Red Line (Namma Metro)

Proposed line of Bengaluru's Namma Metro From Wikipedia, the free encyclopedia

The Red Line or Hebbal-Sarjapura Line is a proposed metro rail line[3] that will become part of Namma Metro's network in the city of Bangalore, Karnataka, India. Phase-3A of Namma Metro has been planned to become operational around April 2033.[4][5][6][7]

Other names
  • Third North–South Corridor
  • Line 8
  • Hebbala–Sarjapura Line
Native nameKeṁpu mārga
StatusUnder Construction
OwnerBangalore Metro Rail Corporation Limited (BMRCL)
Quick facts Overview, Other names ...
Red Line
Overview
Other names
  • Third North–South Corridor
  • Line 8
  • Hebbala–Sarjapura Line
Native nameKeṁpu mārga
StatusUnder Construction
OwnerBangalore Metro Rail Corporation Limited (BMRCL)
LocaleBangalore, Karnataka, India
Termini
Connecting linesOperational (1):
Purple Line
Upcoming (3):
Blue Line Orange Line Pink Line
Proposed (1):
Inner Ring Line
Stations28
Websitebmrc.co.in
Service
TypeMetro
SystemNamma Metro
DepotSarjapur Depot [1]
History
Planned openingDecember 2030; 4 years' time (December 2030) (TBC) [2]
Technical
Line length37 km (23 mi)
Number of tracks2
Character(TBC)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Red Line map (TBC)

Hebbala
Indian Railways Towards
Left arrow Yesvantpur Jn or SMVT Bengaluru UpperRight arrow
Ganga Nagar
Mekhri Circle
Guttahalli Palace
Bengaluru Golf Course
Basaveshwara Circle
KR Circle
Town Hall
Shanthinagar
NIMHANS
Dairy Circle
Dairy Circle on
Pink Line
Under construction
Koramangala II Block
Koramangala III Block
Jakkasandra
Agara
** Blue Line U/C
Ibbaluru
Bellandur Gate
Kaikondrahalli
Doddakannelli
Indian Railways Towards
Left arrow Hosur or Baiyyappanahalli Right arrow
Carmelaram
Ambedkar Nagar
Kodathi Gate
Muthanalluru Cross
Dommasandra
Sompura
Kada Agrahara Road
Mainline rail interchange Sarjapura Depot (TBC)
Sarjapura
Close

As per latest news updates, the Karnataka Cabinet had approved the Phase 3A of this metro line, linking Sarjapur in southeastern Bengaluru with Hebbal in the north on December 6, 2024. The approval from the Union Cabinet is awaited, as the Centre holds a 50% equity stake in Namma Metro.[8][9]

History

Proposal

The Hebbal–Sarjapur corridor was first identified as the Carmelaram–Yelahanka line in the Comprehensive Mobility Plan (CMP) 2020, and was subsequently considered for inclusion in the Namma Metro Phase 3 Detailed Project Report (DPR). However, when the final Phase 3 DPR was approved by the Karnataka Government in 2022, the corridor was omitted.[10][11] The decision was met with widespread criticism from residents and commuters along the rapidly developing Sarjapur Road corridor, who argued that the area continued to suffer from severe traffic congestion despite being one of Bengaluru's fastest-growing residential and IT hubs.[12][13]

In response to growing public demand, the Karnataka Government announced the Hebbal–Sarjapur corridor as a separate Phase 3A project.[14] The proposal envisioned a 37 km metro line connecting Hebbal in north Bengaluru with Sarjapur in the southeast at an estimated cost of ₹15,000 crore. The corridor was planned to serve major localities including Dairy Circle, Koramangala, Agara, Bellandur, and Sarjapur Road.[15] The initial proposal comprised 29 stations, of which 15 were planned to be underground, with approximately 16.8 km of the alignment passing below ground.[16][17]

Initial DPR

BMRCL subsequently invited bids for the preparation of the Detailed Project Report, which was submitted to the Karnataka Government in June 2024.[18][19] The State Cabinet approved the DPR on 6 December 2024, following which it was forwarded to the Government of India for statutory approval.[20] Compared to the original proposal, the DPR omitted the planned Sulikunte and Sudduguntepalya, stations while introducing a new station at Kada Agrahara Road. Several stations were also renamed, and the number of underground stations was reduced from 15 to 11.[21] The finalized alignment measured 36.58 km, with an estimated project cost of ₹28,405 crore, making it the most expensive Namma Metro corridor on a per-kilometre basis.[22][23]

The Government of India subsequently returned the DPR, citing concerns over the project's high construction cost, which was estimated at ₹776.3 crore per kilometre.[24] In response, the Karnataka Government appointed the French engineering consultancy Systra to revise the project and identify cost-saving measures.[25]

Revisions and Tenders

A revised DPR was submitted in February 2026, introducing several design modifications. The stations at Veterinary College and Kodati Gate were removed, while a new Sarjapur Terminal station was added.[26][27] The underground section was shortened by approximately 160 metres, although the overall corridor length increased from 36.58 km to 37.80 km due to alignment refinements. Underground station dimensions were also reduced from 200 × 27 metres to 170 × 21.5 metres, and interchange station layouts were redesigned to further reduce construction costs.[28] These changes lowered the estimated project cost to ₹25,999 crore, after which the revised DPR was resubmitted to the Central Government for approval. As a result of the revisions and approval process, the anticipated opening of the corridor was deferred from 2031 to April 2033.[29]

Funding

Estimated at Rs 16,543 crore, including land acquisition charges, the 37-km line is outlined in the Comprehensive Mobility Plan 2020. This proposed metro line is expected to ease travel for public commuting to and from tech zones.[30] The alignment involves an elevated corridor near the IT corridor in Sarjapur, transitioning underground at Koramangala, traversing the central business district through tunnels, and emerging on Ballari Road with elevated stations at Ganganagar and Hebbal.

Tendering

More information Pre-Construction Activity, Tendering ...
Red Line
Pre-Construction Activity
Tendering Section Activity Successful Bid /Cost Contractor Award
Phase-3A/GTI/P1/2025/138 Sarjapur to Carmelaram Geo-Technical Investigation 1.6 crore (US$170,000) Becquerel Industries 13 Feb 2026
Phase-3A/GTI/P2/2025/139 Carmelaram to Koramangala 3rd Block Geo-Technical Investigation 1.26 crore (US$130,000) Becquerel Industries 13 Feb 2026
Phase-3A/GTI/P3/2025/140 Koramangala 3rd Block to KR Circle Geo-Technical Investigation 1.06 crore (US$110,000) Goma Engineering 13 Feb 2026
Phase-3A/GTI/P4/2025/141 KR Circle to Hebbal Geo-Technical Investigation 1.32 crore (US$140,000) RITES 13 Feb 2026
Total 5.24 crore (US$540,000)
Close

Stations

The Red Line (Hebbal-Sarjapura Line) is planned to have 28 stations.[30][31][32]

Interchanges

Passenger interchange facilities, connecting to other metro and railway lines, will be provided at the following stations:

More information #, Station name ...
Red Line
# Station name Connections Station layout
(TBC)[33]
EnglishKannada
1 Hebbala ಹೆಬ್ಬಾಳ Blue Line (Under Construction)
Orange Line (Under Construction)
Elevated
2 Ganganagar ಗಂಗಾನಗರ Elevated
3 Mekhri Circle ಮೇಖ್ರಿ ಸರ್ಕಲ್ Underground
4 Palace Guttahalli ಗುಟ್ಟಹಳ್ಳಿ ಅರಮನೆ Bangalore Palace Underground
5 Bengaluru Golf Course ಬೆಂಗಳೂರು ಗಾಲ್ಫ್ ಕೋರ್ಸ್ Underground
6 Basaveshwara Circle ಬಸವೇಶ್ವರ ವೃತ್ತ Underground
7 KR Circleಕೆ.ಆರ್. ವೃತ್ತ Purple Line Underground
8 Town Hall ಟೌನ್ ಹಾಲ್ Underground
9 Shanthinagara ಶಾಂತಿನಗರ Bus interchange Shanthinagar Bus TTMC Underground
10 NIMHANS ನಿಮ್ಹಾನ್ಸ್ Underground
11 Dairy Circle ಡೈರಿ ಸರ್ಕಲ್ Pink Line (Under Construction) Underground
12 Koramangala II Block ಕೋರಮಂಗಲ II ಬ್ಲಾಕ್ Underground
13 Koramangala III Block ಕೋರಮಂಗಲ III ಬ್ಲಾಕ್ Elevated
14 Jakkasandra ಜಕ್ಕಸಂದ್ರ Elevated
15 Agara ಅಗರ Blue Line (Under Construction) Elevated
16 Ibbaluru ಇಬ್ಬಲೂರು Blue Line (Under Construction) Elevated
17 Bellanduru Gate ಬೆಳ್ಳಂದೂರು ಗೇಟ್ Elevated
18 Kaikondrahalli ಕೈಕೊಂಡ್ರಹಳ್ಳಿ Elevated
19 Doddakannelli ದೊಡ್ಡಕನ್ನೆಲ್ಲಿ Elevated
20 Carmelaram ಕಾರ್ಮೆಲರಾಮ್ Carmelaram Railway Station Elevated
21 Ambedkar Nagara ಅಂಬೇಡ್ಕರ್ ನಗರ Elevated
22 Muthanalluru Cross ಮುತ್ತನಲ್ಲೂರು ಕ್ರಾಸ್ Elevated
23 Dommasandra ದೊಮ್ಮಸಂದ್ರ Elevated
24 Sompura ಸೋಂಪುರ Elevated
25 Kada Agrahara Road ಕಡ ಅಗ್ರಹಾರ ರಸ್ತೆ Elevated
26 Sarjapura ಸರ್ಜಾಪುರ Elevated
27 Sarjapura Terminal Station ಸರ್ಜಾಪುರ ಟರ್ಮಿನಲ್ ನಿಲ್ದಾಣ Elevated
Close

See also

References

Related Articles

Wikiwand AI