Wikiwand AI

Sestao (Bilbao Metro)

Rapid transit station in Sestao, Basque Country, Spain From Wikipedia, the free encyclopedia

Sestao is a station on Line 2 of the Bilbao Metro. It is located in central Sestao, near the city hall and the Santa María church. It opened on 8 January 2005 and it acted as northern terminus for line 2 until the opening of the Portugalete extension in 2007.[3][4]

LocationKasko Plaza
48910 Sestao[1]
Spain
Coordinates43°18′34″N 3°00′26″W
Ownedby
Line Line 2
Quick facts General information, Location ...
Sestao
Entrance to the station
General information
LocationKasko Plaza
48910 Sestao[1]
Spain
Coordinates43°18′34″N 3°00′26″W
Owned by
Line Line 2
Platforms2 side platforms
Tracks2
Construction
Structure type
Underground
Platform levels
1
ParkingNo
AccessibleYes
Other information
Fare zone  Zone 2  
History
Opened8 January 2005
Passengers
20211,799,857[2]
Services
Preceding station Metro Bilbao Following station
Abatxolo
towards Kabiezes
Line 2 Urbinaga
towards Basauri
Location
Close

There is a station on the Cercanías Bilbao commuter railway network with the same name, but the two stations are not connected.

Station layout

Sestao station follows the typical cavern-shaped layout of most underground Metro Bilbao stations designed by Norman Foster, with the main hall located directly above the rail tracks.

Access

  • Kasko Plaza, city hall (Kasko exit)
  • 14, Gran Vía de José Antonio Agirre y Lekube (La Salle exit, closed during night time services)
  • Camino Txikito Rd. / Doctor Fleming St. (Camino Txikito Bidea exit, closed during night time services)
  • 2, Gran Vía de José Antonio Agirre y Lekube (Kasko exit)

Services

The station is served by Line 2 from Basauri to Kabiezes. The station is also served by Bizkaibus regional bus services.

Future

In 2022, it was announced that a tunnel will connect both banks of the Ibaizabal-Nervión estuary in 2028, incorporating a shuttle train that will connect the Sestao and Areeta (Line 1) stations in four minutes.[5] Work on the tunnel is scheduled to begin in the summer of 2024, with a planned investment of 450 million euros.[6]

References

Related Articles

Timelines

Top Qs

Fact Checks