Wikiwand AI

Line 1 (Xuzhou Metro)

Metro line in Xuzhou, China From Wikipedia, the free encyclopedia

Line 1 of the Xuzhou Metro (Chinese: 徐州地铁1号线; pinyin: Xúzhōu dìtiě yī hào xiàn) is a rapid transit line in Xuzhou city, Jiangsu province, China. Construction commenced in February 2014, and the line was opened on September 28, 2019.[1] It is the first metro line to open in Xuzhou.

Native name徐州地铁1号线
StatusOperational
Termini
Quick facts Overview, Native name ...
Line 1
 1 
Line 1 Train approaching Luwo Station
Overview
Native name徐州地铁1号线
StatusOperational
LocaleXuzhou, Jiangsu
Termini
Stations18
Service
TypeRapid transit
SystemXuzhou Metro
Rolling stock6-car Type B (CRRC Nanjing Puzhen)
History
Opened28 September 2019; 7 years ago (2019-09-28)[1]
Technical
Line length21.970[2] km (13.652 mi)
Number of tracks2
CharacterUnderground, elevated
Operating speed80 km/h (50 mph)
Close

Line 1 runs primarily east-west through Xuzhou's main commercial areas, from Luwo in the west to Xuzhou East railway station in the east. It connects the old city, Bashan area, Chengdong New Area, People's Square, Huaihai Square, and Pengcheng Square. It also connects to both major railway stations in the city.

Opening timeline

More information Segment, Commencement ...
SegmentCommencementLengthStation(s)Name
Luwo — Xuzhoudong Railway Station 28 September 2019 21.967 km (13.65 mi)[2] 18 Phase 1
Close

Line overview

More information Station Name, Platform Type ...
Phase 1 stations (from west to east)
Station Name Platform Type Connections Location
English Chinese
Luwo 路窝 Elevated, side Tongshan
Xingshanzi 杏山子 Underground, island  S3  Tongshan / Quanshan
Hanshan 韩山 Quanshan
Gongnonglu 工农路
Renminguangchang 人民广场  5 
Sudilu 苏堤路
The Affiliated Hospital of Xuzhou Medical University 徐医附院
Pengchengguangchang 彭城广场  2  Gulou / Yunlong
Minzhubeilu 民主北路 Gulou
Xuzhou Railway Station 徐州火车站  3  China Railway Gulou / Yunlong
Zifangshan 子房山 Yunlong
Tongshanlu 铜山路
Huangshanlong 黄山垅  5 
Qingfenglu 庆丰路
Xuzhou Medical University 医科大学
Qiaojiahu 乔家湖  4 
Jinlonghu 金龙湖 Jiawang
Xuzhoudong Railway Station 徐州东站 6  7  China Railway High-speed
Close

History

As of June 2018, the civil engineering work was reported to be 95% complete, leaving mostly track laying, decorations, and electromechanical installations to be completed.[3] On August 30, 2018, railway work was declared complete, and electromechanical installations and decorations declared as "under intense progress".[4]

References

Related Articles

Timelines

Top Qs

Fact Checks