Ragigudda - Silk Board Flyover

Flyover under construction in Bengaluru From Wikipedia, the free encyclopedia

Ragigudda - Silk Board Flyover is a rail-cum-road flyover in the city of Bengaluru in Karnataka, India.[2] It is the first double decker flyover in Bengaluru, which is was built by the Bangalore Metro Rail Corporation Limited between Central Silk Board and Ragigudda metro stations as part of the Yellow Line (Rashtreeya Vidyalaya Road-Delta Electronics Bommasandra). After completion, it will become the first rail-cum-road flyover in South India, which is expected to be completed by 2026.[3].On 22nd of April 2026 another section of road was open to public on trial basis.[4]

Coordinates12.91690°N 77.59038°E / 12.91690; 77.59038
Roads at
junction
Marenahalli Road
Outer Ring Road
100 Feet Ring Road
TypeDouble-Stacked Overpass
Lanes4
Quick facts Location, Coordinates ...
Ragigudda - Silk Board Flyover
Starting point of the Ragigudda - Silk Board Flyover
Interactive map of Ragigudda - Silk Board Flyover
Location
Bangalore, India
Coordinates12.91690°N 77.59038°E / 12.91690; 77.59038
Roads at
junction
Marenahalli Road
Outer Ring Road
100 Feet Ring Road
Construction
TypeDouble-Stacked Overpass
Lanes4
Constructedby HCC - URC Construction JV
Opened17 July 2024; 21 months ago (17 July 2024)[1]
Maximum
height
31 m (102 ft)
Close

Overview

The flyover has two levels above ground, with the first level having four lanes for carrying vehicles while the second level carries the metro tracks. The total length of the flyover is 3.2 kilometres long. At 31 metres tall, it is tallest rail-cum-road flyover in South India.[5]

References

Related Articles

Wikiwand AI