Porur Junction metro station is an upcoming elevated metro station on the East-West Corridor of the Yellow Line of Chennai Metro in Chennai, India. This metro station will be among the 30 elevated stations of Corridor IV and 12 underground stations along Corridor IV of the Chennai Metro, Poonamallee Bypass–Lighthouse stretch. This station is slated to be commercialized in December 2025.[1][2]

Coordinates13.03587°N 80.15683°E / 13.03587; 80.15683
System
Chennai Metro station
OwnerChennai Metro Rail Limited (CMRL)
Quick facts General information, Coordinates ...

Porur Junction
Porur Junction station, viewed from Arcot road
General information
Coordinates13.03587°N 80.15683°E / 13.03587; 80.15683
System
Chennai Metro station
OwnerChennai Metro Rail Limited (CMRL)
OperatorChennai Metro
LineYellow Line
PlatformsSide platform
Platform-1 → Vadapalani *
Platform-2 → Train Terminates Here
* (Further extension to Lighthouse in the future)
Tracks2
Construction
Structure type
Elevated, Double track
Platform levels
2
AccessibleYes Disabled access
Other information
StatusFinal Stages before Commercial Operations - 95% complete
History
Opening15 July 2026; 57 days ago (15 July 2026) (TBC)
ElectrifiedSingle phase 25 kV, 35 Hz AC through overhead catenary
Services
Preceding station Logo of Chennai Metro Chennai Metro Following station
Porur Bypass Yellow Line
(Operational around June 2026)
Vadapalani
Terminus
Yellow Line
(Operational around Q2 of 2027)
Alapakkam
towards Vadapalani
Yellow Line
(Lighthouse - Around Dec 2027)
Alapakkam
towards Lighthouse
Porur Bypass
towards Parandur Airport
Yellow Line
(Extension in the future)
Location
Close

History

In 2020, Larsen & Toubro (L&T) was awarded the contract for construction of stations from Porur Junction to Kodambakkam Powerhouse with the construction commencing from then.[3] As MGR flyover passes close to this station, steel beams were placed above to connect to Poonamallee.[4] The work on Porur station was almost completed in March 2025 along with the next set of stations from Porur Bypass to Poonamallee Bypass.[5] Trial runs are conducted since June 2025 and the line is set for opening by end of the year.[1][6]

Station layout

Station Layout

Porur Junction track layout (TBC)
to Alapakkam **
P1
P2
Station with two tracks and two side platforms
** Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 1
Eastbound
Towards → Vadapalani *
Next Station: Alapakkam
Platform 2
Westbound
Towards ← Poonamallee Bypass **
Next Station: Porur Bypass
Side platform | Doors will open on the left Disabled access
L2 Note: Further extension to * Lighthouse and ** Parandur Airport in the future