Wikiwand AI

K-5 (ballistic missile)

Indian submarine-launched missile From Wikipedia, the free encyclopedia

K-5 is a submarine-launched ballistic missile under development by the Defence Research and Development Organisation of India.

TypeSLBM
PlaceoforiginIndia
InserviceUnder development
Quick facts Type, Place of origin ...
K-5
TypeSLBM
Place of originIndia
Service history
In serviceUnder development
Production history
DesignerDefence Research and Development Organisation[1]
Specifications
Warhead2,000 kg (4,400 lb) nuclear war-head[2]

EngineSolid-fuelled[1]
Operational
range
5,000–8,000 km (3,100–5,000 mi)[2]
Maximum speedMach 7.5 (9,190 km/h; 5,710 mph; 2.55 km/s)[3]
Launch
platform
Arihant-class submarines, S5-class submarines[1][2]
Close

Description

The K-5 is a submarine-launched ballistic missile.[4] The missile consists of three separate stages and uses solid rocket propellant.[1] It is planned to have a range of around 5,000–6,000 km (3,100–3,700 mi).[2] The missile will be able to carry a payload weighing two tonnes.[2] It is being developed to match the range of the Agni-V missile.[5] It will be equipped on the Arihant-class submarines code named S4.[1][2]

The K-5 will be equipped with countermeasures to avoid radar detection and will be the fastest missile in its class.[1] It will also be equipped with MIRV.[6]

Development

The K-5 is being developed by the Defence Research and Development Organisation (DRDO).[5] The development of the missile started in 2015.[2] After completing the development of the K-4 (missile) in January 2020, the DRDO shifted its focus towards developing the K-5.[7]

As of December 2018, preparations for the maiden test of the missile were underway.[1] In October 2020, Hindustan Times reported that the missile is currently under development and was expected to be tested by 2022.[8]

Static testing of the second stage motor

On 12 September 2025, the Advanced Centre for Energetic Materials (ACEM) in Nashik conducted a static firing test of the second-stage motor developed under Project K5. The motor is a 10-tonne-class solid-propellant design measuring approximately 2.68 metres in length and 2.4 metres in diameter. Its composite motor case uses T700 carbon-fibre reinforcement with Epofine resin, while the propellant grain employs a nine-fin finocyl configuration of HD 1.3 composite propellant. The motor incorporates a pyrogen ignition system and a submerged, thrust-vectoring nozzle actuated by two electromechanical actuators.[9]

The test was intended to characterise the motor's ballistic performance and verify the operation and safety margins of its major subsystems. Instrumentation comprising more than 250 measurement channels was used to acquire test data. The nozzle was commanded through approximately ±2° of movement, with actuator operation beginning 10 seconds after ignition. The recorded pressure and thrust profiles were reported to be consistent with pre-test predictions, indicating the expected motor performance during the static firing.[9]

The motor was manufactured using a newly established 50-tonne-capacity cast-cure installation at ACEM, which employs hopper-based continuous casting for large propellant grains. The successful processing and subsequent firing provided a demonstration of the facility's capability for larger-class solid motors and was also the first reported test of this motor type at ACEM's refurbished static-test facility.[9]

Testing

More information Date/Time(IST), Launch Platform ...
Date/Time
(IST)
Launch Platform Range (km) Function Outcome
Remarks
30-31 MARCH 2026
Submerged test platform N/A (480 km NOTAM) Ejection test Success
India had issued a NOTAM for a naval firing exercise in an area extending approximately 480 km off the coast of Visakhapatnam, scheduled from 30 March 2026, 6:30 AM IST to 31 March 2026, 5:00 PM IST.[10] It reportedly involved a K-5 SLBM pop-up test (ejection test) in the Bay of Bengal. The test was reportedly intended to validate the missile's underwater ejection system and first-stage hardware.[11]
Close

See also

References

Related Articles

Timelines

Top Qs

Fact Checks