Nanyang Crescent MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region Line in Western Water Catchment, Singapore. The station will be located within the Nanyang Technological University (NTU).

Location75 Nanyang Drive, Singapore 639942
Coordinates01°20′54″N 103°40′51″E
SystemFuture Mass Rapid Transit (MRT) station
Quick facts General information, Location ...
Nanyang Crescent
 JW4 
南洋弯
நன்யாங் க்ரெஸ்ஸன்
Nanyang Crescent station under construction
General information
Location75 Nanyang Drive, Singapore 639942
Coordinates01°20′54″N 103°40′51″E
SystemFuture Mass Rapid Transit (MRT) station
OwnerLand Transport Authority
OperatorSingapore One Rail
Line
Platforms2 (2 side platforms)
Tracks2
ConnectionsBus, Taxi
Construction
Structure type
Elevated
Platform levels
1
ParkingYes
Cycle facilities
Yes
AccessibleYes
Other information
Station codeNYC
History
Opening2029; 3 years' time (2029)
Services
Preceding station Mass Rapid Transit Following station
Nanyang Gateway Jurong Region Line
Future service
Peng Kang Hill
Terminus
Location
Nanyang Crescent is located in Singapore Rail
Nanyang Crescent
Nanyang Crescent
Location within Singapore Rail
Close

History

On 9 May 2018, the Land Transport Authority (LTA) announced that Nanyang Crescent station would be part of the proposed JRL.[1][2] The station will be constructed as part of Phase 3, consisting of 7 stations – a 4 station extension to Jurong Pier from Boon Lay and a 3 station extension to Peng Kang Hill from Tawas. It was expected to be completed in 2028.[3] However, the restrictions on construction due to the COVID-19 pandemic has led to delays, with the completion date pushed to 2029.[4]

The contract for the design and construction of the Nanyang Gateway and Nanyang Crescent stations and 1.4 km (0.87 miles) of associated viaducts – Contract J113[5] – was awarded to Hwa Seng Builder Pte Ltd at S$263 million (US$192.8 million) on 6 April 2021.[6] Construction is scheduled to start in the second quarter of 2021, with expected completion in 2029.[7]

Starting on 31 July 2022, a section of Nanyang Drive had to be temporarily diverted for the station's construction, with two bus stops along the road shifted accordingly. The overhead bridge connecting the Nanyang Technological University (NTU) North Spine and the National Institute of Education (NIE) was demolished on 11 September that year.[8]

Details

Nanyang Crescent station will serve the JRL and will be located between the Nanyang Gateway and Peng Kang Hill stations. The official station code will be JW4.[9] The station will be located in the Nanyang Technological University (NTU), along Nanyang Drive near the junction with Nanyang Walk.[10][11]