List of bridges and tunnels in Dubai
From Wikipedia, the free encyclopedia
These are the bridges in Dubai that are completed, under construction, proposed or approved.
Bridges in Dubai are operated by the Roads & Transport Authority (RTA).
List of completed bridges
| Bridge | Opened | Length (m) | Cost | Number of lanes | Vehicles per hour |
| Al Maktoum Bridge | 1963 | 9,500 | |||
| Floating Bridge, Dubai | 16 July 2007 | 300 meters | 155 million dirhams | 12 | 6,000 |
| Al Garhoud Bridge | 1976 | 520 metres | 415 million dirhams | 6 | 9,000 |
| Business Bay Crossing | June 2007 | 1.6 km | 800 million dirhams | 13 | 26,000 |
| Infinity Bridge | 16 January 2022 | 295 metres | 393 million dirhams | 12 | 24,000 |
List of bridges under construction or Approved
- Sheikh Rashid bin Saeed Crossing, upon completion will become worlds longest arch bridge, and will become sixth crossing across Dubai Creek.
- Dubai Smile, is an approved bridge which will supersede the existing Floating Bridge, upon completion it will become seventh crossing across Dubai Creek.
| Bridge | Expected completion | Length (m) | Cost | Number of lanes | Vehicles per hour |
| Sheikh Rashid bin Saeed Crossing | 2012 | 1.6 km | 2.5 billion dirhams | 12 | 9,500 |
| Dubai Smile | 2018 | 300 meters | 810 million dirhams | 12 | 24,000 |
| The Fifth Bridge[A][1] | 2.5 billion dirhams | 12 |
- Notes
- A. ^ Approved for construction.
All of tunnels in The United Arab Emirates
| Bridge | Opened | Length (m) | Cost | Number of lanes | Vehicles per hour |
| Al Shindagha Tunnel | 1975 | 550
Meters |
394 Million
Dhs |
4 | 15,000 vehicles per hour |
| Dubai Airport tunnel | Constructed during the mid 2000s, goes under Dubai Airport | 1500
Meters |
686 Million Dhs | 6 | 1,650 vehicles
Per hour |
| Palm Jumeirah tunnel | 2006[2] | 750 metre[3] | AED 400.00 Million[4] | 6 | 3,000 vehicles
per hour |