Line 4 of the Guangzhou Metro is a south-north line on the system that runs between Nansha Passenger Port and Huangcun stations, spanning a total of 60.03 km (37.30 mi) with 24 stations (while Guanqiao not yet in service). The sections of the line from Xinzao to Huangcun and Feishajiao to Nansha Passenger Port is underground, while the section from Jinzhou to Guanqiao is above ground.[4][5] Line 4's colour is dark green. Like line 5 and 6, trains runs with linear motor technology.

Other name(s)M5b (7 lines plan name)
M4 (2000 plan name)
Nansha line (南沙线)
StatusOperational
Quick facts Overview, Other name(s) ...
Line 4
Line 4 L1 train near Shiqi
Overview
Other name(s)M5b (7 lines plan name)
M4 (2000 plan name)
Nansha line (南沙线)
StatusOperational
OwnerCity of Guangzhou
LocaleNansha, Panyu,
Haizhu and Tianhe districts
Guangzhou, Guangdong
Termini
Stations23
Service
TypeRapid transit
SystemGuangzhou Metro Guangzhou Metro
Services2
OperatorGuangzhou Metro Corporation
Rolling stockCRRC Qingdao Sifang/
Kawasaki Heavy Industries
Metro cars[1]
Daily ridership373,900 (2017 daily average)[2]
556,000 (2019 Peak)[3]
History
Opened26 December 2005; 20 years ago (2005-12-26)
Technical
Line length60.03 km (37.30 mi)
Number of tracks2
CharacterUnderground + Elevated
Track gauge1,435 mm (4 ft 8+1⁄2 in)
ElectrificationThird rail, 1,500 V DC
(Overhead lines with same voltage installed in depot
and zig zag tracks near Nansha Passenger Port Station)
Operating speed85 km/h (53 mph)
Route map

Huangcun
 21 
 13  Right arrow to Xinsha
Chebei
 13 
 13  Left arrow to Chaoyang
Connection to Line 5
Chebeinan
 5 
 5 
Left arrow to Jiaokou
to Wenchong Right arrow
Wanshengwei
 8   THZ1 
 8 
Left arrow to Jiaoxin
to Lianhua (future) Right arrow
Luntouhai Creek
Guanzhou
 12 
Guanzhou River
Higher Education
Mega Center North
 12 
 7  Right arrow to Yanshan
Higher Education
Mega Center South
 7   12 
Connection to Line 7
Higher Education Mega Center South
Stabling Yard (Line 12)
Lijiao Stream
 7  LowerLeft arrow to Meidi Dadao
Xinzao
Xinzao Depot
Guanqiao
Shiqi
Haibang
 3 
 3  Left arrow to Airport North (Terminal 2)
Dichong
Shiqiaoli Creek
Shawan Creek
Dongchong
Qingsheng
Huangge Auto Town
Huangge
Jiaomen
 15 
 15  Left arrow anti-clockwise
Jiaomenjiao Creek
Jinzhou
Nansha Stabling Yard
Feishajiao
Guanglong
Dachong
Tangkeng
 15  Left arrow clockwise
Nanheng
 15 
Nansha Passenger Port
 15 
Shiziyang Creek
Close
SimplifiedChinese广州地铁4号线
TraditionalChinese廣州地鐵4號線
Hanyu PinyinGuǎngzhōu Dìtiě Sì Hào Xiàn
Hanyu PinyinGuǎngzhōu Dìtiě Sì Hào Xiàn
Quick facts Simplified Chinese, Traditional Chinese ...
Line 4
Simplified Chinese广州地铁4号线
Traditional Chinese廣州地鐵4號線
Transcriptions
Standard Mandarin
Hanyu PinyinGuǎngzhōu Dìtiě Sì Hào Xiàn
Yue: Cantonese
Jyutpinggwong2zau1 dei6tit3 sei3 hou6 sin3
Close

History

Early Planning

A line resembling the current northern section of Line 4 first appeared in plans for Guangzhou Metro in 1997. It would have been a branch off what was called Line 5 at the time, running from Pazhou to Grand World Scenic Park.[6]

By 2000, it had been separated into its own line and realigned to run from Xinzhao to Guangzhou Science City, with construction slated to start in 2002 or 2003, pending approval, and expected completion in 2010.[7]

The line received planning approval in 2005, planned to eventually connect the new districts of Luogang in the north and Nansha in the south. Four carriage linear motor train sets would run on the line, with the full line expected to need 30 sets initially.[8]

Phase 1 (Huangcun - Xinzhao)

Work on the line commenced on 28 January 2003, initially focusing on the northern terminus and interchange station with Line 2 (now Line 8), Chigang Pagoda station (since renamed Wanshengwei). The first section would run from here to Xinzhao via Guangzhou Higher Education Mega Center, with a total of 5 stations.[9]

With planning approval, this early work now formed part of Phase 1 from Olympic Sports Center (since renamed Huangcun) to Xinzhao, with a total of 8 stations, as well as a maintenance and stabling facility in Xinzhao.[8]

Phase 1 between Wanshengwei and Xinzhao stations opened for passenger service on 26 December 2005. The line initially operated at a very low frequency of approximately every 32 minutes, as only a single train was ready for service of the two that had arrived.[10]

The line was extended one stop north to Chebeinan on 28 December 2009, providing an interchange to Line 5 which opened on the same day.[11]

The final section of Phase 1 (Chebeinan to Huangcun) opened on 25 September 2010.[12]

Phase 2 (Xinzhao - Jinzhou)

A southward extension to the line, Phase 2, was approved in 2006. It would run from Xinzhao to Chongwei (since renamed Jinzhou), with a total of 10 stations, including 2 designated infill stations to be built later. Unlike phase 1, this section would be built elevated on a viaduct.[8]

The first section of Phase 2 between Xinzao and Huangge opened on 30 December 2006, following a 9 day full line closure for train testing.[13]

In the following year, the line again closed on 8 May for further testing, with replacement buses being provided. Upon reopening on 28 June, the remaining section of Phase 2 between Huangge and Jinzhou was opened for passenger service.[14]

The first of the infill stations opened as Qingsheng on 28 December 2017, together with Phase 3 of the line.[15] Work began on the second, named Guanqiao, in 2021. It was planned to be completed in 2024 but has not opened as of May 2026.[16]

Phase 3 (Jinzhou - Nansha Passenger Port)

In 2012, as part of the Guangzhou Urban Rail Transport Near-term Plan (2012-2018), a further southern extension of Line 4 to Nansha Passenger Port was approved, with a further 5 stations to be completed between 2013 and 2017.[17]

Work on the extension was officially started in Jinlong station (since renamed Feishajiao) on 31 May 2013.[18]

Phase 3 opened in full on 28 December 2017.[15]

Opening timeline

Line 4 drawn to scale.
More information Segment, Commencement ...
SegmentCommencementLengthStation(s)Name
Xinzao — Wanshengwei 26 December 2005 16.2 km (10.07 mi) 5 (1st section)
Huangge — Xinzao 30 December 2006 22.3 km (13.86 mi) 6 (2nd section)
Jinzhou — Huangge 28 June 2007 5.1 km (3.17 mi) 2 (3rd section)
Wanshengwei — Chebeinan 28 December 2009 3.8 km (2.36 mi) 1 Line 4 & 5 connector project
Chebeinan — Huangcun 25 September 2010 2.0 km (1.24 mi) 2 Northern extension
Nansha Passenger Port — Jinzhou 28 December 2017 13.64 km (8.48 mi) 6 Southern extension
Qingsheng 28 December 2017 Infill station 1 Guangshengang XRL connector
Close

Stations

More information Service routes, Station № ...
Service
routes
Station
№
Station name Connections Future Connections Distance
km
Location
English Chinese
● 401 Nansha Passenger Port 南沙客运港  15  0.00 0.00 Nansha
● 402 Nanheng 南横 2.97 2.97
● 403 Tangkeng 塘坑 2.30 5.27
● 404 Dachong 大涌 2.01 7.28
● 405 Guanglong 广隆 2.14 9.42
● 406 Feishajiao 飞沙角 1.91 11.33
● 407 Jinzhou 金洲 2.31 13.64
● 408 Jiaomen 蕉门  15  2.00 15.64
● 409 Huangge 黄阁 3.00 18.64
● 410 Huangge Auto Town 黄阁汽车城 1.54 20.18
● 411 Qingsheng 庆盛 Qingsheng railway station QSQ  GSH  4.07 24.25
● 412 Dongchong 东涌 2.39 26.64
● 413 Dichong 低涌 3.94 30.58 Panyu
● 414 Haibang 海傍  3  301-4 2.45 33.03
● 415 Shiqi 石碁 2.25 35.28
| 416 Guanqiao 官桥 PRDIR GQA  GH  2.49 37.77
●● 417 Xinzao 新造 7.25 45.02
●● 418 Higher Education Mega Center South 大学城南  7  709  12  1225 2.25 47.27
●● 419 Higher Education Mega Center North 大学城北  12  1224 2.22 49.49
●● 420 Guanzhou 官洲  12  1223 1.39 50.88 Haizhu
●● 421 Wanshengwei 万胜围  8  828
Haizhu Tram  THZ1  THZ110
3.69 54.57
●● 422 Chebeinan 车陂南  5  518 2.07 56.64 Tianhe
●● 423 Chebei 车陂  13  1322 Guangzhou Bus Rapid Transit GBRT 1.23 57.87
●● 424 Huangcun 黄村  21  2104
Tianhe East railway station JSQ
2.16 60.03
Close

Operations

On 9 May 2015, Line 4 commenced short working operations, with selected trains running only between Huangcun and Xinzao. This allowed headways in the busier northern section of the line to be reduced to as low as 3 minutes in the morning peak, serving the rapidly growing Huangcun and Higher Education Mega Center areas.[19]

Fleet

Line 4 uses four carriage linear motor L type trains. Each set is 71 m (233 ft) long, 2.8 m (9.2 ft) wide and has a maximum service speed of 90 km/h (56 mph).[20][21]

Thirty trainsets (designated class L1) were initially ordered for the line, to be manufactured by Kawasaki Heavy Industries in collaboration with CSR Sifang.[22] The first set rolled off the production line in Qingdao on 27 November 2005[20] and the final set was delivered in March 2008.[23]

A further 27 sets (designated class L5) were ordered ahead of the Phase 3 extension to Nansha Passenger Port. These were manufacturered fully domestically by CSR Sifang. The first four sets ran under their own power for the first time on 20 May 2017 and all sets had been delivered by 2 August the same year.[24][25]