Nanyang Gateway MRT station

Future Mass Rapid Transit station in Singapore From Wikipedia, the free encyclopedia

Nanyang Gateway MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region Line in Western Water Catchment, Singapore. The station will be located within the Nanyang Technological University (NTU).

Location18 Nanyang Avenue
Singapore 639957
Coordinates1°21′13″N 103°41′12″E
SystemFuture Mass Rapid Transit (MRT) station
Quick facts General information, Location ...
Nanyang Gateway
JW3
南洋门
நன்யாங் கேட்வே
Nanyang Gateway station under construction
General information
Location18 Nanyang Avenue
Singapore 639957
Coordinates1°21′13″N 103°41′12″E
SystemFuture Mass Rapid Transit (MRT) station
Owned byLand Transport Authority
Line
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeElevated
Platform levels1
ParkingYes
Cycle facilitiesYes
AccessibleYes
History
Opening2029; 3 years' time (2029)
ElectrifiedYes
Services
Preceding station Mass Rapid Transit Following station
Tawas Jurong Region Line
Future service
Nanyang Crescent
Location
Singapore MRT/LRT system map
Singapore MRT/LRT system map
Nanyang Gateway
Nanyang Gateway station in Singapore
Close

History

On 9 May 2018, the Land Transport Authority (LTA) announced that Nanyang Gateway station would be part of the proposed JRL.[1][2] The station will be constructed as part of Phase 3, consisting of 7 stations – a 4 station extension to Jurong Pier from Boon Lay and a 3 station extension to Peng Kang Hill from Tawas. It was expected to be completed in 2028.[3] However, the restrictions on construction due to the COVID-19 pandemic has led to delays, with the completion date pushed to 2029.[4]

The contract for the design and construction of the Nanyang Gateway and Nanyang Crescent stations and 1.4 km (0.87 miles) of associated viaducts – Contract J113[5] – was awarded to Hwa Seng Builder Pte Ltd at S$263 million (US$192.8 million) on 6 April 2021. Construction is scheduled to start in the second quarter of 2021, with expected completion in 2029.[6]

Station details

The station will serve the JRL and will be located between the Tawas and Nanyang Crescent stations. The official station code will be JW3.[7] The station will span over Nanyang Avenue and has four entrances, serving multiple NTU Halls of Residence and Staff Residences.[8]