Line 1 (Shaoxing Metro)
Metro line in Shaoxing, China
From Wikipedia, the free encyclopedia
Line 1 of Shaoxing Metro (Chinese: 绍兴轨道交通1号线; pinyin: Shàoxīng Guǐdào Jiāotōng Yīhào Xiàn) is a metro line in Shaoxing, Zhejiang Province, China.
| Line 1 | |
|---|---|
| 1 | |
Line 1 train | |
| Overview | |
| Status | Operational |
| Locale | Shaoxing, Zhejiang Province, China |
| Termini |
|
| Stations | 28 (main line) 3 (branch, 5 in 2025) |
| Service | |
| Type | Rapid transit |
| System | Shaoxing Metro |
| Operator(s) | Shaoxing Jingyue Metro Co., Ltd.[1] |
| Rolling stock | PM139 ZBM02 |
| History | |
| Opened | 28 June 2021[2] |
| Technical | |
| Line length | 47.1 km (Main line, in operation) 7.3 km[3] (Branch, 4.08 km opening in 2024)[4] |
| Character | Underground and elevated |
| Operating speed | 80km/h |
Line 1 is operated by Shaoxing Jingyue Metro Co., Ltd. under PPP Contract, a joinly between Shaoxing Metro Rail Transit Group Co., Ltd. (which holds 49%) and other entities [1][5].
Section
- Main line (Keqiao section)
The section from Guniangqiao to China Textile City opened on 28 June 2021.[2] The section is 20.3 km (12.6 mi) in length with 10 stations.[2] Elevated section from Yangxunqiao to Linhang Avenues.
Average speed through the trip: 38.3 km/h
- Main line (remaining section)
The section from China Textile City to Fangquan is 26.8 km (16.7 mi)[6] long and runs between China Textile City station in Keqiao District and Fangquan station in Yuecheng District, passing through the city center of Shaoxing with 18 stations.[3] The section opened on 29 April 2022.
- Branch line (future Line 4)
The branch line will branch off at Huangjiu Town and head north for 7.3 km (4.5 mi)[6] to Exhibition and Convention Center with 6 stations (5 new stations, Huangjiu Town station is already opened with the main line of Line 1).[3] The initial section opened on 1 April 2024[7] and the remaining section will open on 30 June 2025.[8] The branch line will be part of Line 4 in the future.[9]
Opening timeline
| Segment | Commencement | Length | Station(s) | Name |
|---|---|---|---|---|
| Guniangqiao — China Textile City | 28 June 2021[2] | 20.3 km (12.6 mi)[2] | 10 | Main line (Keqiao section) |
| China Textile City — Fangquan | 29 April 2022 | 26.8 km (16.7 mi) | 18 | Main line (remaining section) |
| Huangjiu Town — Daqingsi | 1 April 2024[7] | 4.08 km (2.5 mi)[4] | 3 | Branch line (initial section) |
| Daqingsi — Exhibition And Convention Center | 30 June 2025[8] | 3.22 km (2.0 mi) | 2 | Branch line (remaining section) |
Stations
Main line
| Station Name[10] | Connections | Distance km |
Location | ||
|---|---|---|---|---|---|
| English[10] | Chinese | ||||
| Guniangqiao | 姑娘桥 | 5 (Hangzhou Metro) | 0.13 | Xiaoshan, Hangzhou | |
| Yaqian | 衙前 | 3.53 | |||
| Yangxunqiao | 杨汛桥 | 5.75 | Keqiao, Shaoxing | ||
| Qianmei | 前梅 | 9.61 | |||
| Qianqing | 钱清 | Shaoxing Urban | 11.30 | ||
| Xisha Road | 西沙路 | ||||
| Linhang Avenue | 临杭大道 | ||||
| Jianshui Road | 鉴水路 | ||||
| Yuezhou Avenue | 越州大道 | ||||
| China Textile City | 中国轻纺城 | ||||
| Mingzhu Square | 明珠广场 | ||||
| Guazhuhu | 瓜渚湖 | ||||
| Jingshui Road | 镜水路 | Yuecheng, Shaoxing | |||
| Huangjiu Town | 黄酒小镇 | 1 (branch) | |||
| Zhangshu[a] | 张墅 | ||||
| Olympic Sports Center | 奥体中心 | ||||
| Meishan Square | 梅山广场 | 2 | |||
| Fenglin | 凤林 | ||||
| Datan | 大滩 | ||||
| Railway Station | 火车站 | Shaoxing Urban | |||
| City Square | 城市广场 | ||||
| Lu Xun Native Place | 鲁迅故里 | ||||
| Chengnan Avenue | 城南大道 | ||||
| Fenghuangshan | 凤凰山 | ||||
| Laojiafeng | 劳家葑 | ||||
| Nanchi | 南池 | ||||
| Qihu | 栖湖 | ||||
| Fangquan | 芳泉 | ||||
- Zhangshu station is under construction.
Branch line
| Station Name[10] | Connections | Distance km |
Location | ||
|---|---|---|---|---|---|
| English[10] | Chinese | ||||
| Huangjiu Town | 黄酒小镇 | 1 (main line) | Yuecheng | ||
| Shaoxing No.1 High School | 绍兴一中 | ||||
| Huxi | 湖西 | ||||
| Daqingsi | 大庆寺 | ||||
| Shaoxing North Railway Station | 绍兴北站 | ||||
| Convention and Exhibition Center | 会展中心 | Keqiao | |||
Rolling stock
| Stock | Class | Year built | Builder | Number built | Numbers | Formation | Depots | Line assigned | Notes |
|---|---|---|---|---|---|---|---|---|---|
| PM139 | B | 2020–2021 | CRRC Nanjing Puzhen | 108 (18 sets) | 01 001 - 01 019 (010011–010196) | Tc+Mp+M+M+Mp+Tc | Wanxiu Road Depot Jianhu Yard |
1 | |
| ZBM02 | 2020–2022 | Beijing Subway Rolling Stock Equipment | 162 (27 sets) | 01 020 - 01 046 (010201–010466) |