Sofia Metro

Rapid transit system in Bulgaria From Wikipedia, the free encyclopedia

The Sofia Metro (Bulgarian: Софийски метрополитен, romanized: Sofiyski Metropoliten, also colloquially called Bulgarian: Софийско метро, romanized: Sofiysko Metro) is the rapid transit network servicing the Bulgarian capital city Sofia. It is the only metro in Bulgaria. It began operation on 28 January 1998.[3] As of 2026, the Sofia Metro consists of four interconnected lines, serving 50 stations, with a total route length of 52.0 kilometres (32.3 mi)[3][7][8][4] and also being among the top 15 of the most extensive European metro systems, ranking 9th as of 2026. The Metro links the densely populated districts of LyulinMladost (M1 line – Red) and NadezhdaLozenets (M2 line – Blue), and serves the Vasil Levski Sofia Airport.[9][10] A single ride ticket is 0.80 EUR.[11]

NativenameСофийско метро
OwnerCity of Sofia
LocaleSofia, Bulgaria
TransittypeRapid transit
Quick facts Overview, Native name ...
Sofia Metro
Krasno Selo Metro Station - now "Tsar Boris III", 14 August 2026
Krasno Selo Metro Station - now "Tsar Boris III"[2], 14 August 2026
Overview
Native nameСофийско метро
OwnerCity of Sofia
LocaleSofia, Bulgaria
Transit typeRapid transit
Number of lines
4[3]
Number of stations
50[3][4]
7 under construction
Daily ridership
516 000
Annual ridership
123 million[5] (2024)
Chief executive
Nikolai Naidenov
Websitewww.metropolitan.bg
Operation
Began operation
28 January 1998; 28 years ago (1998-01-28)[3]
OperatorMetropoliten JSC
Number of vehicles
272
Technical
System length55.0 km (34.2 mi)[3][4]
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification825 V DC from third rail (M1/M2/M4 lines)
1,500 V DC from overhead catenary (M3 line)
Average speed39 km/h (24 mph)[6]
Top speed90 km/h (56 mph)[6]
System map

Close

History

Planned since the 1960s, construction of the metro started in the 80s with the demolition of a significant number of buildings. At the beginning of the 90s, construction stopped due to a lack of funds and the complexity of the construction work. Being one of the oldest cities in Europe, Sofia contains many historical layers underneath its central areas. Evidence of antiquity can be clearly seen at the Serdika Station, which exhibits a wealth of unearthed Thracian and Roman ruins. During the construction of the enormous complex of the National Palace of Culture, two stations forming part of the M2 line and their connecting tunnels were built.

The construction of the system began from the route that sees the highest volume of passenger traffic, reaching 38,000 at rush hour.[12]

Lines

Due to an increased population, there are a large number of passengers heading toward the city center during weekday mornings, and away from the city centre in the weekday evenings. The necessity of efficient public transport in the direction of the largest passenger flows, transport, and Sofia's environmental problems precipitated the start of the construction of the Sofia Metro. Following the ratification of a technical and economic report on the metro by the Council of Ministers of Bulgaria, and the subsequently approved General City Plan, the general scheme for the development of the lines should consist of three diameters with extensions in the periphery, with a total length of 66.7 kilometres (41.4 mi), 71 metro stations, and a 1.2 million daily passenger capacity at the final stage of implementation.[13]

System

More information Line, Icon ...
Line Icon Opened Current Under construction Planned
Length
km (mi)
Stations Length
km (mi)
Stations Length
km (mi)
Stations
M1 28/01/1998 17.6 (10.9) 16 0 (0.0) 0 19.3 (12.0) 20
M2 31/08/2012 11.7 (7.3) 13 0 (0.0) 1 14.5 (9.0) 16
M3 26/08/2020 14.2 (8.8) 15 0 (0.0) 0 14.2 (8.8) 15
M4 02/04/2015 (as line M2)
26/08/2020 (separated from M2)
23.0 (14.3) 20 0 (0.0) 1 22.1 (13.7) 20
M5 Future 0 (0.0) 0 0 (0.0) 0 16.0 (9.9) 16
M6 Future 0 (0.0) 0 5.5 (3.4) 6 16.0 (9.9) 16
Total 49.0 (30.4) 50 8.3 (5.2) 7 66.7 (41.4) 71
Close

M1 line (Red)

More information Detailed track map ...
M1 line
All stations are wheelchair accessible
4 To Obelya
Obelya Depot
Slivnitsa
Bus interchange
Lyulin
Tram interchange
Zapaden Park
Tram interchange
Suhodolska River
Vardar
Tram interchange
Konstantin Velichkov
Tram interchange
Opalchenska
Bus interchange
SerdikaTram interchangeSerdika II Metro Station2
SU St. Kliment OhridskiBus interchangeOrlov Most Metro Station3
Vasil Levski Stadium
Tram interchange
Joliot-Curie
Novachitsa River
G.M.Dimitrov
Bus interchange
Musagenitsa
Vartopo River
Mladost 1
Bus interchange
4 To Sofia Airport
Aleksandar Malinov
Aleksandar
Teodorov - Balan
Banishka River
Business Park Sofia
Mladost 6
Simeonovo
Station names in italics
are not confirmed.
Detailed track map
Down arrow 14 Up arrow
to Depot
 
↓Opened 1998↓
0'
Slivnitsa
2'
Lyulin
4'
Zapaden Park
Suhodolska
National Rail
to Pernik-Kulata/Kyustendil
7'
Vardar
9'
Konstantin Velichkov
 
↓Opened 1999↓
11'
Opalchenska
 
↓Opened 2000↓
13'
Serdika Bulbank parking
Serdika II
2
 
↓Opened 2009↓
15'
Orlov Most
3
17'
Vasil Levski Stadium Stadium parking
21'
Joliot-Curie Interpred parking
WTC
Novachitsa
23'
G.M.Dimitrov
24'
Musagenitsa
Vartopo
26'
Mladost 1
 
↓Opened 2012↓
 
29'
Mladost 3
31'
Parking
 
↓Opened 2015↓
33'
Druzhba
36'
Iskarsko shose Train station parking Mainline rail interchange
National Rail
to Ihtiman/Karlovo
38'
Sofiyska Sveta gora
40'
Sofia Airport Airport parking Sofia Airport
Terminal 2
Airport branch end
 
↓Opened 2015↓
 
28'
Aleksandar Malinov
30'
Banishka
32'
Business Park Sofia Parking
Mladost branch end
Close

The first 6.5 kilometres (4.0 mi) long section of M1 line consisting of five stations linking Slivnitsa Boulevard through Lyulin and K. Velichkov Boulevard was inaugurated on 28 January 1998. Opalchenska station entered into service on 17 September 1999 and Serdika station situated on St Nedelya Square followed on 31 October 2000, extending the total system length to 8.1 kilometres (5.0 mi). The operational section of the line was further extended with a 1.8 kilometres (1.1 mi) long section, reaching Obelya housing estate in April 2003.

The extension of M1 line continued in 2005 with the start of the construction of 4.8 kilometres (3.0 mi) of tunnels and three stations linking St Nedelya Square and the Interped World Trade Center in Izgrev (station Frédéric Joliot-Curie). 2006 saw the start of the construction of another section of the same line (consisting of 3.2 kilometres (2.0 mi) of tunnels and three stations) linking Izgrev and Mladost I housing estate. The completion of the first three stations was projected for the autumn of 2007, however as a result of various delays it was the second section from the first line (Vasil Levski stadium – Mladost 1) that first entered into service on 8 May 2009, operating for a brief period of time separately from the north-west portion of the line. The remaining section between Serdika and Vasil Levski stadium station finally entered into service on 7 September 2009[14] establishing an uninterrupted link between Obelya and Mladost 1 stations.

The construction of the section from Mladost I to Business Park Sofia station (2.62 kilometres (1.63 mi), with three new underground stations) began on 25 April 2013, and was completed on 8 May 2015.[8][15] It cost 43,852,320 EUR, VAT exclusive, and serves the majority of the second most densely populated area in Sofia.[16][17] Part of the sections of "Sofia Airport" - "Iskarsko Shose" and, Ovcha kupel" -, Krasno selo" are not underground.

Struma and Tsaritsa Yoanna stations are a planned extension of M1 line, west of Lyulin station. Their construction will start in 2027-2028, and when completed, M1 split from the M4 after Lyulin station. M4 will continue to serve Slivnitsa and Pancho Vladigerov stations.

More information Station, Image ...
StationImageIn service since Exits IntermodalityLocation
Dobrinova skala
Добринова скала
planned Near Lyulin III housing estate, on Sofia Ring Road[18]
Tsaritsa Yoanna
Царица Йоанна
planned Near Lyulin II housing estate[18]
Slivnitsa
Сливница
28 January 1998 4
first station of the shared section with M4
Slivnitsa Blvd and Pancho Vladigerov Blvd
Lyulin
Люлин
Tsaritsa Yoanna Blvd in Lyulin
Zapaden Park
Западен парк
8 Tsaritsa Yoanna Blvd and Dr. Petar Dertliev Blvd
Vardar
Вардар
6 Tsaritsa Yoanna Blvd and Vardar Blvd
Konstantin Velichkov
Константин Величков
3 Todor Aleksandrov Blvd and Konstantin Velichkov Blvd
Opalchenska
Опълченска
17 September 1999 6 Todor Aleksandrov Blvd and Opalchenska St
Serdica
Сердика
31 October 2000 12 Todor Aleksandrov Blvd and Knyaginya Maria Luisa Blvd
Sofia University Sveti Kliment Ohridski
СУ „Св. Климент Охридски“
7 September 2009 13 Tsar Osvoboditel Blvd in front of Sofia University
Vasil Levski Stadium
Стадион „Васил Левски“
8 May 2009 2 Northeastern tip of Borisova Gradina Park, near Vasil Levski National Stadium
Frédéric Joliot-Curie
Фр. Жолио Кюри
Yug Bus Station Dragan Tsankov Blvd in Iztok
G. M. Dimitrov
Г. М. Димитров
4 Dr. Georgi Mihov Dimitrov Blvd and Dragan Tsankov Blvd
Musagenitsa
Мусагеница
1 Western end of Prof. Marko Semov Blvd bridge
Mladost I
Младост I
5
last station of the shared section with M4
Jerusalem St and Andrey Sakharov Blvd
Aleksandar Malinov
Александър Малинов
8 May 2015 6 Aleksandrov Malinov Blvd and Andrey Lyapchev Blvd in Mladost II/III
Akad. Aleksandar Teodorov-Balan
Акад. Александър Теодоров-Балан
Aleksandrov Malinov Blvd and Dr. Atanas Moskov St in Mladost II/III
Business Park Sofia
Бизнес Парк София
4 Park and ride facilityAleksandar Malinov Blvd, adjacent to Business Park Sofia in Mladost IV
Close

M2 and M4 lines (Blue/Yellow)

More information Detailed track map ...
M2 and M4 lines
All stations are wheelchair accessible
Down arrow cont. as 4
Down arrow cont. as 2
Mainline rail interchange
Pancho Vladigerov
(under construction)
Lomsko shose
1 Slivnitsa
Beli Dunav
Lyulin
Nadezhda
Zapaden Park
Han Kubrat
Vardar
Knyaginya Maria Luiza
Konstantin Velichkov
Central Railway Mainline rail interchange
Opalchenska
Lavov most
Serdika
Serdika II
3NDK II Metro StationNDK
SU St. Kliment OhridskiOrlov Most Metro Station3
European Union
Vasil Levski Stadium
James Bourchier
Joliot-Curie
Vitosha
G.M.Dimitrov
2 To Dragalevtsi
Musagenitsa
Mladost 1
1 To Business park
Mladost 3
Inter Expo Center –
Tsarigradsko shose
Druzhba
Iskarsko shose Mainline rail interchange
Sofiyska Sveta gora
Sofia Airport Sofia Airport
Station names in italics
are not confirmed.
Detailed track map
Line end
-8'
Vitosha Paradise Mall parking
 
↑Opened 2016↑
-6'
James Bourchier Parking
-4'
European Union CCS Mall parking
built 1981
opened 2012
-2'
NDK NDK parking
built 1981
opened 2012
NDK II
3
 
Serdika Bulbank parking
1 and 4
0'
Serdika II
2'
Lavov most
3'
Central Railway Station
Parking Sofia Central Station Central Bus Station Sofia
5'
Knyaginya Maria Luiza
BDŽ National Rail
to Pernik-Kulata/Kyustendil
BDŽ National Rail
to Dragoman/Radomir/Bankya
Future extension
M5 Ilyantsi branch
Lev Tolstoy
Svoboda
Iliyansko shose
Ilyantsi Parking
Ilyantsi branch end
7'
Han Kubrat
Suhodolska
9'
Nadezhda
11'
Beli Dunav Parking
13'
Lomsko shose
↑Opened 2012↑
 
15'
Obelya Open-air parking Public buses in Sofia
Kakach
Pancho Vladigerov Mainline rail interchange
(under construction)
National Rail
to Dragoman/Radomir/Bankya
 
↑Opened 2003↑
Down arrow RED line
to Depot
 
↓Opened 1998↓
-13'
Slivnitsa
-11'
Lyulin
-8'
Zapaden Park
Suhodolska
National Rail
to Pernik-Kulata/Kyustendil
-6'
Vardar
-4'
Konstantin Velichkov
 
↓Opened 1999↓
-2'
Opalchenska
 
↓Opened 2000↓
0'
Serdika Bulbank parking
Serdika II
2
 
↓Opened 2009↓
3'
Orlov Most
3
5'
Vasil Levski Stadium Stadium parking
8'
Joliot-Curie Interpred parking
WTC
Novachitsa
10'
G.M.Dimitrov
12'
Musagenitsa
Darvenishka
14'
Mladost 1
1 to Business Park
 
↓Opened 2015↓
 
16'
Aleksandar Malinov
18'
Banishka
20'
Business Park Sofia Parking
Mladost branch end
 
↓Opened 2012↓
 
16'
Mladost 3
18'
Parking
 
↓Opened 2015↓
20'
Druzhba
23'
Iskarsko shose Train station parking Mainline rail interchange
National Rail
to Ihtiman/Karlovo
25'
Sofiyska Sveta gora
27'
Sofia Airport Airport parking Sofia Airport
Terminal 2
Airport branch end
Close

The second and fourth lines of the Sofia Metro links the districts of Obelya, Nadezhda, the city centre and Lozenets to the south of the city.[19] Half of the construction cost was covered by the European Union, with the remaining part funded by the state and city budgets.[19] Construction of the 6.4 km (4.0 mi) section between Nadezhda interchange and Lozenets district via Central railway station and the National Palace of Culture started on 14 December 2008. Work on the section between Obelya residential District and Nadezhda started in February 2010. Both sections of the line entered into service on 31 August 2012.[19]

NDK and European Union stations and their connecting tunnels were partly completed during the construction of the National Palace of Culture and the redevelopment of the surrounding area in the late 1970s and early 1980s.

The construction of Mladost 3 and Inter Expo Center – Tsarigradsko shose stations began on 15 February 2009 and was completed on 25 April 2012. The further extension to Sofia Airport comprising two underground and two overground stations and a length of 4.968 kilometres (3.087 mi) began in 2013,[15][20][21][22] and was completed on 2 April 2015 at the cost of 69,923,066 EUR, VAT exclusive.[9][10] This extension was briefly operated as a branch of M1 line, but was soon[when?] transferred to M2 line, moving that line's terminus from Obelya to Sofia Airport.

On 20 July 2016, the line was extended southward with 1.3 km (0.81 mi) and one station, Vitosha, located at Hladilnika neighbourhood.[4] The construction took 2 years.

Provisions have been made for the construction of future branch to Iliyantsi, starting from the existing junction located between Knyaginya Maria Luiza and Han Kubrat stations.

On 26 August 2020, the M2 line was split into two portions: the M2, running from Vitosha station to Obelya station, and the M4, running from Obelya to Sofia Airport. The trains continue to run the length of both lines but on maps and other metro signage the M4 line is gradually being introduced. The split was in preparation to the construction of the Pancho Vladigerov station, which will physically separate the lines and will allow them to have independent timetables. On 19 July 2025, M4 was cut to Slivnitsa, while M2 was cut to Obelya, due to the construction of the new Pancho Vladigerov station, which will open sometime in 2026.

M2 line (Blue)

More information Station, Image ...
StationImageOpened Exits IntermodalityLocation
Obelya
Обеля
20 April 2003 2
Trains arriving from Vitosha station continue as M4 trains to Sofia Airport.
Trains arriving as M4 trains from Sofia Airport continue as M2 trains to Vitosha.
Previously operated by Line M1.
Obelya over the Kakach river
Lomsko shose
Ломско шосе
31 August 2012 4 Lomsko shose Blvd in Vrabnitsa
Beli Dunav
Бели Дунав
Park and ride facilityLomsko shose Blvd and Beli Dunav St, between Nadezhda and Vrabnitsa
Nadezhda
Надежда
2 Lomsko shose Blvd, between Nadezhda I and Nadezhda II
Han Kubrat
Хан Кубрат
4 Lomsko shose, north of Nadezhda Overpass in Triagalnika
Knyaginya Maria Luiza
Княгиня Мария Луиза
Knyaginya Maria Luisa Blvd, south of Nadezhda Overpass in Banishora
Central Railway Station
Централна ж.п. гара
15 BDZ trains, intercity and international busesKnyaginya Maria Luisa Blvd, in front of Sofia Central Station and Central Bus Station Sofia
Lavov most
Лъвов мост
4 Knyaginya Maria Luisa Blvd, north of Lavov Most
Serdica II
Сердика II
12
Knyaginya Maria Luisa Blvd, in front of Central Hali
National Palace of Culture
Национален дворец на културата
11 Northern end of the park of the National Palace of Culture
European Union
Европейски съюз[23]
6 Cherni vrah Blvd, near Earth and Man National Museum and City Center Sofia
James Bourchier
Джеймс Баучер
4 James Bourchier Blvd in Lozenets
Vitosha
Витоша
20 July 2016 6 Cherni vrah Blvd, near Paradise Center in Hladilnika
Cherni vrah
Черни връх
planned Southbound M5 diverges from M2 after this station.Cherni vrah Blvd, between Prof. Marin Goleminov St and Dimitar Manchev St
Dragalevtsi
Драгалевци
Sofia Ring Road interchange with Cherni vrah Blvd
Close

M4 line (Yellow)

More information Station, Image ...
StationImageOpened Exits IntermodalityLocation
Obelya
Обеля
20 April 2003
(withdrawn 19 July 2025)
2
Trains arriving from Vitosha continue as M4 trains to Sofia Airport.
M4 trains arriving from Sofia Airport continue as M2 trains to Vitosha.
Previously operated by line M1
Obelya, over the Kakach river
Pancho Vladigerov
Панчо Владигеров
under construction 2 M2 and M4 terminate Beneath the National Rail, near Obelya Depot
Slivnitsa – Mladost I section shared with M1; see line
Mladost III
Младост III
25 April 2012 4 Andrej Sakharov Blvd, Resen St, and Gen. Radko Dimitriev St
Inter Expo Center – Tsarigradsko shose
Интер Експо Център – Цариградско шосе
Park and ride facilityTsarigradsko shose near Inter Expo Center
Tunnel exit in Druzhba II
Druzhba
Дружба
2 April 2015 7 Between Prof. Tsvetan Lazarov Blvd and Kapt. Dimitar Spisarevski St
Iskarsko shose
Искърско шосе
6 BDZ trains at Iskarsko shose Railway stationIskarsko shose and Krastyo Pastuhov Blvd
Sofiyska Sveta Gora
Софийска Света гора
2 Iskar Industrial zone
Sofia Airport
Летище София
1 Sofia Airport, Terminal 2The departures gate of Sofia Airport, Terminal 2
Close

M3 line (Green)

More information Detailed track map ...
M3 line
Gorna Banya
Ovcha Kupel II
Moesia
Ovcha kupel Tram interchange
Zemlyane Depot
Tsar Boris III Tram interchange
Bulgaria
Medical University
NDK II NDK Metro Station 2
Patriarch Evtimiy
Orlov Most SU St. Kliment Ohridski Metro Station 1 4
Teatralna Tram interchange
Hadzhi Dimitar
Georgi Asparuhov Stadium
Besarаbiya
Gen. Vladimir Vazov
Detailed track map
Line end
Gorna Banya Mainline rail interchange
Ovcha Kupel II
Moesia
Ovcha kupel
to Zemlyane Depot
Tsar Boris III
Bulgaria
Medical University
NDK II
NDK
2
Patriarch Evtimiy
SU St. Kliment Ohridski
1 and 4
Orlov Most
Teatralna
National Rail
to Ihtiman/Karlovo
Hadzhi Dimitar
Line end
Close


The 16 km (9.9 mi) long M3 line is planned to connect the Ovcha Kupel neighbourhood (in southwest Sofia) and the Vasil Levski neighbourhood (in northeast Sofia), with 16 stations in total, including two transfer stations in the city centre, with the rest of the already operational lines. The first 8 stations of the line entered service on 26 August 2020, and another 4 on 24 April 2021. On 14 August 2026, 3 new stations were put into operation on the northern end.[24]

The original plan was to have 8 aboveground and 11 underground stations. The project design contract was awarded to the Czech company Metroprojekt Praha a.s.[25][26][27]

In March 2014, a tender for construction of the central section of the line was announced. The section is 7 km (4.3 mi) long and includes 7 stations, two of them transfer to lines 1 and 2. With the announcement of the tender, it became clear that the initial plans for 19 stations had been partly amended and 2 of the stations, one at Doyran boulevard and another at Shipka street, will not be built. The tunnel of the central section shall be excavated by a tunnel boring machine, while the construction of stations shall be awarded to other companies. The construction of the section shall be completed within 45 months.[28] In January 2015, a tender for 20 trains that shall serve the central section of the line was announced. Driverless train operation, with Grade of Automation 3 (GoA 3), and platform screen doors will ensure the safety of the passengers. Unlike lines 1, 2 and 4, where the trains collect power through a third rail, line 3 trains will be equipped with pantographs.[29][30] CAF and Siemens applied bids in the tender for the trains,[31] with Siemens winning it.[32]

In early 2016, construction began on the third metro line of the Sofia Metro using the technology for classic underground metro with high-power support. Under construction were all metro stations in the central section, the ones in the west and some in the central-east of downtown Sofia. The Krasno selo - Hadzhi Dimitar section opened on 26 August 2020, with the extension from Krasno selo to Gorna banya opening on 24 April 2021.

The third line of the Sofia Metro is planned to have a total of 15 metro stations for the main line and 6 metro stations for the M6 line (Slatina branch), which will split east of Orlov Most.[33][34][35] Currently, 15 stations of the main line are in operation, the last 3 having opened on 14 August 2026.[24] The 6 stations on the M6 Slatina Branch are starting construction since early 2023, and are projected to open in mid 2027.

More information Station, Image ...
StationImageOpened Exits IntermodalityLocation
General Vladimir Vazov [bg]
Владимир Вазов
14 August 2026[24] 4 Vladimir Vazov Blvd and Pop Gruyu St
Besarabia [bg]
Бесарабия
3 Vladimir Vazov Blvd and Vitinya St
Georgi Asparuhov Stadium [bg]
Стадион „Георги Аспарухов"
4 Georgi Asparuhov Stadium, near the intersection of Vladimir Vazov Blvd and Vasil Kanchev St
Hadzhi Dimitar
Хаджи Димитър
26 August 2020[36] 2 Poduyane Bus StationGen. Vladimir Vazov Blvd and Todorini kukli St in Hadzhi Dimitar
Teatralna
Театрална
near Poduyane Railway StationEvlogi i Hristo Georgievi Blvd and Madrid Blvd, near Zaimov park
Orlov Most
Орлов мост
13
Connected to SU St. Kliment Ohridski
Future terminus of M6
Knyazheska gradina park
Sveti Patriarh Evtimiy
Патриарх Евтимий[37]
3 On Patriarh Evtimiy Sq
National Palace of Culture II
Национален дворец на културата II
11 Patriarh Evtimiy Blvd and Vitosha Blvd
Medical University
Медицински университет
5 Praha Blvd and Georgi Sofiyski St
Bulgaria
България
[38] 7 Bulgaria Blvd and Akad. I. E. Geshov Blvd
Krasno Selo
Цар Борис III[39]
[40] 4 Tsar Boris III Blvd and Zhitnitsa St
Ovcha kupel
Овча купел
24 April 2021[41] 5 Ovcha Kupel Blvd and President Lincoln Blvd
Moesia
Мизия
[42] 6 Montevideo St near New Bulgarian University
Ovcha Kupel II
Овча купел II
2 Tsentralna St and Zhiul Losho
Gorna Banya
Горна баня
4 Park and ride facility
BDZ trains on railway line №5
Sofia Ring Road (Boycho Boychev St) and President Lincoln Blvd
Close

M6 line (Purple) under construction

The 6 stations serving Geo Milev, Slatina, and Mladost 1 housing estates is projected to exceed 75,000 daily ridership, and will be an important part of the network. At Trakiya station, there will be an underground park-and-ride facility.

More information Station, Image ...
StationImageOpenedLocation
Krasno Selo – Orlov Most section shared with M3; see line
Sitnyakovo
Ситняково
under constructionGeo Milev St and Sitnyakovo Blvd, servicing Oborishte and Yavorov housing estates
Geo Milev
Гео Милев
Geo Milev St and Nikolai Kopernik St, servicing Geo Milev and Reduta housing estates
Slatina
Слатина
Geo Milev St and Slatinska St, servicing Slatina and Hristo Smirnenski housing estates
SC CSKA
СК ЦСКА
Shipchenski Prohod Blvd near Asen Yordanov Blvd, servicing the area near "CSKA Cherveno Zname" sports center
Arena Sofia
Арена София
Asen Yordanov Blvd near Arena Sofia and Sofia Tech Park
Trakiya
Тракия
Tsarigradsko shose near Dimitar Mollov St, servicing Mladost 1 and Poligona housing estates and The Mall
Close

M5 line (Brown) planned

M5 is a planned line, servicing Studentski grad and Iliyantsi. This line would share more than half of M2's stations.

The Studentski grad branch would start from Cherni vrah Blvd, passing through Vitosha quarter and finally, enter Studentski grad. The Iliyantsi branch would start after Maria Luiza station, joining in on Iliyantsi Blvd, and have 4 stations on it.

Recently, a route has been planned for the Studentski grad branch, including 5 stations with one of them being shared with M2.

More information Station, Image ...
StationImageOpened IntermodalityLocation
Iliyantsi
Илиянци
planned Iliyantsi housing estate
Rozhen
Рожен
Iliyantsi shopping center
Svoboda
Свобода
Svoboda housing estate
Tolstoy
Толстой
Tolstoy housing estate
Maria Luiza – Cherni vrah section shared with M2; see line
Cherni Vrah
Черни Връх
planned Shared station between M2 and M5.
Southbound M5 diverges from M2 after this station.
Cherni vrah Blvd between Prof. Marin Goleminov St and Dimitar Manchev St
Stefan Savov
Стефан Савов
Stefan Savov St and Prof. Georgi Manev St
Simeonovsko shose
Симеоновско шосе
Prof Ivan Stransky St and Simeonovsko shose Blvd
NSA
НСА
Akad. Stefan Mladenov St and Prof. Atanas Ishirkov St
Studentski Grad
Студентски Град
Akad. Stefan Mladenov St between 8-mi dekemvri St and Iordan Iosifov St
Close

Fares and ticketing

The price of a single ticket on the metro is 0.80 euro. It can be issued either by a cashier, or by a vending machine. When obtained, the single ticket must be validated within 30 minutes at a validator. Daily, monthly and yearly tickets and passes are also available.[43]

Since November 1, 2021, one's fare can be paid using a contactless debit or credit card at every station of the network. In addition, passengers can pay using a mobile wallet (Apple Pay, Google Pay, Garmin Pay etc.). The fare is the same price as a paper ticket (0.80 euro for a single) and the amount you pay per day will max out at 2 euro, which is 3 trips (every trip after that is de facto free). The 2 euro max resets every day at 00:00 local time.

Rolling stock

The Sofia Metro operates four types of rolling stock.

Type 81 – 717.4/81 – 714.4 and 81 – 717.4K/81 – 714.4K Nomernoy

The oldest trainets running in the metropolitan are from type metrovagonmash 81 – 717/81 – 714 Nomernoy (modification 81 – 717.4/81 – 714.4), manufactured by the Mytishchi Machine-Building Plant in Mytishchi, Moscow Oblast, then the Soviet Union, in 1989 – 1990. Forty-eight carriages in total (twenty-four 81 – 717.4 head ones numbered 1001 – 1024 and twenty-four 81 – 714.4 intermediate ones numbered 5001 – 5024) were delivered to Bulgaria in 1990 (some eight years prior to the opening of the first section of the metropolitan, which occurred on 28 January 1998). Initially, the trains consisted of three carriages (two head ones and an intermediate one), while today they are all formed up of four carriages (two head ones and two intermediate ones), allowing for twelve four-car trains in total. Eight of these trainsets have been refurbished and now run as 81 – 717.4K/81 – 714.4K rolling stock,[44] while four retain their original appearance. Both original and the modernised Nomernoy trains are being opertated by the Obelya train depot and serve the M1, M2, and M4 metro lines.

Type 81 – 740.2/81 – 741.2 and 81 – 740.2B/81 – 741.2B Rusich

The second generation of rolling stock is from type metrovagonmash 81 – 740/81 – 741 (in modifications 81 – 740.2/81 – 741.2 and 81 – 740.2B/81 – 741.2B) Rusich, also manufactured by Metrovagonmash (the Mytishchi Machine-Building Plant's successor) and delivered over four times between 2005 and 2013. In total, there are 40 three-car such trains (9 in modification 81 – 740.2/741.2 and 31 in modification 81 – 740.2B/741.2B), operated by the Obelya train depot and serving the M1, M2, and M4 metro lines.[19] The head carriages (types 81 – 740.2 and 81 – 740.2B) are numbered 2001 – 2080, while the intermediate ones (types 81 – 741.2 and 81 – 741.2B) are numbered 6001 – 6040.

Type Siemens Inspiro

The third generation of rolling stock in the Sofia Metro is represented by 30 three-car Siemens Inspiro trainsets, delivered between 2016 and 2021. They are being operated by the Zemlyane train depot and serve the M3 metro line exclusively.[45] The head carriages are numbered 3001 – 3060, while the intermediate ones are numbered 7001 – 7030.

Type Škoda Sofia 21Mt/22Mt/23Mt

In July 2023, Škoda Transportation won a contract worth 65 million EUR, to deliver 8 four-car trainsets. The trains are the fourth generation of rolling stock in the Sofia Metro and are from type Škoda Varsovia in the modification Škoda Sofia 21Mt/22Mt/23Mt. All of them are in service since the summer of 2026.[46][47][48] The Škoda Sofia are being operated by the Obelya train depot and serve the M1, M2, and M4 metro lines. The head carriages (type 21Mt) are numbered 4001 – 4016, while the intermediate ones (types 22Mt and 2Mt) are numbered 8001 – 8008 and 9001 – 9008, respectively, with 22Mt standing for intermediate carriages with engines and 23Mt – for intermediate carriages without engines.

Platform screen doors and rope screen doors

Line 1 and 4

On line 1 - (red) and line 4 - (yellow) on 12 stations (see below) are installed rope screen doors. The doors open vertically. The doors have 8 parts:[49]

  1. Entry sensor - detects when the train arrives at station.
  2. RSD - The doors.
  3. Platform control panel (PCP) - is placed on some of columns on the doors. The PCP box has two buttons - one red and green - used for manual operation of the doors.
  4. Emergency opening of doors - on the back of the columns there is a box with three buttons - Red - close; Green - open; Yellow - emergency open. This device is used for emergency opening of the doors.
  5. Train information panel - Controls the whole system.
  6. Driver information display - Displays the status of the doors and if the trains is aligned correctly with the platform.
  7. Laser sensor - Detects how close is the train to the stop point.
  8. Exit sensor - Detects when the train departs from the station.

Stations that have these doors:

  1. Slivnitsa - line 1 and 4
  2. Lyulin - line 1 and 4
  3. Zapaden Park - line 1 and 4
  4. Vardar - line 1 and 4
  5. K. Velichkov - line 1 and 4
  6. Opalchenska - line 1 and 4
  7. Serdica - line 1 and 4
  8. Su. Sv. Kliment Ohridski - line 1 and 4
  9. Vasil Levski Stadium - line 1 and 4
  10. G.M. Dimitrov - line 1 and 4
  11. Mladost 1 - line 1 and 4
  12. IEC - Tsarigradsko Shose - line 4

Line 3

On line 3, there are installed platform screen doors at all stations. These doors open horizontally, unlike on lines 1 and 4.[citation needed]

Ridership

More information Year, Passengers per day ...
Sofia Metro ridership
Year Passengers per day Change Stations
199810,000[50]Steady N/A5
199940,000[citation needed]Increase300.06
200070,000[50]Increase75.07
200180,000[citation needed]Increase14.2
200290,000[51]Increase12.5
200380,000[12]Decrease12.58
200475,000[citation needed]Decrease6.6
200570,000[52]Decrease7.1
200680,000[citation needed]Increase14.2
200790,000[53]Increase12.5
200876,000[54]Decrease15.6
2009201,000[55]Increase164.514
2010187,000[56]Decrease7.0
2011190,000[57]Increase1.614
2012350,000[58]Increase84.227
2013280,000[59]Decrease20.0
2014320,000[59]Increase14.3
2015335,000[60]Increase4.734
2016350,000[60](estimated)Increase4.535
2017350,000[61]Steady0.0
2018
2019
2020200,000

[62](estimated)

Decrease75.043
2021 47
2022 400,000[63] Increase70.0 47
2023 380,000 Decrease23.7 47
2024 470,000 Increase- 47
2025 470,000 Increase17.2 47
2026 550,000 Increase13 50