Line 6 (Xuzhou Metro)
From Wikipedia, the free encyclopedia
StatusOperational
OwnerXuzhou Metro
| Line 6 | |
|---|---|
| 6 | |
Xuzhou Tongshan District Hospital of TCM station platform | |
| Overview | |
| Status | Operational |
| Owner | Xuzhou Metro |
| Locale | Xuzhou, Jiangsu, China |
| Termini | |
| Stations | 16 |
| Service | |
| Type | Rapid transit |
| System | Xuzhou Metro |
| Operator(s) | Xuzhou Metro |
| Depot(s) | Wangzhuang Depot[1], Gaotie Parking Lot (高铁停车场)[2] |
| Rolling stock | CRRC Nanjing Puzhen 4 cars type B[3] |
| History | |
| Opened | 28 September 2025 |
| Technical | |
| Line length | 22.9 km (14.2 mi) |
| Number of tracks | 2 |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Electrification | 1,500 V DC Overhead catenary |
| Operating speed | 80 km/h (50 mph) (Maximum design speed) |
Line 6 of the Xuzhou Metro (Chinese: 徐州地铁6号线) is a rapid transit line in Xuzhou, Jiangsu, China. The first phase opened on 28 September 2025 with 16 stations, spanning 22.9 km long.[4] Line 6 is the first fully automated metro line using GoA4 automation level in Xuzhou.[5]