KD Pahang
From Wikipedia, the free encyclopedia
KD Pahang underway on 19 May 2007 | |
| History | |
|---|---|
| Name | Pahang |
| Namesake | Pahang |
| Builder | HDW, Kiel |
| Laid down | 21 December 2001 |
| Launched | 2 October 2003 |
| Commissioned | 3 August 2006 |
| Identification | Pennant number: F172 |
| Status | Active |
| General characteristics | |
| Class & type | Kedah-class offshore patrol vessel |
| Displacement | 1,850 tons full load |
| Length | 91.1 m (299 ft) |
| Beam | 12.85 m (42.2 ft) |
| Draught | 3.4 m (11 ft) |
| Propulsion | Main propulsion: 2x Caterpillar 3616 (5,450kW) diesel, 16,000 bhp, 2 shafts, 2 controllable pitch propellers |
| Speed | 24 knots (44 km/h; 28 mph) |
| Range | 6,050 nautical miles (11,200 km; 6,960 mi) |
| Endurance | 21 days |
| Complement | 78 (accom. for 98) |
| Sensors & processing systems |
|
| Electronic warfare & decoys |
|
| Armament |
|
| Aircraft carried | 1 x Super Lynx 300 |
| Aviation facilities |
|
KD Pahang (F172) is the second ship of Kedah-class offshore patrol vessel of the Royal Malaysian Navy. She was commissioned on 3 August 2006.