Sagardighi Thermal Power Station

Power station in West Bengal, India From Wikipedia, the free encyclopedia

Sagardighi Thermal Power Station is a thermal power plant located in Manigram, 13 km north of Sagardighi in West Bengal, India. It is operated by the West Bengal Power Development Corporation Limited.

Official nameWBPDCL
CountryIndia
Coordinates24°22′06″N 88°06′04″E
Quick facts Official name, Country ...
Sagardighi Thermal Power Station
Location of the Sagardighi Thermal Power Station in West Bengal
Official nameWBPDCL
CountryIndia
LocationSagardighi, West Bengal
Coordinates24°22′06″N 88°06′04″E
StatusOperational
Commission dateUnit 1: 7 September 2008
Unit 2: 6 November 2008
Unit 3: December 2015
Unit 4: January 2017
Unit 5: June 2025
OperatorWest Bengal Power Development Corporation Limited
Thermal power station
Primary fuelBituminous coal
Tertiary fuelOil
Power generation
Units operational2X300 MW; 2x500 MW; 1x660 MW
Nameplate capacity2260 MW
External links
Website
CommonsRelated media on Commons
Close

Geography

Location

The site is about 1 kilometre (0.62 mi) from Manigram railway station of the Bandel-Barhawara section of Eastern Railway. It is on the western bank of the Bhagirathi.[1][2]

History

The foundation of the Sagardighi Thermal Power Plant was laid by former Chief Minister of West Bengal Buddhadeb Bhattacharya in 2008.

The first two units of 300 MW each were synchronized to the electrical grid on 21.12.2007 and 13.08.2008. The second two units of 500 MW each were synchronized on 31.03.2015 and 15.10.2015. A solar power plant is planned for the same location. The plant provides power to Sagardighi, Subhasgram, Farakka, Baharampur, Gokarna, and Jeerat.

The project was developed by Dongfang Electric Corporation, at a cost of Rs. 27.50 billion.[3] Total power generation is currently 1600 MW. Another 660 MW is planned for which the contract has been awarded to BHEL at a cost of around Rs. 3500[4]

Operation

Coal is provided by Captive Coal, Pachawar North and East of Damagaria Coal Mines. Raw water is primarily obtained from the Bhagirathi River and fed into a raw water pond inside the plant.

The power plant was awarded 5th best power generating plant in India by the Central Electricity Authority in 2022-2023.

Capacity

The station has a planned capacity of 1600 MW: 2 units of 300 MW each and 2 units of 500 MW each.

More information Unit number, Installed capacity (MW) ...
Unit numberInstalled capacity
(MW)
Date of commissioningStatus
13002008 SeptemberCommissioned
23002008 NovemberCommissioned
35002015 DecemberCommissioned [5]
45002017 JanuaryCommissioned [6]
56602025 JuneCommissioned [https://timesofindia.indiatimes.com/city/kolkata/sagardighi-supercritical-thermal-power-unit-to-start-ops-from-dec-10/articleshow/125774756.cms]