KD Tunku Abdul Rahman
From Wikipedia, the free encyclopedia
KD Tunku Abdul Rahman at Port Klang in September 2009 | |
| History | |
|---|---|
| Name | KD Tunku Abdul Rahman |
| Namesake | Tunku Abdul Rahman |
| Ordered | June 2002[1] |
| Builder | Naval Group, Cherbourg |
| Laid down | December 2003 |
| Launched | October 2007[1] |
| Commissioned | January 2009[1] |
| Home port | Sepanggar |
| Status | Active |
| General characteristics [2] | |
| Class & type | Scorpène-class submarine |
| Displacement | |
| Length | 67.4 m (221 ft 2 in) |
| Beam | 6.2 m (20 ft 4 in) |
| Draft | 5.4 m (17 ft 9 in) |
| Propulsion |
|
| Speed |
|
| Range |
|
| Test depth | More than 300 m (980 ft) |
| Complement | 32 |
| Sensors & processing systems |
|
| Electronic warfare & decoys | Thales DR 3000 tactical ESM receiver |
| Armament | 6 × 533 mm (21 in) torpedo tubes for 18 Whitehead Alenia Sistemi Subacquei Black Shark heavyweight torpedoes and SM-39 Exocet anti-ship missiles and 30 mines in place of torpedoes |
KD Tunku Abdul Rahman is a Scorpène-class submarine built for the Royal Malaysian Navy by Naval Group, formerly known as DCNS in Cherbourg, France and Navantia in Cartagena, Spain.