Wikiwand AI

Line 2 (Zhengzhou Metro)

Metro line in Zhengzhou, China From Wikipedia, the free encyclopedia

Line 2 of the Zhengzhou Metro (Chinese: 郑州地铁二号线; pinyin: Zhèngzhōu Dìtiě Èr Hào Xiàn) is a rapid transit line running from north to south of Zhengzhou. It opened on 19 August 2016. The line is currently 30.9 km long with 22 stations.[3][1][2]

StatusOperational
Termini
Quick facts Overview, Status ...
Line 2
 2 
A train of Zhengzhou Metro Line 2
Overview
StatusOperational
OwnerZhengzhou
LocaleZhengzhou, Henan, China
Termini
Stations22
Service
TypeRapid transit
SystemZhengzhou Metro
OperatorZhengzhou Metro Group Corporation
DepotChengnan Depot
History
Opened19 August 2016; 10 years ago (2016-08-19)
Technical
Line length30.9 km (19.2 mi)[1][2]
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+1⁄2 in)
ElectrificationOverhead lines (1500 volts)
Route map

Jiahe
Huijiquzhengfu
Maozhuang
Huangheyingbinguan
Jinwa
Jindalu
Liuzhuang
Liulin
Shamen  4 
 4  (U/C)
Left arrow to Laoyachen
to Langzhuang Right arrow
Beisanhuan Zhengzhou BRT Route B3
Dongfenglu
Guanhutun Zhengzhou BRT Route B2
Huanghelu  5 
 5 
Left arrow Outer loop to Wuyigongyuan
Inner loop to Zhengzhoudong Railway Station Right arrow
Zijingshan  1 
 1 
Left arrow to Henan University of Technology
to New Campus of Henan University Right arrow
Dongdajie  3 
 3 
Left arrow to Henan Sports Center
to Yinggang Right arrow
Longhaidonglu Zhengzhou BRT Route B5 Bus interchange
Erligang
Nanwulibao  5 
 5 
Left arrow Inner loop to Wuyigongyuan
Outer loop to Zhengzhoudong Railway Station Right arrow
Huazhai
Nansanhuan
Zhanmatun
Nansihuan
Chengnan Depot
Continues as  Chengjiao  to Xinzheng International Airport
Close

Through services are operated on Line 2 and Chengjiao line (part of future Line 9), although they are classified as separate lines.[4]

Map of Zhengzhou Metro Line 2

History

Interior of a train on Line 2

The first phase of the line began construction on 28 December 2010, and began operations on 19 August 2016.[5] The second phase of the line began operations on 28 December 2019.

Opening timeline

More information Segment, Commencement ...
SegmentCommencementLengthStation(s)Name
Liuzhuang — Nansihuan 19 August 2016 20.649 km (12.83 mi)[1] 16 Phase 1
Jiahe — Liuzhuang 28 December 2019[2] 10.25 km (6.37 mi)[2] 6 Phase 2
Close

Stations

More information Service Route, Station № ...
Line name Service Route Station
№
Station name Connections Location
Local Rapid English Chinese
Line 2 ● ● 0215 Jiahe 贾河 Huiji
● ● 0216 Huijiquzhengfu 惠济区政府
● ● 0217 Maozhuang 毛庄
● ● 0218 Huangheyingbinguan 黄河迎宾馆  7 
● ● 0219 Jinwa 金洼
● ● 0220 Jindalu 金达路
● ● 0221 Liuzhuang 刘庄 Jinshui
● ● 0222 Liulin 柳林
● ● 0223 Shamen 沙门  4 
● ● 0224 Beisanhuan 北三环 Zhengzhou BRT Zhengzhou BRT Route B3, B6
● ● 0225 Dongfenglu 东风路  8 
● ● 0226 Guanhutun 关虎屯 Zhengzhou BRT Zhengzhou BRT Route B2
● ● 0227 Huanghelu 黄河路  5 
● ● 0228 Zijingshan 紫荆山  1 
● ● 0229 Dongdajie 东大街  3  Guancheng
● ● 0230 Longhaidonglu 陇海东路 Zhengzhou BRT Zhengzhou BRT Route B5
● ● 0231 Erligang 二里岗  6 
● ● 0232 Nanwulibao 南五里堡  5 
● ● 0233 Huazhai 花寨
● ● 0234 Nansanhuan 南三环
● ● 0235 Zhanmatun 站马屯
● ● 0236/0936 Nansihuan 南四环
Chengjiao line ● | 0937 Shibalihe 十八里河 Guancheng
● | 0938 Shawoli 沙窝李 Xinzheng
● ● 0939 Shuanghudadao 双湖大道
● | 0940 Xiaoqiao 小乔
● | 0941 Hua'nancheng West 华南城西
● | 0942 Hua'nancheng 华南城
● | 0943 Hua'nancheng Dong 华南城东
● | 0944 Mengzhuang 孟庄
● ● 0945 Gangqu Bei 港区北  ZXA  Mengzhuang railway station
 Zhengxu 
● | 0946 Kangpinghu 康平湖 Xinzheng / Zhongmu Co.
● | 0947 Lanhegongyuan 兰河公园 Xinzheng
● | 0948 Enpinghu 恩平湖 Zhongmu Co.
● | 0949 Zonghebaoshuiqu 综合保税区
● ● 0950 Xinzheng International Airport 新郑机场  ZXA  EZF
Zhengzhou Xinzheng International AirportCGO
 Zhengxu 
Xinzheng
| | 0951 Terminal 3 3号航站楼
● | 0952 Jichang Dong 机场东 Zhongmu Co.
● | 0953 Gangqu Huizhan 港区会展
● ● 0954 Zhengzhou Hangkonggang Railway Station 郑州航空港站  ZXA  ZIF
Close

References

Related Articles

Timelines

Top Qs

Fact Checks