Wikiwand AI

Liberty Bridge (Pittsburgh)

Bridge in Pittsburgh, Pennsylvania From Wikipedia, the free encyclopedia

The Liberty Bridge, which was completed in 1928, connects downtown Pittsburgh, Pennsylvania, to the Liberty Tunnels and the South Hills neighborhoods beyond. It crosses the Monongahela River and intersects Interstate 579 (the Crosstown Boulevard) at its northern terminus.

Coordinates40.4328°N 79.9967°W / 40.4328; -79.9967
Carries4 lanes of roadway
Quick facts Coordinates, Carries ...
Liberty Bridge
The bridge in 2023
Coordinates40.4328°N 79.9967°W / 40.4328; -79.9967
Carries4 lanes of roadway
CrossesMonongahela River
LocalePittsburgh, Pennsylvania
Official nameLiberty Bridge
Other nameSouth Hills Bridge
Maintained byAllegheny County
Characteristics
DesignCantilever bridge
MaterialSteel
Total length2,663 feet (812 m)
Longest span2 spans, each 448 feet (137 m)
44.4 feet (13.5 m)
History
OpenedMarch 27, 1928; 98 years ago (1928-03-27)
Statistics
Daily traffic63,000[1]
Location
Interactive map of Liberty Bridge
Close

It was designed by George S. Richardson and cost $3,456,000 to build.

History

The Liberty Bridge is a steel cantilever bridge and was created as the missing link between downtown Pittsburgh and the Liberty Tunnel, which had been built four years earlier in 1924 as a link to the South Hills. The bridge opened on March 27, 1928, following a 5-mile (8.0 km) vehicle parade[2] from the southern suburbs of the city, which crossed the Smithfield Street Bridge and proceeded through downtown before ending at the southern end of the new bridge.[3][4]

It was designed by George S. Richardson and cost $3,456,000 to build. It is 2,663 feet 3⁄16 inch (811.687 m) long, the main span is 448 feet (137 m), and the water clearance is 44.4 feet (13.5 m).[citation needed]

It was renovated in 1982 by the Dick Corporation, at a cost of $32 million.[citation needed]

On September 2, 2016, the Liberty Bridge was closed for 24 days, following a fire during construction work on the bridge.[5][6] Intense heat from burning plastic piping had caused a 30-foot (9 m) steel beam (compression chord) to buckle.[7] The bridge reopened to weight-limited traffic on September 26, and full traffic on September 30. The Pennsylvania Department of Transportation assessed the value of the damages at over $3 million.[8]

See also

References

Related Articles

Timelines

Top Qs

Fact Checks