Wikiwand AI

List of Satish Dhawan Space Centre launches

List of launches from an Indian spaceport From Wikipedia, the free encyclopedia

This page provides a list summary of the launches taken place in Satish Dhawan Space Centre. It is the main satellite launch centre for ISRO. It is located in Sriharikota, a coastal village in Tirupati district of Andhra Pradesh, 80 km (50 mi) north of Chennai. Originally called Sriharikota Range (SHAR),[1] an acronym that ISRO has retained to the present day. The centre was renamed in 2002 after the death of ISRO's former chairman Satish Dhawan.

Launch statistics

As of 24 December 2025, there have been a total of 104 launches from the three main orbital pads,[Note 1] including 88 successful launches, 5 partial successes,[Note 2] and 11 failed launches. In addition to this, an indefinite number of suborbital launches has taken place from the Sounding Rocket Complex.

By rocket

Orbital vehicles

  • SLV: 4 (2 successful, 1 partial success, 1 failure)
  • ASLV: 4 (1 successful, 1 partial success, 2 failures)
  • PSLV: 63 (59 successful, 1 partial success, 3 failures)
  • GSLV: 18 (12 successful, 2 partial success, 4 failures)
  • LVM3: 9 (9 successful, 0 partial success, 0 failures)
  • SSLV: 3 (2 successful, 0 partial success, 1 failure)
  • Vikram-1: 1 (1 successful, 0 partial success, 0 failure)

Suborbital vehicles

By launch pad

More information SLV Launch Pad, First Launch Pad ...
Close

(Launches from the Sounding Rocket Complex may be greater than 4)

By year

1
2
3
4
5
6
7
8
1980
1985
1990
1995
2000
2005
2010
2015
2020
2025

(Launches from the Sounding Rocket Complex and ALP-01 Launch Pad are not included)

List of launches by pad

SLV Launch Pad

More information #, Launch date ...
# Launch date Launch vehicle & variant Version /
Serial [2]
Result Notes
1 10 August 1979 SLV-3 D1 Failure Faulty valve and wrong assessment causes vehicle to crash into the Bay of Bengal (317 s after takeoff), Developmental Flight.[3]
2 18 July 1980 SLV-3 D2 Success Developmental Flight.
3 31 May 1981 SLV-3 D3 Partial Success Did not reach intended height. Satellite only orbits for 9 days, Developmental Flight.[3]
4 17 April 1983 SLV-3 D4 Success Developmental Flight.
5 24 March 1987 ASLV D1 Failure First stage did not ignite after strap-on burnout, Developmental Flight.[4]
6 13 July 1988 ASLV D2 Failure Insufficient control gain, Developmental Flight.[4]
7 20 May 1992 ASLV D3 Partial Success Lower than expected orbit and incorrect spin-stabilisation, payload decayed quickly.[5]
8 4 May 1994 ASLV D4 Success SROSS-C2 launched.[5]
Close

First Launch Pad

More information #, Launch date ...
Close

Second Launch Pad

More information #, Launch date ...
Close

Sounding Rocket Complex

More information #, Launch date ...
# Launch date Launch Vehicle & Variant Version /
Serial [2]
Result Notes
1 3 March 2010[122] ATV D01 Success Carried a passive scramjet engine combustor module
2 28 August 2016[122] ATV D02 Success The first experimental mission of ISRO's Scramjet Engine towards the realisation of an Air Breathing Propulsion System
3 18 November 2022[123] Vikram-S Prarambh Success Carried 3 customer payloads. It was a India's First Private Rocket launch by Skyroot Aerospace
4 22 July 2024[122] ATV D03 Success Demonstration of Air Breathing Propulsion Technology
Close

ALP-01 (Dhanush) Launch Pad

More information #, Launch date ...
# Launch date Launch Vehicle & Variant Version /
Serial [2]
Result Notes
1 30 May 2024 Agnibaan SOrTeD Agnibaan SOrTeD Success Suborbital technology demonstrator from a privately built launch pad. Carried a mass simulator up to a height of 60 km (37 mi).
Close

Planned launches

More information Launch date, Launch pad ...
Launch date Launch pad Launch Vehicle Version/
Serial[124]
Payload
By Q1 2026[125] Second GSLV F17 IRNSS-1L
By Q1 2026[125] Second GSLV F18 GISAT-1A / EOS-05
By Q1 2026[125] First PSLV N1 TDS-01
By Q1 2026[125] First SSLV L1 TBD / PARIKSHIT
Close

Other test activities by ISRO

More information Launch date, Launch pad ...
Source:[126]
Launch date Launch pad Launch Vehicle & Variant Version /
Serial [2]
Result Notes
5 July 2018 - ISRO Pad Abort Test PAT Success Crew Escape System along with the simulated crew module with a mass of 12.6 tonnes, lifted off at 07.00 AM (IST) at the opening of the launch window from its pad at Satish Dhawan Space Centre, Sriharikota.
Close

See also

Notes

  1. Manually counting from the below given list of launches. All the stats given in this section have been found out using the same way.
  2. A partial success occurs when the payload is placed into an orbit where it was still usable even though the intended height or orbit was not reached, or which could be corrected with the spacecraft's own propulsion.

References

Related Articles

Timelines

Top Qs

Fact Checks