List of bus rapid transit systems in Europe

From Wikipedia, the free encyclopedia

The term bus rapid transit system (BRT system) has been applied to a wide range of bus, trolleybus, and electric bus systems. In 2012, the Institute for Transportation and Development Policy (ITDP) published a BRT Standard to make it easier to standardize and compare bus services.

Mercedes Citaro RATP, ligne TVM, Créteil Paris

The below list only includes BRT systems in Europe that are in operation or under construction.

Legend

Status (background color)
  • White: Operational
  • Light blue: Under construction
City
Primary city served by the buses and trolleybus.
System name
The English name of the bus rapid transit or overview article for city.
Operator
Operating the main bus services along its designated route.
Began
The year that the bus rapid transit began operating for passenger service.
Stations
Stations connected by transfers are counted as one station, unless otherwise note.
Length (km)
Track length; lines which share track are counted once or Corridor length; lines which sharing the same corridor are counted once.
Notes/Description
A short objective description and subjective of routes bus rapid transit ridership and passengers (daily).
Type
eBRT - Electric Bus Rapid Transit, using Trolleybuses or eBRT using Electric buses or other source.
BRT certified
ITDP standards-and-guides and bus-rapid-transit-standard year rewards.

Belgium

More information City, System name ...
BRT systems in  Belgium
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Liège Charleroi BRT [fr] Opérateur de transport de Wallonie (TEC) 1968 30 16 6 km (3.7 mi) Busway which was documented in a Transport Research Laboratory video. Not BRT certified in 2022.[1]
Close

Denmark

More information City, System name ...
BRT systems in  Denmark
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Aalborg Plusbus (da) - 23 September 2023 2 22 12 km (7.5 mi) Launch it first "Plusbus" BRT in the city. It is a 12 km route from the eastern to the westernmost part of the city; 1 km yet to be finalized.
It features bus exclusive lanes, all electric buses, each 25 meters long and with room for 153 passengers, and priority at all intersections on the route.[2][3][4]
eBRT electric buses Not BRT certified in 2022.[1]
Close

Finland

Runkolinja Rastila in Helsinki

In the following table, BRT systems in light blue are under construction.

More information City, System name ...
BRT systems in  Finland
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Helsinki The Jokeri line [fi] (Bussi-Jokeri Runkolinja 556) [5] Helsinki Regional Transport Authority 10 August 2015 1 35 27.5 km (17.1 mi) Runkolinja 550 [fi] close on 29 December 2023. Not BRT certified in 2022.[1]
Tampere - - - - - - BRT in their city[clarification needed] (still under construction)
Turku - - - - - - Have extensive bus-lane networks in their city centers.[clarification needed]
Close

France

Évéa BRT in Douai

Bus à haut niveau de service (BHNS) in French - High-level bus service in English[6]

In the following table, BRT systems in light blue are under construction.

More information City, System name ...
BRT systems in  France
City System name French name Began Lines Stations Length Notes/Description Type BRT certified
Aix-en-Provence BHNS Aixpress [fr] BHNS Aixpress 2 September 2019 6 19 7.2 km (4.5 mi) eBRT electric buses Not BRT certified in 2022.[1]
Antibes Envibus Line A [fr] BHNS Antibes 6 January 2020 76 35 -
Amiens Ametis Nemo 1 [fr] BHNS Amiens 11 May 2019 4 37 15.7 km (9.8 mi) eBRT electric buses
Angoulême Réseau Möbius [fr] BHNS Angoulême 2 September 2019 49 - 20 km (12 mi)
Annemasse TAC Tango [fr] BHNS Annemasse 15 December 2019 8 14 7.5 km (4.7 mi)
Avignon Chrono'hop [fr] BHNS Chrono'hop 19 October 2019 2 56 25 km (16 mi)
Bayonne Tram Bus Line T1 [fr] BHNS Bayonne 2 September 2019 3 33 - eBRT electric buses
Belfort BHNS Optymo [fr] BHNS Optymo phase II 26 August 2013 5 15 7.6 km (4.7 mi)
Besançon Besançon BRT [fr] BHNS Besançon 2 September 2017 1 - 4.1 km (2.5 mi) Route of line 3
Bordeaux Bordeaux express bus BHNS Bordeaux 1 June 2024 2 90 42 km (26 mi) Under construction
Brest Brest BRT [fr] Brest BHNS 14 February 2026 1 13 4.3 km (2.7 mi)
Cannes Le Palm Bus Express BRT BHNS Cannes 2013 2 25 11 km (6.8 mi) Not BRT certified in 2022.[1]
Chalon-sur-Saône BRT Flash BHNS Chalon-sur-Saône 2012 1 15 6 km (3.7 mi) Not BRT certified in 2022.[1]
Chartres C'Pégase BRT BHNS C'Pégas 1 September 2025 2 35 14.5 km (9.0 mi)
Clermont-Ferrand Line B of the Clermont-Ferrand T2C network [fr] Clermont-Ferrand BHNS 8 December 2012 - - 5.8 km (3.6 mi) Line B of the Clermont-Ferrand BHNS, Lines B (Royat to Stade Marcel Michelin) Not BRT certified in 2022.[1]
Line C of the Clermont-Ferrand BHNS [fr] 13 January 2014 - - 17.5 km (10.9 mi) Line C of the Clermont-Ferrand BHNS, Lines C (Tamaris to Cournon-d'Auvergne) [7]
Dijon Divia Mobilitès [fr] BHNS Dijon 25 October 2004 36 1090 - Not BRT certified in 2022.[1]
Douai Évéole [fr] BHNS Douai 8 February 2010 1 37 34 km (21 mi) Évéole is the public transport network used guided busway APTS Phileas[8] Not BRT certified in 2022.[1]
Douai High-Level Service Bus [fr] (Évéa) 18.7 km (11.6 mi)
Évry TICE [fr] BHNS TICE 31 December 2023 25 31 18 km (11 mi) TICE has a segregated, elevated system. France's first line (1975).[9] Not BRT certified in 2022.[1]
La Rochelle ILLICO BRT Line [fr] (Yélo Network) BHNS La Rochelle 2009 1 2 6 km (3.7 mi) Not BRT certified in 2022.[1]
Le Mans Line T3 of the BHNS of Le Mans [fr](SETRAM) BHNS Le Mans 20 February 2016 1 12 7.2 km (4.5 mi) Line T3 of the BHNS of Le Mans Not BRT certified in 2022.[1]
Lille Lille Metropole Lianas [fr] BHNS Lille 28 January 2008 13 121 67 km (42 mi) Not BRT certified in 2022.[1]
Lens and Béthune Tadao BHNS Lens 2003 67 - - Bubble Lines Not BRT certified in 2022.[1]
Lorient BRT Triskell BHLS [fr] BHNS Lorient 2007 6 43 14 km (8.7 mi) Not BRT certified in 2022.[1]
Lyon Lyon trolleybus line C1 [fr] BHNS Lyon 12 October 2006 2 7 8.4 km (5.2 mi) Trolleybuses in Lyon (Line C1 and C2 and C3) eBRT trolleybuses Not BRT certified in 2022.[1]
Lyon trolleybus line C2 [fr] 29 August 2011 4 10 12.1 km (7.5 mi)
Lyon trolleybus line C3 [fr] 30 October 2007 3 17 12 km (7.5 mi)
Marseille Marseille RTM [fr] BHNS de Lille - 5 - - Très Grands Bus (TGB lines) Not BRT certified in 2022.[1]
Maubeuge BHLS - Viavil - 2008 1 14 8.4 km (5.2 mi) Busway lines of the du Stibus network Not BRT certified in 2022.[1]
Metz BRT Mettis [fr] BHNS Mettis 5 October 2013 2 47 17.8 km (11.1 mi) A and B Line Not BRT certified in 2022.[1]
Line A of the Mettis of Metz [fr] 2 26 12.5 km (7.8 mi)
Line B of the Mettis de Metz [fr] 3 22 11 km (6.8 mi)
Line C of the Mettis of Metz [fr] - 3 21 10 km (6.2 mi) Under Construction still 2027
Montpellier Bustram of Montpellier [fr] BHNS Montpellier 23 May 2025 5 105 57 km (35 mi) Not BRT certified in 2025.[1]
Mulhouse BRT Mulhouse [fr] BHNS Mulhouse 2 September 2013 1 16 8.7 km (5.4 mi) Not BRT certified in 2022.[1]
Nancy Trolleybuses in Nancy BHNS Nancy 5 April 2025 1 25 10 km (6.2 mi) Trolleybuses Line T1: Essey-lès-Nancy, Mouzimpré to Vandœuvre, Brabois-Hôpitaux eBRT trolleybuses Not BRT certified in 2025.[1]
BRT Tempo Lines [fr] BHNS Nancy 24 August 2013 3 128 45.6 km (28.3 mi) Tempo Line T2: Laneuveville-devant-Nancy Centre to Laxou Sapinière,

Line T3: Seichamps Haie Cerlin to Villers Campus Sciences, Line T4: Houdemont Porte Sud to reach Laxou Champ-le-Bœuf.

Not BRT certified in 2022.[1]
Nantes Nantes Busway BHNS Nantes 6 November 2006 2 30 13 km (8.1 mi) eBRT electric buses Bronze BRT certified (2013).[1]
Nîmes BRT Tango+ [fr] BHNS Tango+ 29 September 2012 1 9 7.2 km (4.5 mi) Line T1 and line T2 Bronze BRT certified (2013).[1]
Nîmes Bus Rapid Transit Line T2 [fr] 7 January 2020 1 17 6.7 km (4.2 mi)
Paris, Île-de-France Trans-Val-de-Marne (TVM) - 1 October 1993 2 32 19 km (12 mi) Operated by RATP. It was the second BRT system implemented in France during the 1980s; for political reasons, there are no bus lanes through Saint-Maur-des-Fossés. BRT certified with Silver Excellence (2014).[1]
RATP bus line 393 [fr] - 10 September 2011 1 10 11 km (6.8 mi) Créteil 393 is also operated by RATP. Shares bus lane and stations with TVM for five kilometres. Not BRT certified in 2022.[1]
T Zen BHNS T Zen 4 July 2011 1 14 14.7 km (9.1 mi) Tzen 1 Not BRT certified in 2022.[1]
Pau BRT FÉBUS [fr] BHNS FÉBUS 8 July 2019 1 14 6 km (3.7 mi) Not BRT certified in 2022.[1]
Rennes BRT Rennes Trambus [fr] BHNS Rennes - 4 100 55 km (34 mi) Under construction Not BRT certified in 2022.[1]
Rouen TEOR - 12 February 2001 4 65 39 km (24 mi) T1, T2, T3 lines Silver BRT certified (2013).[1]
Saint-Nazaire BRT Helyce [fr] BHNS Hélyce 3 September 2012 2 20 9 km (5.6 mi) Not BRT certified in 2022.[1]
Sophia Antipolis BRT TEO [fr] BHNS Saint-Brieuc - - - 8 km (5.0 mi) Bus-Tram Not BRT certified in 2022.[1]
Strasbourg Line G of the Strasbourg BHNS [fr] Strasbourg BHNS 30 November 2013 2 34 13.2 km (8.2 mi) Line G of the Strasbourg BHNS (Gare Centrale–Espace Européen de l'Entreprise) Not BRT certified in 2022.[1]
Line H of the Strasbourg BHNS [fr] 24 February 2020 2 10 3.2 km (2.0 mi)
Toulouse Linéo [fr] BHNS Toulouse 2008 2 17 11 km (6.8 mi) Not BRT certified in 2022.[1]
Tours Line 2 Tempo [fr] BHNS Tours 31 August 2013 2 35 15.9 km (9.9 mi) Line 2 Tempo Not BRT certified in 2022.[1]
Close

Germany

More information City, System name ...
BRT systems in  Germany
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Essen Spurbus Essen Transport AG [de] 1980 2 - 24.2 km (15.0 mi) Guided buses use a busway in the center of a motorway. Not BRT certified in 2014.[1]
Oberhausen Oberhausen route 112 [de] Stadtwerke Oberhausen 2 June 1996 1 6 6.8 km (4.2 mi) Not BRT certified in 2014.[1]
Close

Greece

In the following table, BRT systems in light blue are under construction.

More information City, System name ...
BRT systems in  Greece
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Athens - - - - - - Thermal Bus Company Not BRT certified in 2024.[1]
Thessaloniki - OASTH 6 August 1957 85 4 - Not BRT certified in 2014.[1]
Close

Iceland

In the following table, BRT systems in light blue are under construction.

More information City, System name ...
BRT systems in Iceland
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Reykjavík Borgarlína - - - - - Under construction until 2026[10]
Close

Italy

Van Hool ExquiCity 18 trolleybus in Rimini, Metromare

In the following table, BRT systems in light blue are under construction.

More information City, System name ...
BRT systems in  Italy
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Rimini and Riccione Metromare Start Romagna SpA 23 November 2019 1 17 9.8 km (6.1 mi) eBRT trolleybuses Not BRT certified in 2022.[1]
Pescara La Verde Abruzzo Single Transport Company [it] (TUA) 11 September 2025 1 26 8.15 km (5.06 mi) eBRT trolleybuses Not BRT certified in 2025.[1]
Taranto Linee della rete BRT - - - - - System under construction[11] eBRT electric buses Not BRT certified in 2022.[1]
Turin - Gruppo Torinese Trasporti - - - - Under construction[12] eBRT electric buses Not BRT certified in 2025.[1]
Genoa 4 Assi di Forza - - - - - (4 Assi di Forza - Superbus - project of 4 BHNS lines, scheduled to enter service between 2024 and 2026[13] eBRT trolleybuses Not BRT certified in 2022.[1]
Close

Netherlands

Red articulated bus at a station
Zuidtangent bus in Hoofddorp
More information City, System name ...
BRT systems in  Netherlands
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Almere AllGo [nl] (Maxx Almere) Connexxion 10 December 2017 10 19 58 km (36 mi) Started on 4 January 2004 and Close Maxx Almere [nl] on 9 December 2017 replace to AllGo Buses. Not BRT certified in 2022.[1]
Eindhoven Phileas - 2003 3 32 15 km (9.3 mi) Bus rapid transit and guided busway, Phileas system in Eindhoven.[14] Not BRT certified in 2014.[1]
Amsterdam, Schiphol R-net [nl](Zuidtangent) GVB 2002 2 33 56.7 km (35.2 mi) Zuidtangent rename to R-net Buses lines 300 and 397. Not BRT certified in 2014.[1]
Enschede Bravodirect [nl] (HOV) Twents (public transport) [nl] July 2018 2 40 23 km (14 mi) High-quality public transport [nl] (HOV Buses) under Bravodirect. Not BRT certified in 2022.[1]
Utrecht U-OV [nl] Qbuzz 2001 2 16 8.2 km (5.1 mi) Line 28 to the De Uithof university campus and Vleuten. Not BRT certified in 2014.[1]
Close

Norway

Trondheim AtB metrobus

In the following table, BRT systems in light blue are under construction.

More information City, System name ...
BRT systems in  Norway
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Trondheim Metrobus [no] Vy Buss, Tide ASA 3 August 2019 3 150 - The city's transport authority, claim AtB as owner of company[15] Not BRT certified in 2022.[1]
Stavanger/Sandnes Bussveien - - - - 50 km (31 mi) The bus rapid transit system planned to be the longest in Europe, 50 km, 80% dedicated right of way.[16] (Under construction planned finished phase one: 2026.) Not BRT certified in 2025.[1]
Close

Poland

In the following table, BRT systems in light blue are under construction.

More information City, System name ...
BRT systems in  Poland
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Kraków - - - - - - There is a bus rapid transit system shared with trams, consisting of two sections, one at Monte Cassino Street and another one at Grzegórzki Street, Warsaw Uprisers' Avenue and in the north part of Old Town ring, as well as bus lanes on the Three Wisemen Avenues. Not BRT certified in 2024.[1]
Close

Portugal

Metrocarro Estacao Lousa, Metro Mondego Mobility System

In the following table, BRT systems in light blue are under construction.

More information City, System name ...
BRT systems in  Portugal
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Coimbra Mondego Mobility System Metro Mondego, SA 29 August 2025 3 42 42 km (26 mi) Portugal's first Bus Rapid Transit system was announced in 2020 and is expected to launch by the end of 2025. With an extension of 42 km, 42 stations, 35 vehicles, and initially connecting 3 municipalities.[17] To be completed by 2025, with the first phase operational by the end of 2024. Construction is currently under way. eBRT electric buses Not BRT certified in 2024.[1]
Porto Metrobus line 1: (Casa da Música – Império) Metro do Porto 28 February 2026 1 7 3.7 km (2.3 mi) A Bus Rapid Transit System, produced by Caetanobus will be built between Boa Vista and Praça do Império. It will be 8 kilometres long and is scheduled to be completed by the last quarter of 2023.[18] It plans to have a fleet of 8 hydrogen fuel cell bus powered articulated buses.[19] Not BRT certified in 2024.[1]
Metrobus line 2: (Casa da Música – Anémona) August 2026 1 9 6 km (3.7 mi)
Braga Braga BRT - - - - - Under construction, to be completed by 2026. Not BRT certified in 2024.[1]
Faro Algarve Metrobus - - 1 24 34 km (21.1 mi) A proposed 38 kilometre line that will that will connect the city of Faro with the neighboring municipalities of Olhão and Loulé. It will serve around 85,000 residents, costing €300-€510 million upon completion in 2029. (Under construction, to be completed by 2029) Not BRT certified in 2024.[1]
Close

Spain

Unidad articulada del BEi TUVISA in Vitoria-Gasteiz

In the following table, BRT systems in light blue are under construction.

More information City, System name ...
BRT systems in  Spain
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Barcelona Barcelona Orthogonal Bus Network [es] Transports Metropolitans de Barcelona (TMB) 1 October 2012 28 - - [20] eBRT electric buses Not BRT certified in 2022.[1]
Castellón de la Plana TRAM Castellón Mediterranean Cars (AMSA) 25 June 2008 1 19 7.765 km (4.825 mi) eBRT trolleybuses Not BRT certified in 2022.[1]
Granada Granada LAC Rober Transport [es] 29 June 2014 1 19 8.4 km (5.2 mi) Not BRT certified in 2022.[1]
Las Palmas MetroGuagua [es] Municipal Buses [es] - 12 20 11.7 km (7.3 mi) System under construction expected for 2027. eBRT electric buses Not BRT certified in 2024.[1]
Madrid Line BR1 (EMT Madrid) [es] EMT Madrid May 2023 8 - 31 km (19 mi) [21][22] eBRT electric buses Not BRT certified in 2022.[1]
Murcia Tranvibus de Murcie - - 3 - 20.84 km (12.95 mi) eBRT electric buses Not BRT certified in 2024.[1]
Seville Tranvibus de Séville TUSSAM 2025 2 17 12.1 km (7.5 mi)
Pamplona Regional Urban Transport Trunk Network [es] Transports Ciutat Comtal (TCC) - 4 - 24 km (15 mi)
Vitoria-Gasteiz BEI of Vitoria [es] (Bus Electrocínico Inteligente) TUVISA (Vitoria Urban Transport SA) 1 March 2022 2 23 10,157 km (6,311 mi) eBRT electric buses Not BRT certified in 2022.[1]
Close

Sweden

A modern bi-articulated bus Malmö Expressen Line 5 in Malmö, Sweden
More information City, System name ...
BRT systems in  Sweden
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Gothenburg Stombussar [sv] Västtrafik January 2003 4 24 17 km (11 mi) The lines (16-19) have frequent service. Routes usually share the right-of-way with trams or have a busway. Not BRT certified in 2022.[1]
Stockholm Blåbussar [sv] (Blue buses) Storstockholms Lokaltrafik 1998 5 - 40 km (25 mi) The lines (1-4, 6) run frequently and have a higher priority than other buses. The buses are blue; other buses are red. Differences between blue and red buses are very slight however. Not BRT certified in 2022.[1]
Malmö Malmö Expressen Line 5 (Huvudlinjer) Nobina Sverige and Skånetrafiken 1 June 2014 8 16 - The (main lines) (1-8), which run every seven or eight minutes on weekdays. eBRT electric buses Not BRT certified in 2022.[1]
Jönköping Citybussarna [sv] Örebro County Transport [sv] 1996 3 440 39.2 km (24.4 mi) Line (1-3), which usually run about every 10 minutes. Not BRT certified in 2022.[1]
Örebro Stombussar [sv] City buses in Västerås [sv] and Länstrafiken Örebro [sv] 1915 10 - - It serve two other urban lines. Not BRT certified in 2022.[1]
Linköping Stomlinjer [sv] Östgötatrafiken [sv] - 6 - - Not BRT certified in 2022.[1]
Close

Switzerland

More information City, System name ...
BRT systems in  Switzerland
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
Geneva TOSA Geneva Public Transport December 2025 1 - - Bus line 5[23] eBRT electric buses Not BRT certified in 2025.[1]
Close

Turkey

United Kingdom

Van Hool Exqui.City 18 bus on route G2 in the Titanic Quarter, Belfast, N. Ireland

In the following table, BRT systems in light blue are under construction.

More information City, System name ...
BRT systems in  United Kingdom
City System name Operator Began Lines Stations Length Notes/Description Type BRT certified
BelfastGlider (EWAY)TranslinkSeptember 2018--24.5 km (15.2 mi)The bus rapid transit system operating on Service G1 serves east–west and service G2 serves Titanic Quarter.eBRT electric busesNot BRT certified in 2022.[1]
Birmingham, West MidlandsSprint. SprintDiamond West Midlands-7--A limited stop service with dedicated bus lanes, with a total of 7 routes to be operational by 2026. (Under construction until 2026)
BradfordManchester Road Quality Bus Initiative Bradford endFirst West YorkshireOctober 2001---1.4 miles (2.3 km) of guided busway and a further 0.6 miles (1 km) of unguided bus lanes on Manchester Road to the city centre.
BristolMetroBusFirst West of England29 May 20185-50 km (31 mi)The bus rapid transit network which is a section of guided busway in Ashton Gate and a bus-only exit and bridge on the M32 motorway
CambridgeshireCambridgeshire Guided BuswayStagecoach East & Whippet7 August 20113825 km (16 mi)The guided busway runs north-west from Milton Road to St Ives and south from the station to the Trumpington park and ride.[24]Bronze BRT certified (2013).[1]
ColchesterColchester BRTFirst Essex2025188 km (5.0 mi)Not BRT certified in 2025.[1]
CrawleyFastway BRTMetrobusOctober 2006315024 km (15 mi)Segregated lanes and 1 mile (1.5 km) of guided busway. route 10 connects Bewbush to Gatwick Airport, Route 20 links Broadfield to Horley, and Route 100 runs between Maidenbower and Redhill, all with stops in Crawley and Gatwick AirportNot BRT certified in 2022.[1]
HampshireSouth East Hampshire BRT (Eclipse)First Hampshire & Dorset22 April 2012273.4 km (2.1 mi)Between Gosport and Fareham. A 2.8-mile (4.5 km) bus-only road along the former Fareham–Gosport line has been opened from Titchborne Way in Gosport to Redlands Lane in Fareham as phase one of a larger scheme. Operated by First Hampshire & Dorset as Eclipse.
Hertfordshire & Essex Hertfordshire Essex Rapid Transit (HERT) - - 3 Proposed system across Hertfordshire and part of Essex[25] Not yet specified
Ipswich Ipswich Rapid Transit
(Superroute 66)
First Bus East of England 1995 - - - It is a 219 yards (200 m) guided busway section.
Kent & Essex Fastrack Go-Ahead London & Stagecoach South East 26 March 2006 7 - - Unguided with sections of segregated running using standard buses and was re-opened on 17 November 2024 eBRT electric buses
LeedsLeeds SuperbusFirst West YorkshireJuly 1998---Guided busway along York Road (the A64)
Liverpool - Metro (Merseytravel; Operator TBC) - - - - New rapid 'Glider' bus that will provide connections to Liverpool John Lennon Airport and the city's football stadiums by 2028. The 18-metre, articulated vehicle can transport around 30% more passengers than an average double decker bus. Under construction eBRT electric buses
LondonEast London TransitBlue Triangle & Go-Ahead London20 February 2010--Bus rapid transit system with three routes.
LutonLuton to Dunstable BuswayArriva & Centrebus and Grant Palmer24 September 2013--13.4 km (8.3 mi)It runs between Luton Airport and Houghton Regis via Dunstable following the Dunstable branch line, which closed in 1989, running parallel to the A505 (Dunstable Road) and A5065 (Hatters Way).It runs for 6.1 miles, 4.8 mi are guided bus track with a maximum speed of 50 mph. The £91 million scheme.
Greater ManchesterLeigh-Salford-Manchester Bus Rapid TransitGo North West, Bee Network3 April 201623522 km (14 mi)From Leigh and Atherton to Manchester via Tyldesley and Ellenbrook. The 29-stop scheme totals 14 miles (22 km) and uses part of a former railway line to form a 4 miles (7 km) guided busway with a pedestrian and cycle lane and bridleway. It then joins the East Lancashire Road in a dedicated bus lane.[26]
Gateshead, Newcastle upon Tyne & Tyne and WearCentrelinkGo North East----Was an infrastructure project including an exclusive busway for bendy bus services
RuncornRuncorn BuswayArriva North WestOctober 1971-3822 km (14 mi)It was the first BRT system in the world and runs for 22 kilometres (14 mi) in a figure of 8 across the town.[27][28]
Sheffield Bus Rapid Transit North First South Yorkshire 4 September 2016 3 - - -
SwanseaFTR MetroFirst CymruSeptember 200912713.5 km (8.4 mi)Partially segregated, specialised BRT vehicles, on-board payment to customer-care attendant, runs every 15 minutes from 7 am to 7 pm (a conventional bus at other times).
Close