadi
Karayanchavadi
Poonamallee Government Hospital
Bus interchange Poonamallee Bus Stand
Poonamallee Depot
Poonamallee Bypass
           Planned
Nazarathpet
Chembarambakkam
Kuthambakkam Bus TerminusBus interchange
Samathuvapuram
Chettipedu
Thandalam
Irungattukottai SIPCOT
Pennalur
Sriperumbudur
Pattunool Chatram
Irungulam Industrial Estate
Mambakkam
Tirumangalam
Sunguvarchatiram (RRTS Mainline rail interchange)
Airport interchange Parandur RRTS Mainline rail interchange
Close

Planning and construction

Phase II

The construction of the first phase of Chennai Metro started in June 2009.[2] Commercial operations started on the green line in June 2015.[3][4][5] On 10 February 2019, the extension of blue line was opened, completing the first phase of the metro.[6]

In July 2016, Government of Tamil Nadu announced that the second phase would have three lines totaling 104 km (65 mi) in length with 104 stations.[7][8] Two corridors would extend from Madhavaram Milk Colony connecting with Siruseri and Sholinganallur respectively with the third corridor connecting Koyambedu with Lighthouse. In July 2017, the state government announced an extension in Phase II, involving an extension of line four from Lighthouse up to Poonamallee with an intersection with the Madhavaram–Sholinganallur line at Alwarthirunagar. The line will extend to 26.1 km (16.2 mi) with 16 km (9.9 mi) elevated and 10.1 km (6.3 mi) underground. It will consist of 30 stations including 12 undergrounds stations.[9][10] The stations for the second phase were designed to be smaller than the existing stations operational in the first phase.[11]

On 20 November 2020, foundation stone for the second phase was laid and construction commenced.[12] In November 2022, Alstom was awarded the contract to supply metro coaches for the phase II expansion.[13] In May 2023, CMRL announced a revised plan for the second phase. As per the plan, the line will extend for 26.1 km (16.2 mi) with 27 stations.[14][15]

The second phase is estimated to cost ₹632.46 billion (US$6.6 billion) of which initially ₹47.1 billion (US$490 million) was loaned by Japan International Cooperation Agency.[9][16][17] On 14 February 2021, the Prime Minister of India announced that the government has set aside ₹630 billion (US$6.5 billion) for the construction of phase II and further extension.[18]

More information Line Name, Terminals ...
Chennai Metro - Phase II[19]
Line Name Terminals Length (km) Stations Status
Yellow Line Poonamallee Bypass Vadapalani 14.6 11 Opens July 2026[20]
6 Under construction
Vadapalani Lighthouse 11.5 10
Close

In January 2025, Chennai Metro announced that the operations on Poonamallee Bypass to Vadapalani stretch will start in February 2026, with no intermediate stoppages at stations from Alapakkam to Saligramam.[21] The opening has since been postponed due to Tamil Nadu Assembly election and is now expected in the second or third week of July 2026, during Prime Minister Narendra Modi's visit.[20]

Phase II extension

In 2022, the state government proposed an extension plan for the fourth line from Poonamalee to Parandur, covering an approximate 52.9 km (32.9 mi).[22] Detailed Project Report (DPR) of the line was prepared and submitted to Government of Tamil Nadu which approved the line in June 2025. This extension would be implemented in 2 phases, from Poonamallee Bypass to Sunguvarchatram in first phase and then to Parandur in second phase. The DPR is currently forwarded to Government of India for final approval.[23] Another extension of the corridor eastward from Lighthouse to High Court is also being planned.[24]

More information Line, Terminals ...
Chennai Metro - Phase II Extension
Line Terminals Length Stations Status
Yellow Line Poonamallee Sunguvarchatram 27.9 km (17.3 mi) 14 DPR approved by state
Lighthouse High Court 7 km (4.3 mi) 4 (TBD) DPR to be submitted to State
Close

Stations

More information S.No, Station Name ...
Yellow Line
S.No Station Name[19] Expected Opening[25] Connections Station Structure
English Tamil Station Type Platform Level Type
1 Lighthouse கலங்கரை விளக்கம் June 2028 Underground Island
2 Kutchery Road கச்சேரி சாலை June 2028 Underground Island
3 Thirumayilai திருமயிலை June 2028 upThirumayilai
(Chennai MRTS)
Purple Line (Under Construction)
Underground Island
4 Alwarpet ஆழ்வார்பேட்டை June 2028 Underground Island
5 Bharathidasan Road பாரதிதாசன் சாலை June 2028 Underground Island
6 Boat Club படகு குழாம் June 2028 Underground Island
7 Nandanam நந்தனம் June 2028 Blue Line Underground Island
8 Panagal Park பனகல் பூங்கா June 2028 Underground Island
9 Kodambakkam கோடம்பாக்கம் June 2028 up Kodambakkam

(South Line)

Underground Island
10 Kodambakkam Powerhouse கோடம்பாக்கம் பவர்ஹவுஸ் November 2026 Elevated Side
11 Vadapalani வடபழனி November 2026 Green Line Elevated Side
12 Saligramam சாலிகிராமம் November 2026 Elevated Island
13 Virugambakkam South விருகம்பாக்கம் தெற்கு November 2026 Elevated Island
14 Alwarthirunagar ஆழ்வார்திருநகர் November 2026 Red Line (Under Construction) Elevated Island
15 Valasaravakkam வளசரவாக்கம் November 2026 Red Line (Under Construction) Elevated Island
16 Karambakkam காரம்பாக்கம் November 2026 Red Line (Under Construction) Elevated Island
17 Alapakkam ஆலப்பாக்கம் November 2026 Red Line (Under Construction) Elevated Island
18 Porur Junction போரூர் சந்திப்பு November 2026 Elevated Side
19 Porur Bypass போரூர் புறவழிச்சாலை November 2026 Elevated Island
20 Thelliyaragaram தெள்ளியாரகரம் November 2026 Sri Ramachandra Medical College Elevated Island
21 Iyyapanthangal அய்யப்பன் தாங்கல் November 2026 Bus interchange Iyyapanthangal Bus Terminus Elevated Island
22 Kattupakkam காட்டுப்பாக்கம் November 2026 Elevated Island
23 Kumananchavadi குமணன்சாவடி November 2026 Elevated Island
24 Karayanchavadi கரையான்சாவடி November 2026 Elevated Island
25 Poonamallee Government Hospital பூவிருந்தவல்லி அரசு மருத்துவமனை November 2026 Elevated Island
26 Poonamallee Bus Stand பூவிருந்தவல்லி பேருந்து நிலையம் November 2026 Bus interchange Poonamallee Bus Terminus Elevated Side
27 Poonamallee Bypass பூவிருந்தவல்லி புறவழிச்சாலை November 2026 Elevated Side
Close

§ under construction