MacPherson MRT station

Mass Rapid Transit station in Singapore From Wikipedia, the free encyclopedia

MacPherson MRT station is an underground Mass Rapid Transit (MRT) interchange station on the Downtown Line and Circle Line in Geylang planning area, Singapore, located underneath Paya Lebar Road at the junction with Circuit Link and Ubi Avenue 2.

Location171 Paya Lebar Road, Singapore 409048 (CCL)
10 Circuit Link, Singapore 378956 (DTL)
Coordinates01°19′36″N 103°53′24″E
SystemMass Rapid Transit (MRT) interchange
Quick facts General information, Location ...
MacPherson
CC10DT26
麦波申
மெக்பர்சன்
Exit E of MacPherson station
General information
Location171 Paya Lebar Road, Singapore 409048 (CCL)
10 Circuit Link, Singapore 378956 (DTL)
Coordinates01°19′36″N 103°53′24″E
SystemMass Rapid Transit (MRT) interchange
OwnerLand Transport Authority
OperatorSMRT Trains (Circle Line)
SBS Transit (Downtown Line)
Line
Platforms4 (1 island platform, 2 side platforms)
Tracks4
ConnectionsBus, Taxi
Construction
Structure type
Underground
Platform levels
2
AccessibleYes
Other information
Station codeMPS
History
Opened17 April 2010; 16 years ago (2010-04-17) (Circle Line)
21 October 2017; 8 years ago (2017-10-21) (Downtown Line)
Former namesUbi[1]
Passengers
June 202415,026 per day[2]
Services
Preceding station Mass Rapid Transit Following station
Paya Lebar
Clockwise
Circle Line Tai Seng
Anticlockwise
Paya Lebar
towards Dhoby Ghaut
Circle Line
Tai Seng
Mattar Downtown Line Ubi
towards Expo
Location
MacPherson is located in Singapore Rail central area
MacPherson
MacPherson
Location within Singapore Rail central area
Close

Named after the nearby MacPherson estate, which itself was named after Colonel Ronald MacPherson, the first Colonial Secretary of the Straits Settlements in 1867, this station serves not only the residents of MacPherson estate but also the Ubi industrial estate.

History

Circle Line platform level of MacPherson station.
Downtown Line platform of MacPherson station

Contract 822 for the construction of CCL MacPherson station was awarded to Econ Corporation Ltd - NCC International AB Joint Venture at a contract sum of more than S$300 million.[3] However, in 2005, Econ Corporation later dropped out due to financial difficulties, and LTA had sought to replace the contractors involved due to 'major outstanding works' on the two stations.[4] To facilitate the construction for the CCL station, part of Paya Lebar Road, Circuit Link and Ubi Avenue 2 had to be realigned.[5] In September 2007, Chye Joo Construction won the tender to finish building the MacPherson and Tai Seng MRT stations at a contract sum of S$17.5 million.[6]

The station was opened on 17 April 2010 along with the rest of Stage 1 & 2 of the Circle Line.[7][8]

Downtown Line interchange

During the CCL station's construction, provisions were made for MacPherson station to link with the planned Eastern Region Line, the precursor to Stage 3 of the DTL. Contract 931 for the design and construction of DTL MacPherson station and associated tunnels was awarded to Sato Kogyo (S) Pte Ltd at a sum of S$188 million in April 2011. Construction of the station and the tunnels commenced in the second quarter of that year and completed in 2017.[9]

The station became an interchange with the Downtown Line when Stage 3 of the line opened on 21 October 2017, as announced by the Land Transport Authority (LTA) on 31 May that year.[10]

Art-in-Transit

On the Circle Line, the featured artwork Virtuous Cycle by Kay Kok Chung Oi signifies the symbolic meaning of this station, portraying the congregation of human dynamism and its cerebral energy, channeled and sustained by the ‘machinery’ of the station. The different colours of the arrows signify the public converging upon the MacPherson vicinity while the station is represented by the red rectangles. The station performs the role of a conduit, connecting people to MacPherson, as well as celebrating the continued vibrancy of the MacPherson community itself.[11]

Civil Defence Shelter

MacPherson station is one of eleven stations along the Circle Line designated as Civil Defence (CD) shelters, which will be activated in times of national emergency. Apart from reinforced construction, the stations are designed and equipped with facilities to ensure the shelter environment is tolerable for all users during shelter occupation. These facilities include protective blast doors, decontamination facilities, ventilation systems, power and water supply systems and a dry toilet system.

References

Related Articles

Wikiwand AI