Shanghai Metro AC05

From Wikipedia, the free encyclopedia

Stock typeClass A EMU
In service31 December 2005-present
ManufacturerSiemens Mobility and CSR Zhuzhou Locomotive
Shanghai Metro 04A01
AC05
04A01 departing from West Yan'an Road station in 2024
Stock typeClass A EMU
In service31 December 2005-present
ManufacturerSiemens Mobility and CSR Zhuzhou Locomotive
Built atVienna, Austria
Zhuzhou, China
Family nameModular Metro
Constructed2004-2007
Entered service31 December 2005
Number built168
Number in service168
FormationTc-Mp-M+M-Mp-Tc
Fleet numbers040011-041681
Capacity310 per car
OperatorsShentong Metro Group
DepotsPuhuitang Depot
Lines served 3   4 
Specifications
Car body constructionAluminum alloy
Train length139.98 m (459 ft 3 in)
Car length23.54 m (77 ft 3 in)
Width3 m (9 ft 10 in)
Height3.8 m (12 ft 6 in)
DoorsElectric doors
Maximum speed80 km/h (50 mph)
Traction systemSiemens Mobility G1500 D1100/400 M5-1 IGBT-VVVF
Traction motorsSiemens Mobility 1TB2010-1GA02 3-phases AC induction motors
AccelerationMaximum 3.6 km/(h⋅s) (2.237 mph/s)
Deceleration3.6 km/(h⋅s) (2.237 mph/s) (service)
4.7 km/(h⋅s) (2.920 mph/s) (emergency)
Electric system(s)1,500 V DC
Current collectionSingle-arm Pantograph
BogiesSiemens Mobility SF2100[1]
Safety system(s)Current: Alstom SACEM (enhanced fixed-block, ATO/GoA2)
Future: CASCO Tranavi Qiji (TACS, DTO/GoA3)
Track gauge4 ft 8+12 in (1,435 mm)

The 04A01 (formerly known as AC05) is an electric multiple unit currently used on Line 4 of Shanghai Metro. They are developed by Siemens Mobility and built by CSR Zhuzhou Locomotive. AC05s entered service on 31 December 2005.

Between July 2006 and September 2009, eight AC05 trains were temporarily assigned to Line 2 service, due to the shortage of AC02 trains, the delayed delivery of AC08 trains and the opening of Line 2 extension.[2] In 2014, AC05 trains renamed 04A01 trains.[3]

The AC05 trains have livery in purple and white, with the number "4" on every car, to help passengers distinguish the AC03 trains at Line 3 section.

In March 2002, Siemens Mobility and CSR Zhuzhou Locomotive awarded the contract to build AC05 trains for the Pearl line Phase 2 project. The first train built by CSR Zhuzhou Locomotive was completed on 18 December 2004.[4][5]

Signaling upgrade

See also

References

Related Articles

Wikiwand AI