Ragigudda - Silk Board Flyover
Flyover under construction in Bengaluru
From Wikipedia, the free encyclopedia
Ragigudda - Silk Board Flyover is a rail-cum-road flyover in the city of Bengaluru in Karnataka, India.[2] It is the first double decker flyover in Bengaluru, which is was built by the Bangalore Metro Rail Corporation Limited between Central Silk Board and Ragigudda metro stations as part of the Yellow Line (Rashtreeya Vidyalaya Road-Delta Electronics Bommasandra). After completion, it will become the first rail-cum-road flyover in South India, which is expected to be completed by 2026.[3].On 22nd of April 2026 another section of road was open to public on trial basis.[4]
| Ragigudda - Silk Board Flyover | |
|---|---|
Starting point of the Ragigudda - Silk Board Flyover | |
![]() Interactive map of Ragigudda - Silk Board Flyover | |
| Location | |
| Bangalore, India | |
| Coordinates | 12.91690°N 77.59038°E |
| Roads at junction | Marenahalli Road Outer Ring Road 100 Feet Ring Road |
| Construction | |
| Type | Double-Stacked Overpass |
| Lanes | 4 |
| Constructed | by HCC - URC Construction JV |
| Opened | 17 July 2024[1] |
| Maximum height | 31 m (102 ft) |
Overview
The flyover has two levels above ground, with the first level having four lanes for carrying vehicles while the second level carries the metro tracks. The total length of the flyover is 3.2 kilometres long. At 31 metres tall, it is tallest rail-cum-road flyover in South India.[5]
