Khurja Super Thermal Power Plant
Under construction power plant in Uttar Pradesh, India
From Wikipedia, the free encyclopedia
Khurja super thermal power project or Khurja STPP is an under construction 1320 megawatt,[1] coal-fired supercritical power plant at Khurja in Bulandshahr, Uttar Pradesh, India. The project is the first thermal power project by THDC Ltd, projected to cost ₹12676 crores (US$1.8 billion). Both units of Khurja STPP have been synchronized with National Grid, Unit-1 in Oct’2024 & Unit-2 in Aug’2025 and are in commercial operation after COD declaration w.e.f. 26.01.2025 and 26.09.2025 respectively.
Official nameKhurja STPP
CountryIndia
LocationDashahra Kherli, Khurja (Bulandshahr)
Coordinates28.166757°N 77.903188°E
| Khurja Super Thermal Power Plant | |
|---|---|
![]() | |
| Official name | Khurja STPP |
| Country | India |
| Location | Dashahra Kherli, Khurja (Bulandshahr) |
| Coordinates | 28.166757°N 77.903188°E |
| Status | Under Construction |
| Construction began | Dec 2018 |
| Construction cost | ₹12,676 Crores (US$1.83 billion) |
| Owner | THDC Ltd |
| Thermal power station | |
| Primary fuel | Coal |
| Power generation | |
| Nameplate capacity | 1320 MW |
| External links | |
| Website | www |
Project
Clearances
Capacity
The planned capacity of the thermal power plant is 1320 MW (2 x 660 MW)
| Stage | Unit Number | Installed Capacity (MW) | Date of Commissioning | Status |
|---|---|---|---|---|
| Stage I | Unit I | 660MW | 26 Jan 2025 | Operational |
| Stage I | Unit II | 660MW | 26 Sep 2025 | Operational |