Osukuru Thermal Power Station

Planned thermal power plant in Uganda From Wikipedia, the free encyclopedia

The Osukuru Thermal Power Station is a planned 12 MW (16,000 hp) chemical-fired thermal power plant in Uganda.[1]

CountryUganda
LocationOsukuru, Tororo,
Tororo District
Coordinates00°37′56″N 34°09′30″E
StatusPlanned
Quick facts Country, Location ...
Osukuru Thermal Power Station
Location of Osukuru Thermal Power Station
CountryUganda
LocationOsukuru, Tororo,
Tororo District
Coordinates00°37′56″N 34°09′30″E
StatusPlanned
Commission date2020 (expected)
OwnerGuangzhou Dongsong Energy Group
Thermal power station
Primary fuelChemical
Power generation
Nameplate capacity12 MW (16,000 hp)
Close

Location

The power station would be in Osukulu Hills, about 8 kilometres (5 mi), by road, south of the central business district of Tororo, the headquarters of the Tororo District.[2] This is approximately 204 kilometres (127 mi), by road, east of Kampala, the capital of the country.[3]

Overview

The power station is a planned joint project by the government of Uganda and the Chinese Guangzhou Dongsong Energy Group. The station would be part of a US$620 million development known as the Osukuru Industrial Complex.[1] The plant primarily would use excess heat generated during the chemical processes in the manufacturing complex to heat either steam or compressed air, which would turn the turbines and generate the electricity.[4] Construction of the industrial complex commenced in October 2015.[5]