List of power stations in Uganda
From Wikipedia, the free encyclopedia
This article lists all power stations in Uganda. As of September 2024, Uganda's installed national generation capacity was 2,048.1 MW of electricity.[1]
Hydroelectric
Completed
Proposed
| Hydroelectric power station | Community | Coordinates | River | Type | Name of reservoir | Capacity (megawatts) | Completion expected |
|---|---|---|---|---|---|---|---|
| Achwa 3 Hydroelectric Power Station[38] | Achwa, Gulu District | 3.018622°N 32.548332°E | Achwa River | Run of river | N/A | 10[39] | 2022 |
| Agbinika Power Station | Yumbe, Yumbe District | 3.5000°N 31.1200°E | Kochi River | Run of river | N/A | 20[40] | 2025 |
| Ayago Power Station[41] | Ayago, Nwoya District | 2.3630°N 31.9200°E | River Nile | Run of river | N/A | 880[42] | 2025 |
| Muzizi Power Station | Ndaiga, Hoima District | 0.9650°N 30.5450°E | River Muzizi | Run of river | N/A | 44.7[43] | 2021[44] |
| Nengo Bridge Hydropower Station | Nengo Rukungiri District | 0.815000°S 29.833333°E | River Mirera | Run of river | N/A | 6.7 | 2022[45] |
| Nyagak II Power Station | Paidha, Zombo District | 2.5000°N 30.9900°E | River Nyagak | Run of river | N/A | 5[46] | 2023 |
| Nshungyezi Power Station | Nshungyezi, Isingiro District | 1.0000°S 30.7450°E | River Kagera | Run of river | N/A | 39[47] | 2025 |
Thermal
Completed
Proposed
| Thermal power station | Community | Coordinates | Fuel type | Capacity (megawatts) | Completion expected | Owner | Notes |
|---|---|---|---|---|---|---|---|
| Nzizi Thermal Power Station | Nzizi Hoima District |
1.5000°N 30.9300°E | Natural gas, heavy fuel oil | 100[62][63] | 2023 | Tullow Oil Plc. & Jacobsen Elektro | |
| Osukuru Thermal Power Station | Osukuru Tororo District |
0.632209°N 34.158321°E | Peat, heavy fuel oil | 12[64] | 2020 | Guangzhou Dongsong Energy Group[65] | |
Hybrid
| Hybrid power station | Community | Coordinates | Fuel types | Capacity (megawatts) | Year completed | Owner | Notes |
|---|---|---|---|---|---|---|---|
| Bukuzindu Hybrid Solar and Thermal Power Station | Bukuzindu Kalangala District |
0.306944°S 32.152500°E | Solar power & diesel fuel | 1.6[66] | 2014 | KIS & Uganda Development Corporation | |
Solar
Completed
| Solar power station | Community | Coordinates | Fuel type | Capacity (megawatts) | Year completed | Owner | Notes |
|---|---|---|---|---|---|---|---|
| Soroti Solar Power Station[67] | Soroti District | 1.700278°N 33.659167°E | Solar | 10[68] | 2016[69] | Total Eren[70] | |
| Tororo Solar Power Station | Tororo District | 0.638889°N 34.119167°E | Solar | 10[71] | 2017[71][72] | Simba Telecoms Limited, Building Energy SpA |
|
| Kabulasoke Solar Power Station[73] | Kabulasoke, Gomba District | 0.162500°N 31.794722°E | Solar | 20[73] | 2019[74] | Xsabo Power Limited | |
| Mayuge Solar Power Station[75] | Bufulubi, Mayuge District | 0.495000°N 33.407500°E | Solar | 10[75] | 2019[75] | Tryba Energy | |
| Busitema Solar Power Station | Busitema, Busia District | 0.547222°N 34.023611°E | Solar | 4[76] | 2022 | Government of Uganda | |
Proposed
| Solar power station | Community | Coordinates | Fuel type | Capacity (megawatts) | Year completed | Owner | Notes |
|---|---|---|---|---|---|---|---|
| Namugoga Solar Power Station | Wakiso District | 0.172778°N 32.568056°E | Solar | 50[77] | Solar Energy for Africa, Naanovo Energy Inc. |
||
| Nkonge Solar Power Station | Mubende District | 0.620556°N 31.828611°E | Solar | 50[78] | The Xsabo Group | License issued 28 September 2020 | |
| Ituka Solar Power Station | Madi Okollo District | 2.772222°N 31.038889°E | Solar | 20[79][80] | AMEA Power | ||
Geothermal
Proposed
| Geothermal power station | Community | Coordinates | Fuel type | Capacity (megawatts) | Year completed | Owner | Notes |
|---|---|---|---|---|---|---|---|
| Buranga Geothermal Power Station[81] | Bundibugyo District | 0.833062°N 30.166947°E | GT energy | 100[82] | 2020 (expected) | GIDS[83] | |
| Katwe Geothermal Power Station[84] | Lake Katwe Kasese District |
0.1450°S 29.8900°E | GT energy | 150[85] | To be determined | AAE Systems Inc. & Katwe Geothermal Limited | |