Line 11 of the Madrid Metro is a rapid transit line in Madrid, Spain. The line originally opened between Plaza Elíptica and Pan Bendito on 16 November 1998.

Native nameLínea 11
OwnerCRTM
LocaleMadrid
Termini
Quick facts Overview, Native name ...
Line 11
Platforms with 8000 series train at La Peseta station
Platforms with 8000 series train at La Peseta station
Overview
Native nameLínea 11
OwnerCRTM
LocaleMadrid
Termini
Stations7
Websitewww.metromadrid.es/en/linea/linea-11
Service
TypeRapid transit
SystemMadrid Metro
OperatorCRTM
Rolling stockCAF 8000
History
Opened16 November 1998; 27 years ago (1998-11-16)
Last extension2010
Technical
Line length8.5 km (5.3 mi)
CharacterUnderground
Track gauge1,445 mm (4 ft 8+7⁄8 in)
Route map

Conde de Casal
Atocha
Palos de la Frontera
Madrid Río
Comillas
↑ planned extension[1]
Plaza Elíptica
Abrantes
Pan Bendito
San Francisco
Carabanchel Alto
La Peseta
La Fortuna
Close

History

Empty platforms at Chamartín, intended for Line 11 and a possible Line 13

For the line's first eight years of existence, there were just three stations. In 2006 the line was extended from Pan Bendito to La Peseta with two intermediate stations.

In 2010 the line was extended once more to La Fortuna.

Future

Line 11 was projected to ultimately become one of the longest lines in Madrid according to plans of the regional government in 2005.[2]

The project to expand the line north and south was reimagined in 2020. The final form is projected to become a large 'Diagonal' which would connect 11 of the 12 lines of the metro. The new line is expected to extend to the south, to Cuatro Vientos in the south (connecting with Line 10). From the northeast, it will lead through the city centre, connecting all the lines at the East via a semicircular trajectory, then reaching the Barajas Airport and the new Hospital Isabel Zendal (built during the COVID-19 pandemic) and finally ending in the Valdebebas new urban development.[3] It has been pointed out that this expansion would alleviate the comparatively lacking interconnectedness of the outward lines, leading to shorter commutes and a declogging of the often overloaded circular Line 6.[4]

Works on the next section from Plaza Elíptica to Conde de Casal is scheduled to begin in November 2022, with the other sections scheduled to begin construction in 2024. The full extension is scheduled for completion by the second quarter of 2027.[5]

Rolling stock

Line 11 uses four-car trains of CAF class 8000 large rolling stock since the opening of the La Fortuna extension. Before that, the line used class 3000 trainsets.