Rapid transit line in Chengdu, China From Wikipedia, the free encyclopedia

Line 17 of the Chengdu Metro is a metro line in Chengdu. The whole line is 30.286 km when Phase 2 opens. The line uses 8-car Type-A trains operating up to 140 km/h speed powered by 25kV AC overhead lines.[5]

StatusOperational
Termini
Quick facts Overview, Status ...
Line 17
Line 17 train entering Huangshi station, in which has transferred to Line 19
Overview
StatusOperational
OwnerCity of Chengdu
LocaleChengdu, Sichuan
Termini
Stations21
Service
TypeRapid transit
SystemChengdu Metro
OperatorChengdu Metro Corporation
DepotWutongmiao Depot (五桐庙停车场)
History
Opened18 December 2020; 5 years ago (2020-12-18)[1]
Technical
Line length31.47 km (19.6 mi)[2][3]
Number of tracks2
Characterunderground
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
ElectrificationOverhead line, 25 kV 50 Hz AC
Operating speed140 km/h[4]
Close

Phase 1 runs from Jinxing station in Wenjiang District to Jitouqiao station in Wuhou District. Phase 1 is 26.145 km long with 5.5 km running elevated and 20.6 km running underground. There are 9 stations with 2 elevated stations and 7 underground stations.[6][7]

Phase 2, opened on September 17th 2025, extended the line west across central Chengdu to Gaohong station. It is 24.8 km long, all underground with 18 additional stations.[8]

Progress

  • On February 23, 2017, Sichuan Development and Reform Commission approved Line 17 Phase 1.[9]
  • On February 27, 2017, Line 17 Phase 1 started construction.[10][11]
  • On November 11, 2017, the first tunnel boring machine started digging section between Jiujiang North and Baifoqiao Stations.[12]
  • On March 24, 2019, Line 17 phase 1 elevated section was completed.
  • On April 9, 2019, Huangshi-Chengdu Fifth People's Hospital, Mingguang-#1 Vent Tunnel sections are completed.
  • On August 5, 2019, main structures of all stations on Line 17 was completed.[13]
  • On January 7, 2020, Line 17 Phase 2's Beimenqiao Station started excavation, marking the start of station construction for Phase 2.
  • On March 25, 2020, Line 17 Phase 1 finished track-laying.[14]
  • On June 19, 2020, Chengdu Metro started 3-month trial operation for Line 17.[15]
  • On June 24, 2020, Construction finished for Wutongmiao Depot (五桐庙停车场) for Line 17.[16]
  • On December 18, 2020, Line 17 from Jinxing station to Jitouqiao station was opened.
  • On October 20, 2022, 16:40, Line 17 Phase 2's Longzhuayan - Qingshuihedaqiao section finished both tunnel construction. This section is 369.602m long.[17]
  • On February 12, 2023, Line 19 Phase 2 is officially powered on.[18]
  • On February 21, 2023, Line 19 Phase 2 signal and communication system started operational testing in Xinmiao Control Centre (新苗控制中心), and Phase 2 signal now synchronizes with Phase 1.[19]
  • On February 22, 2023, Line 17 Phase 2 finished Jinxing station's main power centre's land clearance.[20]
  • On March 20, 2023, Line 19's Changshuncun Depot (长顺村停车场) is handover to operation.[21]
  • On March 28, 2023, Line 19 Phase 2 finished 160 km/h high-speed train testing, entering 1–2 months of systematic testing.[22]
  • On March 28, 2023, Chengdu Rail Transit 2023 Annal Media Gala was held in Wenjiashan Station of Line 19.[23]
  • On March 30, 2023, Line 19 Phase 2 finished construction and handover to operation team for operational testing.[24]
  • On May 26, 2023, all 45 trains of Line 19 Phase 2 are delivered.[25]
  • On September 6, 2023, Chengdu Metro debuted Train Maintenance Bots (车辆巡检机器人), AI-Railway Maintenance Bots (轨道智能巡检机器人), and Power-line Surveillance AI (弓网在线监测装置) on Line 19. This is the first AI-Maintenance Robot & System in the world. Chengdu Metro will implement full AI-Operation by 2025.[26]
  • On September 17, 2023, original Line 17 Phase 1: (Jinxing - Jitouqiao) splits into Line 19 Phase 1: (Jinxing - Jiujiang North) and new Line 17: (Jiujiang North - Jitouqiao), and 4-Car A-Train starts operation on Line 17. All passengers must transfer at the same platform at Jiujiang North between line 17 and line 19.[27][28]
  • On September 26, 2023, Line 18 and Line 19 starts co-operational testing.[29]
  • On September 30, 2023, Line 17 Phase 2's People's Park station finished structure construction.[30]
  • On October 3, 2023, Line 17 Phase 2's Qingshuihedaqiao station to Huanhhali station finished both tunnel construction.[31]
  • On 17 September, 2025, Line 17 Phase 2 from Jitouqiao station to Gaohong station was opened.

Operation

Opening - September 2023

Line 17 Phase 1 and Line 19 Phase 1 were running in connection as one route.

September 2023 - November 2023

Original Line 17 Phase 1: (Jinxing - Jitouqiao) split into Line 19 Phase 1: (Jinxing - Jiujiang North) and new Line 17: (Jiujiang North - Jitouqiao), and 4-Car A-Train starts operation on Line 17. All passengers must transfer at the same platform at Jiujiang North between line 17 and line 19.[32][33]

November 2023 - September 2025

As Line 17 Phase 2 and Line 19 Phase 2 are finished, the operation plan since November 28th is:[34] Line 17 Section:Jiujiang North - Baifoqiao - Jitouqiao

Line 19 Section: Jinxing - Huangshi - Chengdu Fifth People's Hospital- Fengxihe - Wenquan Avenue - Mingguang - Jiujiang North

September 2025 - Now

Line 17 Phase 2 and Phase 1 section going to operate together since September 17th, the route is going to operate from Jiujiang North - Jitouqiao - People's Park - Gaohong

Stations

More information Station №, Station name ...
Station

№

Station name Transfer Distance
km
Location
English Chinese
1701 Gaohong 高洪 Chenghua
1702 Weiling 威灵
1703 Hangtian Road 航天路
1704 Renmintang 人民塘
1705 Jichechang 机车厂
1706 Erxianqiao 二仙桥  7 
1707 Tashui Bridge 踏水桥
1708 Jianshe North Road 建设北路  6 
1709 Hongxing Bridge 红星桥  3  Jinniu
1710 Chenghuangmiao 城隍庙
1711 Xidajie Street 西大街 Qingyang
1712 People's Park 人民公园  2   10 
1713 Xiaonan Street 小南街  13 
1714 Provincial Orthopaedics Hospital 省骨科医院  5 
1715 Huanhua Lane 浣花里 Wuhou
1716 Qingshuihe Bridge 清水河大桥
1717 Longzhuayan 龙爪堰  7 
1718 Yanggongqiao 阳公桥
1719 Jitouqiao 机投桥  9  —— 0.000
1720 Baifoqiao 白佛桥 1.468 1.468
1721 Jiujiang North 九江北  19  4.179 5.647 Shuangliu