Ragigudda metro station

From Wikipedia, the free encyclopedia

LocationMarenahalli Road, 9th Block, Jayanagar, Bengaluru, Karnataka 560041
Coordinates12°55′01″N 77°35′18″E / 12.9170°N 77.5884°E / 12.9170; 77.5884
System
Namma Metro station
Ragigudda
Station building, August 2025
General information
LocationMarenahalli Road, 9th Block, Jayanagar, Bengaluru, Karnataka 560041
Coordinates12°55′01″N 77°35′18″E / 12.9170°N 77.5884°E / 12.9170; 77.5884
System
Namma Metro station
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
LineYellow Line
PlatformsSide platform
Platform-1 → Rashtreeya Vidyalaya Road
Platform-2 → Delta Electronics Bommasandra
Tracks2
Construction
Structure typeElevated
Platform levels2
ParkingTwo-Wheeler Parking only
AccessibleYes Disabled access
ArchitectHCC - URC Construction JV
Other information
StatusStaffed
Station codeRGDT
History
Opened10 August 2025; 5 months ago (10 August 2025)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Rashtreeya Vidyalaya Road
Terminus
Yellow Line Jayadeva Hospital
Location

Ragigudda is an elevated metro station on the north–south corridor of the Yellow Line of Namma Metro in Bengaluru, India. Located in between Jayanagar 9th Block & J.P. Nagar 2nd & 3rd Phase, this metro station is named after the Ragigudda Anjaneya Temple.

Inauguration of Yellow line at Ragigudda metro station, on Aug 10, 2025

In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Ragigudda metro station along the 6.340 km Reach 5 – Package 3 section (Central Silk Board - Rashtreeya Vidyalaya Road) of the 18.825 km Yellow Line of Namma Metro. On 16 May 2017, HCC-URC Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[1] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.

The Yellow Line began operations from 10 August 2025 and has been officially inaugurated by Prime Minister Narendra Modi, with four trainsets which are ready for operations after arriving from Titagarh Rail Systems in Kolkata.[2][3][4][5][6][7][8] The opening was delayed from May 2025 as announced by the Namma Metro Managing Director, Maheshwar Rao.[9][10][11]

Station layout

Ragigudda track layout
Station with two tracks and two side platforms
**      - Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Eastbound
Towards → Delta Electronics Bommasandra
Next Station: Jayadeva Hospital
Change at the next station for Pink Line
Platform 1
Westbound
Towards ← Rashtreeya Vidyalaya Road
Change at the next station for Green Line
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits

There are two entry/exit points – A and B. Commuters can use either of the points for their travel.

  • Entry/Exit point A: Towards JP Nagar side
  • Entry/Exit point B: Towards Jayanagar 9th Block side
    • Wheelchair accessibility has been provided for both entry/exit points A and B

See also

References

Related Articles

Wikiwand AI