Little Cheyne Court Wind Farm

From Wikipedia, the free encyclopedia

LocationRomney Marsh
Coordinates50°57′45″N 00°49′13″E / 50.96250°N 0.82028°E / 50.96250; 0.82028
StatusOperational
Little Cheyne Court Wind Farm
Little Cheyne Court wind farm, close to power lines running to Dungeness Nuclear Power Station
CountryEngland, United Kingdom
LocationRomney Marsh
Coordinates50°57′45″N 00°49′13″E / 50.96250°N 0.82028°E / 50.96250; 0.82028
StatusOperational
Commission dateApril 2009
Power generation
Units operational26 x 2.3 MW
Make and modelNordex: N90
Nameplate capacity59.8 MW
External links
CommonsRelated media on Commons

The Little Cheyne Court Wind Farm is located 7 kilometres (4.3 miles) west of Lydd on Romney Marsh. It was built by npower renewables and cost around £50 million. The 26 wind turbines, each 115 metres (377 ft) high, are distributed over an area of 4 km2 (1.5 sq mi) with peak generation of 59.8 MW.[1]