Liudao Kou station
Beijing Subway station
From Wikipedia, the free encyclopedia
Liudao Kou station[1] (Chinese: 六道口站; pinyin: Liùdàokǒu zhàn) is an interchange station between Line 15 and Changping line of the Beijing Subway. The station for Line 15 was opened on December 28, 2014.[3] The station for Changping line opened on February 4, 2023.[2]
Haidian District, Beijing
China
Changping line
| General information | ||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Location | Qinghua East Road (清华东路) and Xueyuan Road (学院路) / Xueqing Road Haidian District, Beijing China | |||||||||||||||
| Operated by | Beijing Mass Transit Railway Operation Corporation Limited | |||||||||||||||
| Lines | Line 15 Changping line | |||||||||||||||
| Platforms | 4 (2 island platforms) | |||||||||||||||
| Tracks | 4 | |||||||||||||||
| Construction | ||||||||||||||||
| Structure type | Underground | |||||||||||||||
| Accessible | Yes | |||||||||||||||
| History | ||||||||||||||||
| Opened | December 28, 2014 (Line 15) February 4, 2023 (Changping line)[2] | |||||||||||||||
| Services | ||||||||||||||||
| ||||||||||||||||
| ||||||||||||||||
Station layout
The station has underground island platforms for both Line 15 and Changping line.
Exits
There are 7 exits, lettered A1, A2, B, C, D, E and F. Exits C, D and E are accessible via elevators.
Station art
A curved wall inside the transfer channel of this station is decorated with a mural named 'Flowers Like Brocade', and the Changping line station hall and transfer node are decorated with a mural named 'Growth' that embodies 'trees and the people who plant trees'.[4]