Zhengzhou BRT Route B6

From Wikipedia, the free encyclopedia

OperatorZhengzhou Bus Communication Corporation
VehicleYutong ZK6180CHEVNPG3 (18m)
Yutong H12 (12m)
Yutong E12 (12m)
StatusClosed
B6
Dianchang Road station with buses on Route B6
Overview
SystemZhengzhou BRT
OperatorZhengzhou Bus Communication Corporation
VehicleYutong ZK6180CHEVNPG3 (18m)
Yutong H12 (12m)
Yutong E12 (12m)
StatusClosed
Began service28 April 2016[1]
Ended service26 May 2019[2]
Route
LocaleZhengzhou
StartDianchang Road B/T (loop line)
Length42 km (26 mi)
Stops53
Other routesB601
Service
LevelDaily
Operates6:00 am – 9:00 pm
 B5   Zhengzhou BRT   

Zhengzhou BRT Route B6 was a discontinued bus rapid transit route operated by Zhengzhou Bus.

The route was commenced on 28 April 2016, together with two interval services (east interval and west interval).[1]

On 26 March 2018, the two interval services were merged into one, designated as B601.[3]

On 26 May 2019, the route together with Route B601 stopped service due to the adjustment of bus routes after the opening of Zhengzhou Metro Line 5.[2]

Route

The route was a loop line running on Dianchang Road, North 3rd Ring Road, Zhongzhou Avenue, Weilai Road, Hanghai Road, Changjiang Road, Tongbai Road and Qinling Road, with Dianchang Road Bus Terminus as the terminal station.

Branch routes

Fleet

References

Related Articles

Wikiwand AI