Line 1 (Guangzhou Metro)

Line of the Guangzhou Metro From Wikipedia, the free encyclopedia

Line 1 of the Guangzhou Metro runs from Xilang to Guangzhou East Railway Station (18.5 km (11.50 mi)). Apart from Kengkou and Xilang, all stations in Line 1 are underground.[4] The first section, from Xilang to Huangsha, opened on 28 June 1997. The full line started operation on 28 June 1999. Line 1 is coloured yellow.

Other name(s)M1 ("" shape plan name)
Zhongshanlu line
(中山路线)
StatusOperational
LocaleTianhe, Yuexiu, and Liwan districts
Guangzhou, Guangdong
Quick facts Overview, Other name(s) ...
Line 1
A Line 1 train in 2023
Overview
Other name(s)M1 ("" shape plan name)
Zhongshanlu line
(中山路线)
StatusOperational
OwnerCity of Guangzhou
LocaleTianhe, Yuexiu, and Liwan districts
Guangzhou, Guangdong
Termini
Stations16
Color on map     Yellow (#f3d03e)
Service
TypeRapid transit
System Guangzhou Metro
Services1
OperatorGuangzhou Metro Corporation
DepotXilang Depot
Rolling stock21 cars Siemens Modular Metro-AEG/Adtranz (original order)
48 Bombardier Movia with CRRC Changchun Railway Vehicles[1]
Daily ridership1.04 million (2017 daily average)[2]
2 million (2015 Peak)[3]
History
Opened28 June 1997 (29 years ago) (1997-06-28)
Last extension16 February 1999 (27 years ago) (1999-02-16)
Technical
Line length18.5 km (11.50 mi)
Number of tracksDouble-track
CharacterUnderground and At-grade
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification1,500 V DC (overhead lines)
Operating speed80 km/h (50 mph)
SignallingSiemens Trainguard LZB 700 M, FTGS Moving block
Route map

 11  Up arrow Outer Circle
 3  Right arrow to Airport North (Terminal 2)
Guangzhou East Railway Station
 3   11   18 
 11  Right arrow Inner Circle
 18  Right arrow to Wanqingsha
Tianhe Sports Center
 13  Right arrow to Xinsha
Tiyu Xilu
 3  (OSI to  10   13 )
 3  Right arrow to Haibang
 10  Right arrow to Xilang
 13  Left arrow to Chaoyang
Yangji
 5 
 5 
Left arrow to Jiaokou
to Wenchong Right arrow
Dongshankou
 6 
 6  Left arrow to Xiangxue
Martyrs' Park
 12 
Peasant Movement Institute
Connection to Line 2
Gongyuanqian
 2 
Ximenkou
Chen Clan Academy
 8 
Changshou Lu
Huangsha
 6 
 6  Left arrow to Xunfenggang
 22  UpperLeft arrow to Airport North (Terminal 2)
 11 
Left arrow Inner Circle
Outer Circle Right arrow
Fangcun
 11   22   28 
 28 
Left arrow to Luzhou
to Xintang Right arrow
Huadiwan
Huadi River
Kengkou
Xilang Depot
Xilang
 Guangfo   10   22 
Close
SimplifiedChinese广州地铁1号线
TraditionalChinese廣州地鐵1號線
Cantonese YaleGwóngjāu Deihtit Yāt Houh Sin
Hanyu PinyinGuǎngzhōu Dìtiě Yī Hào Xiàn
Quick facts Simplified Chinese, Traditional Chinese ...
Line 1
Simplified Chinese广州地铁1号线
Traditional Chinese廣州地鐵1號線
Cantonese YaleGwóngjāu Deihtit Yāt Houh Sin
Transcriptions
Standard Mandarin
Hanyu PinyinGuǎngzhōu Dìtiě Yī Hào Xiàn
Yue: Cantonese
Yale RomanizationGwóngjāu Deihtit Yāt Houh Sin
Jyutpinggwong2 zau1 dei6 tit3 jat1 hou6 sin3
Canton Romanizationguong2 zeo1 déi6 tid3 yed1 hou6 xin3
Close

History

Planning

Guangzhou began investigating a metro in the 1960s. In August 1960, work started with a series of 6 boreholes across Guangzhou to assess ground conditions. A report was produced, however no further progress was made following an economic downturn.[5]

In 1965, with the Vietnam War escalating, it was decided to build a tunnel, initially as an air raid shelter, but with provision to run trains through it once the war was over. To maintain secrecy, the project was called 九号工程 (Project No. 9), named for the nine strokes in the characters for underground (地下). In the end, due to the lack of resources and rushed construction, the tunnel was never suitable for trains and the project was abandoned after the war. In the decades after, there were another 5 proposals for a metro, however none of these proceeded for various reasons.[5][6]

By the 1990s, the growing population and traffic congestion in Guangzhou had renewed interest in a metro. The Guangzhou Municipal Government committed to building Line 1 in May 1991 and a year later, the Guangzhou Mass Transit Railway Corporation (now Guangzhou Metro Corporation) was formed. In March 1993, Line 1 received planning approval.[6]

As this was only the fourth metro system in China, Guangzhou Metro looked overseas for expertise. Initially, there were talks with the France, however these were ultimately unsuccessful. In November 1993, Germany sent a delegation to China to negotiate a series of contracts, including a US$416m contract to build Line 1, which they ultimately won.[5][7]

Construction

Work started on 28 December 1994.[5] The main structure of Tiyu Xilu station was the first to be completed on 18 April 1997.[8] On 28 June 1997, the line between Xilang and Huangsha was opened to passengers. At this time the line was in "sightseeing operation", operating with much lower frequencies and a flat fare of ¥5.[9]

The largest station, Gongyuanqian, was completed on 20 August the same year and all tunnel boring was completed on 3 October. Train testing began on 30 September the following year, and all construction work had been completed by 28 December. From 16 February - 2 March 1999, the full line opened for "sightseeing operation" again. Following more testing, the line was officially opened on 28 June 1999.[8] The total investment was 12.2616 billion yuan with an average cost per kilometer of 662.9 million yuan.[10]

More information Segment, Commencement ...
SegmentCommencementLengthStation(s)Name
Xilang — Huangsha 28 June 1997 5.4 km (3.36 mi) 5 (initial section)
Huangsha — Guangzhou East 16 February 1999 13.1 km (8.14 mi) 11 (final section)
Close

Upgrades

In 2004, station ventilation and electrical systems started to be updated and platforms strengthened in preparation for retrofitting of platform screen doors in all stations, one of the first PSD retrofit projects in Mainland China.[11] By 2009, all stations on Line 1 were retrofitted with PSDs.[12]

Retrofitting for PSDs on Line 1

Since Line 1 began operation, there have been several incidents of service disruptions due to overhead catenary cable breakages.[13] During that period, Guangzhou Metro experimented rigid catenary installations between Kengkou and Huadiwan stations.[14] Rigid catenary was promoted on all newer lines using overhead electric traction such as Line 2. Beginning in 2007, Guangzhou Metro began converting Line 1's overhead into rigid catenary without shutting down regular service. Instead, trains ran at a speed of 30 km/h (19 mph) when passing through the temporary transition sections.[15][16][17]

In 2011, Line 1 carried out renovation work on the walls of stations along the entire line, removing the original wall tiles and replacing them with gray tiles. Chen Yihua, a middle school student from Guangzhou No. 16 Middle School, attracted media attention by protesting the rationale behind the renovation, arguing that the new uniform tiles destroyed the unique decoration and design features of each Line 1 station. In the end, the project was suspended with only some stations renovated. The rest of the stations remained as is temporarily.[18][19] In 2017, the platforms of Line 1's Guangzhou East Railway Station began to be renovated, having its wall tiles and false ceiling decorations replaced. However, the replaced tiles and decorations were similar in color to the original. Subsequently, the rest of the underground stations also began to have wall tiles replaced and decorations hung up accordingly, completing the remaining station renovations using designs as close to the original style as possible.

In June 2016, Guangzhou Metro began to study how to extend the service life of A1 trains, which were introduced in 1997.[20][21] The A1s were the rolling stock used during the opening of Line 1 and are the oldest in the Guangzhou Metro. The first A1 train started the refurbishment process between 2019–2020.[22] The refurbished trains feature rebuilt interiors, lighting and electrical systems as well as LCD passenger information screens.[23] The A3 trains were also updated with their dot-matrix route maps replaced by full color LCD passenger information screens.

Retrofitted LCD passenger display on an A3 car.

In order to ensure the continuation of reliable daily operations, there were plans to upgrade the existing aging signaling system of Line 1. According to the tender information, it will be upgraded to a newer version of the Siemens signaling system.[24] In February 2022, Guangzhou Metro decided to use the holidays in March and April to upgrade the catenary, signaling system and other equipment of Line 1. During the 16-day upgrade and renovation period, the two-way traffic of Line 1 was closed 1.5 hours earlier.[25]

Description

Line 1 starts at Xilang on the southwest edge of Guangzhou in Liwan district (formerly Fangcun district) as a surface level line. It then runs north, diving underground to cross the Pearl River in an immersed tube tunnel, the first to be built in China.[6] It then enters the old city at Huangsha, turning east to follow Zhongshan Road. Finally, it reaches the newer Tianhe district, turning north to terminate at Guangzhou East Railway Station.[8]

Although Line 1 has largely not been expanded since 1999, the passenger flows of Line 1 has been increasing as the Guangzhou Metro network continues to rapidly expand its coverage in and around Guangzhou. At present, the average daily passenger flow has exceeded one million passengers per day, ranking among highest of Guangzhou Metro's lines. Trains are often crowded during the morning and evening peak hours, and the platforms of key transfer stations (Gongyuanqian, Tiyu Xilu etc.) are even more crowded. Line 1 remains busy throughout the day leading to it being the subway line with the highest passenger intensity in Mainland China with 55,000 passengers/day/km in 2019.[26]

Line 1 drawn to scale.

Stations

  • OSI - Out-of-station interchange (only available for IC cards users)
More information Station No., Station name ...
Station
No.
Station name Connections Future Connections Distance
km
Location
English Chinese
101 Xilang 西塱  Guangfo  GF18  10  1001  22  2207 0.00 0.00 Liwan
102 Kengkou 坑口 1.64 1.64
103 Huadiwan 花地湾 1.03 2.67
104 Fangcun 芳村  11  1120  22  2208 1.35 4.02
105 Huangsha 黄沙  6  607 1.45 5.47
106 Changshou Lu 长寿路 0.77 6.24
107 Chen Clan Academy 陈家祠  8  812 1.16 7.4
108 Ximenkou 西门口 1.01 8.41 Yuexiu
109 Gongyuanqian 公园前  2  213 1.02 9.43
110 Peasant Movement Institute 农讲所 1.17 10.6
111 Martyrs' Park 烈士陵园  12  1215 1.08 11.68
112 Dongshankou 东山口  6  614 1.07 12.75
113 Yangji 杨箕  5  511 1.41 14.16
114 Tiyu Xilu 体育西路  3  311
Guangzhou Bus Rapid Transit GBRT
OSI:  APM  (Tianhenan APM07)
 10  (via Tianhe Road) OSI:  13  (Huacheng Square North) 1315 1.36 15.52 Tianhe
115 Tianhe Sports Center 体育中心 1.04 16.56
116 Guangzhou East Railway Station 广州东站  3  318  11  1108
 GS  Guangzhou East railway station GGQ
 18  1.96 18.52
Close

References

Related Articles

Wikiwand AI